| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C.E.C., INC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of existing fender system and bumpers
|
lump |
LUMP |
150,000.00 |
150,000.00 |
160,000.00 |
160,000.00 |
|
|
|
|
| 202-02-J |
removal of existing aprons
|
2   |
EACH |
5,500.00 |
11,000.00 |
12,000.00 |
24,000.00 |
|
|
|
|
| 202-02-K |
removal of existing pontoon span
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-L |
removal of existing pivot pier
|
lump |
LUMP |
10,500.00 |
10,500.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-02-M |
removal of existing cable system
|
lump |
LUMP |
14,000.00 |
14,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb, 12" thick
|
260   |
SQYD |
154.00 |
40,040.00 |
66.00 |
17,160.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
260   |
SQYD |
10.00 |
2,600.00 |
3.00 |
780.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,000.00 |
16,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
330,000.00 |
330,000.00 |
|
|
|
|
| 730-09 |
electrical system
|
lump |
LUMP |
110,000.00 |
110,000.00 |
280,000.00 |
280,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
52,000.00 |
52,000.00 |
|
|
|
|
| 804-02-B |
treated timber piles (coastal treatment)
|
10,400   |
LNFT |
21.00 |
218,400.00 |
22.25 |
231,400.00 |
|
|
|
|
| 804-03 |
steel piles (18" dia. piles, 1/2" wall thickness)
|
1,560   |
LNFT |
140.00 |
218,400.00 |
110.00 |
171,600.00 |
|
|
|
|
| 805-01-I |
class a concrete
|
3.27 |
CUYD |
2,700.00 |
8,829.00 |
5,350.00 |
17,494.50 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
519   |
LB |
2.00 |
1,038.00 |
4.00 |
2,076.00 |
|
|
|
|
| 807-06 |
structural metal work
|
lump |
LUMP |
2,200,000.00 |
2,200,000.00 |
1,680,000.00 |
1,680,000.00 |
|
|
|
|
| 809-01 |
movable bridge machinery
|
lump |
LUMP |
520,000.00 |
520,000.00 |
650,000.00 |
650,000.00 |
|
|
|
|
| 812-01-B |
treated timber (coastal treatment)
|
32.06 |
MFBM |
8,400.00 |
269,304.00 |
6,800.00 |
218,008.00 |
|
|
|
|
| S-001 |
paint system
|
lump |
LUMP |
180,000.00 |
180,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
10,000.00 |
20,000.00 |
25,000.00 |
50,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,140,111.00 |
|
4,185,518.50 |
|
|
|
|
|