DBE GOAL FED
Lead Project: 217-01-0016
Parish: LAFAYETTE
Routes: LA 93
Description: I-10 S. RAMP - ST. LANDRY PARISH LINE
Type Const: pavement patching, cold planing asphaltic pavement, superpave asphaltic concrete
overlay, and related work.
Estimated Construction Cost: $2,154,787.53
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $1,804,973.85
2 04089 H & S CONSTRUCTION CO., INC. $1,812,371.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
H & S CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
204-05-A temporary sediment check dams (hay) 4      EACH 1,000.00 4,000.00 260.00 1,040.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,016      CUYD 20.00 40,320.00 30.00 60,480.00        
502-01 superpave asphaltic concrete 16,394.2    TON 75.00 1,229,565.00 72.00 1,180,382.40        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,174.9    TON 20.00 23,498.00 106.00 124,539.40        
509-01 cold planing asphaltic pavement 80,159      SQYD 1.90 152,302.10 2.00 160,318.00        
509-02 contractor retained reclaimed asphaltic pavement - 5,667      CUYD 36.00 - 204,012.00 0.01 - 56.67        
713-01 temporary signs & barricades lump      LUMP 113,500.00 113,500.00 11,000.00 11,000.00        
713-03-A temporary pavement markings (4" width) 7,532      LNFT 0.01 75.32 0.26 1,958.32        
713-03-C temporary pavement markings (8" width) 204      LNFT 0.01 2.04 0.53 108.12        
713-03-E temporary pavement markings (24" width) 2,805      LNFT 0.01 28.05 1.58 4,431.90        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.020  MILE 500.00 5,010.00 381.00 3,817.62        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.606  MILE 1.00 6.61 398.00 2,629.19        
713-05-A temporary pavement markings (solid line)(4" width) 28.332  MILE 1.00 28.33 806.00 22,835.59        
713-06-A temporary pavement legends and symbols (arrow) 4      EACH 1.00 4.00 59.50 238.00        
713-06-C temporary pavement legends and symbols (only) 4      EACH 1.00 4.00 59.50 238.00        
724-01-C pavement patching (16" minimum thickness) 652      SQYD 20.00 13,040.00 121.00 78,892.00        
727-01 mobilization lump      LUMP 180,000.00 180,000.00 40,000.00 40,000.00        
729-16-B object marker assembly (type 2) 8      EACH 100.00 800.00 51.00 408.00        
731-02 reflectorized raised pavement markers 2,190      EACH 5.50 12,045.00 5.72 12,526.80        
732-01-A plastic pavement striping (4" width) 3,766      LNFT 1.00 3,766.00 0.48 1,807.68        
732-01-C plastic pavement striping (8" width) 102      LNFT 2.00 204.00 0.97 98.94        
732-01-E plastic pavement striping (24" width) 1,402      LNFT 5.20 7,290.40 2.90 4,065.80        
732-02-A plastic pavement striping (solid line) (4" width) 14.166  MILE 3,500.00 49,581.00 2,600.40 36,837.27        
732-03-A plastic pavement striping (broken line)(4" width) 3.303  MILE 2,000.00 6,606.00 901.18 2,976.60        
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 500.00 1,000.00 148.50 297.00        
732-04-C plastic pavement legends & symbols (only) 2      EACH 500.00 1,000.00 159.50 319.00        
735-01 mailboxes 116      EACH 10.00 1,160.00 5.50 638.00        
735-02 mailbox supports (single) 62      EACH 200.00 12,400.00 110.00 6,820.00        
735-03 mailbox supports (double) 21      EACH 250.00 5,250.00 215.00 4,515.00        
735-04 mailbox supports (multiple) 5      EACH 300.00 1,500.00 242.00 1,210.00        
740-01 construction layout lump      LUMP 65,000.00 65,000.00 12,000.00 12,000.00        
744-01 traffic control management lump      LUMP 80,000.00 80,000.00 35,000.00 35,000.00        
                       
 CONTRACTOR TOTAL       1,804,973.85   1,812,371.96        