| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
8,979.0 |
SQYD |
3.00 |
26,937.00 |
|
|
|
|
|
|
| 202-02-I-01 |
removal of sign (sta 17+060, rt. parcel 1-3, 4'x8'
wood frame) |
1   |
EACH |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| 202-02-I-02 |
removal of building (sta 20+000, rt. parcel 1-5,
30'x50' wood frame house) |
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
15,105   |
CUYD |
5.50 |
83,077.50 |
|
|
|
|
|
|
| 203-04 |
embankment
|
13,280   |
CUYD |
6.00 |
79,680.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
64   |
EACH |
150.00 |
9,600.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,100   |
LNFT |
3.00 |
3,300.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
199.25 |
TON |
150.00 |
29,887.50 |
|
|
|
|
|
|
| 304-03-D |
lime treatment (type c) (12" thick)
|
8,434   |
SQYD |
1.00 |
8,434.00 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
8,434   |
SQYD |
7.50 |
63,255.00 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
16,868   |
SQYD |
7.50 |
126,510.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
81   |
CUYD |
100.00 |
8,100.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
40.00 |
20,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,565.9 |
TON |
84.00 |
299,535.60 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
175.7 |
TON |
125.00 |
21,962.50 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp)
|
104   |
LNFT |
160.00 |
16,640.00 |
|
|
|
|
|
|
| 701-01-Q |
cross drain pipe (60" rcp)
|
112   |
LNFT |
400.00 |
44,800.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
688   |
LNFT |
50.00 |
34,400.00 |
|
|
|
|
|
|
| 701-07-C |
yard drain pipe (8")
|
140   |
LNFT |
45.00 |
6,300.00 |
|
|
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
2   |
EACH |
2,000.00 |
4,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
2,158   |
LNFT |
6.00 |
12,948.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
445.6 |
SQYD |
50.00 |
22,280.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
16   |
EACH |
250.00 |
4,000.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
16   |
EACH |
250.00 |
4,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.386 |
MILE |
250.00 |
346.50 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.930 |
MILE |
650.00 |
4,504.50 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
10.90 |
ACRE |
600.00 |
6,540.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
981   |
LB |
6.00 |
5,886.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
10,900   |
LB |
0.40 |
4,360.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
14,150   |
SQYD |
1.25 |
17,687.50 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
115.8 |
CUYD |
75.00 |
8,685.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
85.00 |
680.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
92   |
EACH |
5.00 |
460.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.466 |
MILE |
2,150.00 |
7,451.90 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
5   |
EACH |
1.00 |
5.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
250.00 |
1,250.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,157,503.50 |
|
|
|
|
|
|
|