| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - TRAYLOR BRO/MASSMAN CONST A JT VENT |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
755,000.00 |
755,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,734.7 |
SQYD |
9.00 |
15,612.30 |
9.75 |
16,913.33 |
|
|
|
|
| 203-01 |
general excavation
|
676   |
CUYD |
14.00 |
9,464.00 |
15.00 |
10,140.00 |
|
|
|
|
| 203-04 |
embankment
|
1,676   |
CUYD |
43.00 |
72,068.00 |
46.00 |
77,096.00 |
|
|
|
|
| 203-05 |
nonplastic embankment
|
4,340   |
CUYD |
41.00 |
177,940.00 |
44.00 |
190,960.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
15.00 |
300.00 |
16.00 |
320.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,902   |
LNFT |
15.00 |
28,530.00 |
1.80 |
3,423.60 |
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(crushed stone or
recycled pccp) |
5,059.5 |
SQYD |
40.00 |
202,380.00 |
41.00 |
207,439.50 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
75.00 |
7,500.00 |
77.00 |
7,700.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,403.0 |
TON |
150.00 |
810,450.00 |
160.00 |
864,480.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
139.8 |
TON |
150.00 |
20,970.00 |
160.00 |
22,368.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,011   |
SQYD |
15.00 |
15,165.00 |
16.00 |
16,176.00 |
|
|
|
|
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
272   |
LNFT |
80.00 |
21,760.00 |
85.00 |
23,120.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
4,400.00 |
8,800.00 |
4,750.00 |
9,500.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
174   |
LNFT |
10.00 |
1,740.00 |
10.50 |
1,827.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
66   |
LNFT |
10.00 |
660.00 |
10.50 |
693.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
37.3 |
LNFT |
20.00 |
746.00 |
30.00 |
1,119.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
25.0 |
LNFT |
60.00 |
1,500.00 |
87.00 |
2,175.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,600.00 |
2,600.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
4   |
EACH |
160.00 |
640.00 |
250.00 |
1,000.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
4   |
EACH |
60.00 |
240.00 |
200.00 |
800.00 |
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
732.0 |
TON |
75.00 |
54,900.00 |
80.00 |
58,560.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
2,700   |
SQYD |
2.50 |
6,750.00 |
2.70 |
7,290.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.00 |
ACRE |
1,200.00 |
1,200.00 |
1,250.00 |
1,250.00 |
|
|
|
|
| 717-01 |
seeding
|
30   |
LB |
20.00 |
600.00 |
21.00 |
630.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,000   |
LB |
1.00 |
1,000.00 |
1.00 |
1,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,550,000.00 |
20,550,000.00 |
20,710,000.00 |
20,710,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
188.2 |
SQFT |
22.50 |
4,234.50 |
23.00 |
4,328.60 |
|
|
|
|
| 729-02 |
sign (type b)
|
32.8 |
SQFT |
25.00 |
820.00 |
25.00 |
820.00 |
|
|
|
|
| 729-04 |
sign (type d)
|
237.0 |
SQFT |
29.00 |
6,873.00 |
30.00 |
7,110.00 |
|
|
|
|
| 729-05 |
sign (type e)
|
37.6 |
SQFT |
39.00 |
1,466.40 |
40.00 |
1,504.00 |
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
264.0 |
SQFT |
30.00 |
7,920.00 |
31.00 |
8,184.00 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
15   |
EACH |
810.00 |
12,150.00 |
825.00 |
12,375.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
2   |
EACH |
750.00 |
1,500.00 |
775.00 |
1,550.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
4   |
EACH |
1,000.00 |
4,000.00 |
1,050.00 |
4,200.00 |
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,550.00 |
3,100.00 |
|
|
|
|
| 729-12-A |
mounting (overhead butterfly)(structure mounted)
|
3   |
EACH |
22,000.00 |
66,000.00 |
22,500.00 |
67,500.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
1   |
EACH |
75.00 |
75.00 |
105.00 |
105.00 |
|
|
|
|
| 729-18 |
milepost assembly (structure mounted)
|
100   |
EACH |
180.00 |
18,000.00 |
185.00 |
18,500.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
5,840   |
EACH |
14.55 |
84,972.00 |
15.00 |
87,600.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,439   |
EACH |
5.30 |
7,626.70 |
5.50 |
7,914.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.200 |
MILE |
2,340.00 |
30,888.00 |
2,400.00 |
31,680.00 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.200 |
MILE |
4,465.00 |
893.00 |
4,600.00 |
920.00 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.200 |
MILE |
8,930.00 |
1,786.00 |
9,200.00 |
1,840.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.600 |
MILE |
967.00 |
4,448.20 |
1,000.00 |
4,600.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
170.00 |
1,020.00 |
165.00 |
990.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
172.00 |
1,032.00 |
180.00 |
1,080.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,000,000.00 |
2,000,000.00 |
1,400,000.00 |
1,400,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
erosion control mat
|
3,921.7 |
SQYD |
25.00 |
98,042.50 |
25.00 |
98,042.50 |
|
|
|
|
| S-005 |
mounting (slab support)
|
5   |
EACH |
2,660.00 |
13,300.00 |
1,000.00 |
5,000.00 |
|
|
|
|
| S-006 |
resident engineers', housing allowance
|
lump |
LUMP |
500,000.00 |
500,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| S-008 |
field office
|
2   |
EACH |
250,000.00 |
500,000.00 |
150,000.00 |
300,000.00 |
|
|
|
|
| S-110 |
end on construction crane standby time
|
1,500   |
HOUR |
660.00 |
990,000.00 |
90.00 |
135,000.00 |
|
|
|
|
| S-113 |
temporary construction bridge
|
1   |
EACH |
600,000.00 |
600,000.00 |
300,000.00 |
300,000.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
27,783,962.60 |
|
25,387,524.03 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
section a (sta 101+48 to sta 123+14)
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
plan section a (al)-voided slab (long pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-A |
precast concrete piles (24")(sect. a)
|
34,265   |
LNFT |
0.00 |
0.00 |
175.00 |
5,996,375.00 |
|
|
|
|
| 805-03-A |
class aa concrete (sect. a)
|
1,923.29 |
CUYD |
0.00 |
0.00 |
1,000.00 |
1,923,290.00 |
|
|
|
|
| 805-08-K-A |
precast-prestressed concrete girder(voided slab 4'-0"x
1'-3 1/4")(sect.a) |
23,621.0 |
LNFT |
0.00 |
0.00 |
180.00 |
4,251,780.00 |
|
|
|
|
| 805-08-L-A |
precast-prestressed concrete girder(voided slab 3'-0"x
1'-3 1/4")(sect.a) |
118.5 |
LNFT |
0.00 |
0.00 |
175.00 |
20,737.50 |
|
|
|
|
| 805-08-M-A |
precast-prestressed concrete girder(voided slab 2'-10"
x 1-3 1/4")(sect. a) |
2,883.5 |
LNFT |
0.00 |
0.00 |
170.00 |
490,195.00 |
|
|
|
|
| 805-08-N-A |
precast-prestressed concrete girder(voided slab 2'-6"
x 1'-3 1/4")(sect. a) |
1,382.5 |
LNFT |
0.00 |
0.00 |
160.00 |
221,200.00 |
|
|
|
|
| 805-08-O-A |
precast-prestressed concrete girder(voided slab
tapered)(sect. a) |
829.5 |
LNFT |
0.00 |
0.00 |
160.00 |
132,720.00 |
|
|
|
|
| 805-11-A |
strip seal joints (sect.a)
|
827.03 |
LNFT |
0.00 |
0.00 |
200.00 |
165,406.00 |
|
|
|
|
| 806-01-A |
deformed reinforcing steel (sect. a)
|
568,607   |
LB |
0.00 |
0.00 |
0.92 |
523,118.44 |
|
|
|
|
| 807-06-A |
structural metalwork (sect. a)
|
lump |
LUMP |
0.00 |
0.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 810-01-A-A |
concrete railing (barrier)(sect.a)
|
4,320.45 |
LNFT |
0.00 |
0.00 |
38.00 |
164,177.10 |
|
|
|
|
| 810-04-A |
steel and concrete railing (barrier) (sect. a)
|
283.60 |
LNFT |
0.00 |
0.00 |
275.00 |
77,990.00 |
|
|
|
|
| 813-01-A |
concrete approach slabs (sect. a)
|
344.07 |
SQYD |
0.00 |
0.00 |
180.00 |
61,932.60 |
|
|
|
|
| S-111-A |
precast concrete piles (24") adjustment (sect. a)
|
640   |
LNFT |
0.00 |
0.00 |
90.00 |
57,600.00 |
|
|
|
|
| S-119-A |
concrete calibration pile (sect. a)
|
1   |
EACH |
0.00 |
0.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| S-120-A |
class p concrete (precast cap)(sect. a)
|
686.60 |
CUYD |
0.00 |
0.00 |
2,100.00 |
1,441,860.00 |
|
|
|
|
| S-121-A |
post tension system-precast slabs (sect. a)
|
35,413   |
LB |
0.00 |
0.00 |
7.50 |
265,597.50 |
|
|
|
|
| S-122-A |
grout (sect. a)
|
70.47 |
CUYD |
0.00 |
0.00 |
2,500.00 |
176,175.00 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
|
|
16,580,154.14 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
plan section a (as)-voided slab (short pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-A |
precast concrete piles (24") (sect. a)
|
37,860   |
LNFT |
145.00 |
5,489,700.00 |
0.00 |
0.00 |
|
|
|
|
| 805-03-A |
class aa concrete (sect. a)
|
1,923.29 |
CUYD |
450.00 |
865,480.50 |
0.00 |
0.00 |
|
|
|
|
| 805-08-K-A |
precast-prestressed concrete girder(voided slab 4'-0"x
1'-3 1/4")(sect.a) |
23,621.0 |
LNFT |
140.00 |
3,306,940.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-L-A |
precast-prestressed concrete girder(voided slab 3'-0"x
1'-3 1/4")(sect.a) |
118.5 |
LNFT |
185.00 |
21,922.50 |
0.00 |
0.00 |
|
|
|
|
| 805-08-M-A |
precast-prestressed concrete girder(voided slab 2'-10"
x 1-3 1/4")(sect. a) |
2,883.0 |
LNFT |
155.00 |
446,865.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-N-A |
precast-prestressed concrete girder(voided slab 2'-6"
x 1'-3 1/4")(sect. a) |
1,382.5 |
LNFT |
155.00 |
214,287.50 |
0.00 |
0.00 |
|
|
|
|
| 805-08-O-A |
precast-prestressed concrete girder(voided slab
tapered)(sect. a) |
829.5 |
LNFT |
155.00 |
128,572.50 |
0.00 |
0.00 |
|
|
|
|
| 805-11-A |
strip seal joints (sect.a)
|
827.03 |
LNFT |
150.00 |
124,054.50 |
0.00 |
0.00 |
|
|
|
|
| 806-01-A |
deformed reinforcing steel (sect. a)
|
531,747   |
LB |
1.00 |
531,747.00 |
0.00 |
0.00 |
|
|
|
|
| 807-06-A |
structural metalwork(sect. a)
|
lump |
LUMP |
40,000.00 |
40,000.00 |
0.00 |
0.00 |
|
|
|
|
| 810-01-A-A |
concrete railing (barrier)(sect.a)
|
4,320.45 |
LNFT |
43.00 |
185,779.35 |
0.00 |
0.00 |
|
|
|
|
| 810-04-A |
steel and concrete railing (barrier) (sect. a)
|
283.60 |
LNFT |
160.00 |
45,376.00 |
0.00 |
0.00 |
|
|
|
|
| 813-01-A |
concrete approach slabs (sect. a)
|
344.07 |
SQYD |
160.00 |
55,051.20 |
0.00 |
0.00 |
|
|
|
|
| S-111-A |
precast concrete piles (24") adjustment (sect. a)
|
963   |
LNFT |
60.00 |
57,780.00 |
0.00 |
0.00 |
|
|
|
|
| S-119-A |
concrete calibration pile (sect. a)
|
1   |
EACH |
100,000.00 |
100,000.00 |
0.00 |
0.00 |
|
|
|
|
| S-120-A |
class p concrete (precast cap)(sect. a)
|
846.98 |
CUYD |
1,000.00 |
846,980.00 |
0.00 |
0.00 |
|
|
|
|
| S-121-A |
post tension system-precast slabs (sect. a)
|
35,413   |
LB |
6.00 |
212,478.00 |
0.00 |
0.00 |
|
|
|
|
| S-122-A |
grout (sect. a)
|
98.62 |
CUYD |
2,350.00 |
231,757.00 |
0.00 |
0.00 |
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
12,904,771.05 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B |
section b (sta 123+14 to sta 366+92)
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B1 |
plan alt. 1l - voided slab (long pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-B |
precast concrete piles (24")(sect.b)
|
279,110   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-03-B |
class aa concrete (sect. b)
|
16,517.00 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-C-B |
precast-prestressed concrete girder(type iii)(sect. b)
|
784.8 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-K-B |
precast-prestressed concrete girder(voided slab 4'-0"x
1'-3 1/4")(sect.b) |
238,785.4 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-N-B |
precast-prestressed concrete girder(voided slab 2'-6"
x 1'-3 1/4")(sect. b) |
23,878.5 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-11-B |
strip seal joints (sect.b)
|
6,160.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (sect. b)
|
5,160,559   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 807-06-B |
structural metalwork(sect. b)
|
lump |
LUMP |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 810-01-A-B |
concrete railing (barrier)(sect.b)
|
48,756.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-111-B |
precast concrete piles (24") adjustment (sect. b)
|
4,950   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-119-B |
concrete calibration pile (sect. b)
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-120-B |
class p concrete (precast cap)(sect. b)
|
7,238.25 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-121-B |
post tension system-precast slabs (sect. b)
|
214,775   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-122-B |
grout (sect. b)
|
522.25 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B2 |
plan alt. 1s - voided slab (short pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-B |
precast concrete piles (24")(sect.b)
|
330,570   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-03-B |
class aa concrete (sect. b)
|
16,517.00 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-C-B |
precast-prestressed concrete girder(type iii)(sect. b)
|
784.8 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-K-B |
precast-prestressed concrete girder(voided slab 4'-0"x
1'-3 1/4")(sect.b) |
238,785.4 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-N-B |
precast-prestressed concrete girder(voided slab 2'-6"
x 1'-3 1/4")(sect. b) |
23,878.5 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-11-B |
strip seal joints (sect.b)
|
6,160.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (sect. b)
|
4,820,856   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 807-06-B |
structural metalwork(sect. b)
|
lump |
LUMP |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 810-01-A-B |
concrete railing (barrier)(sect.b)
|
48,756.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-111-B |
precast concrete piles (24") adjustment (sect. b)
|
8,008   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-119-B |
concrete calibration pile (sect. b)
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-120-B |
class p concrete (precast cap)(sect. b)
|
7,035.39 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-121-B |
post tension system-precast slabs (sect. b)
|
214,775   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-122-B |
grout (sect. b)
|
813.74 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B3 |
plan alt. 2l - type iii span (long pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-B |
precast concrete piles (24")(sect.b)
|
190,780   |
LNFT |
193.00 |
36,820,540.00 |
165.00 |
31,478,700.00 |
|
|
|
|
| 805-03-B |
class aa concrete (sect. b)
|
28,091.89 |
CUYD |
850.00 |
23,878,106.50 |
1,100.00 |
30,901,079.00 |
|
|
|
|
| 805-08-C-B |
precast-prestressed concrete girder(type iii)(sect. b)
|
96,760.3 |
LNFT |
180.00 |
17,416,854.00 |
150.00 |
14,514,045.00 |
|
|
|
|
| 805-11-B |
strip seal joints (sect.b)
|
3,760.00 |
LNFT |
150.00 |
564,000.00 |
200.00 |
752,000.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (sect. b)
|
7,844,531   |
LB |
1.00 |
7,844,531.00 |
0.92 |
7,216,968.52 |
|
|
|
|
| 807-06-B |
structural metalwork(sect. b)
|
lump |
LUMP |
60,000.00 |
60,000.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| 810-01-A-B |
concrete railing (barrier)(sect.b)
|
48,756.00 |
LNFT |
43.00 |
2,096,508.00 |
38.00 |
1,852,728.00 |
|
|
|
|
| S-111-B |
precast concrete piles (24") adjustment (sect. b)
|
3,058   |
LNFT |
60.00 |
183,480.00 |
90.00 |
275,220.00 |
|
|
|
|
| S-119-B |
concrete calibration pile (sect. b)
|
4   |
EACH |
100,000.00 |
400,000.00 |
300,000.00 |
1,200,000.00 |
|
|
|
|
| S-120-B |
class p concrete (precast cap)(sect. b)
|
6,727.05 |
CUYD |
900.00 |
6,054,345.00 |
1,000.00 |
6,727,050.00 |
|
|
|
|
| S-122-B |
grout (sect. b)
|
420.70 |
CUYD |
3,500.00 |
1,472,450.00 |
2,500.00 |
1,051,750.00 |
|
|
|
|
| | SUBTOTAL ALT B3 |
|
|
|
96,790,814.50 |
|
96,319,540.52 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B4 |
plan alt. 2s - type iii span (short pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-B |
precast concrete piles (24")(sect.b)
|
237,435   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-03-B |
class aa concrete (sect. b)
|
28,091.89 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-C-B |
precast-prestressed concrete girder(type iii)(sect. b)
|
96,760.3 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-11-B |
strip seal joints (sect.b)
|
3,760.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (sect. b)
|
7,519,294   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 807-06-B |
structural metalwork(sect. b)
|
lump |
LUMP |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 810-01-A-B |
concrete railing (barrier)(sect.b)
|
48,756.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-111-B |
precast concrete piles (24") adjustment (sect. b)
|
4,938   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-119-B |
concrete calibration pile (sect. b)
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-120-B |
class p concrete (precast cap)(sect. b)
|
6,265.06 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-122-B |
grout (sect. b)
|
550.22 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B5 |
plan alt. 3l - type bt-63 span (long pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-B |
precast concrete piles (24")(sect.b)
|
1,190   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 804-01-G-B |
precast concrete piles (30")(sect.b)
|
135,595   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-03-B |
class aa concrete (sect. b)
|
30,277.64 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-C-B |
precast-prestressed concrete girder(type iii) (sect. b)
|
734.2 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-J-B |
precast-prestressed concrete girder(type bt-63)(sect.
b) |
96,262.5 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-11-B |
strip seal joints (sect.b)
|
3,440.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (sect. b)
|
7,286,802   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 807-06-B |
structural metalwork(sect. b)
|
lump |
LUMP |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 810-01-A-B |
concrete railing (barrier)(sect.b)
|
48,756.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-111-B |
precast concrete piles (24") adjustment (sect. b)
|
18   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-112-B |
precast concrete piles (30") adjustment (sect. b)
|
2,138   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-119-B |
concrete calibration pile (sect. b)
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-120-B |
class p concrete (precast cap)(sect. b)
|
4,587.10 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-122-B |
grout (sect. b)
|
404.11 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B6 |
plan alt. 3s - type bt-63 span (short pile)
|
|
|
|
|
|
|
|
|
|
|
| 804-01-F-B |
precast concrete piles (24")(sect.b)
|
1,400   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 804-01-G-B |
precast concrete piles (30")(sect.b)
|
163,020   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-03-B |
class aa concrete (sect. b)
|
30,277.64 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-C-B |
precast-prestressed concrete girder(type iii) (sect. b)
|
734.2 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-08-J-B |
precast-prestressed concrete girder(type bt-63)(sect.
b) |
96,262.5 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-11-B |
strip seal joints (sect.b)
|
3,440.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (sect. b)
|
7,201,517   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 807-06-B |
structural metalwork(sect. b)
|
lump |
LUMP |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 810-01-A-B |
concrete railing (barrier)(sect.b)
|
48,756.00 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-111-B |
precast concrete piles (24") adjustment (sect. b)
|
28   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-112-B |
precast concrete piles (30") adjustment (sect. b)
|
3,417   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-119-B |
concrete calibration pile (sect. b)
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-120-B |
class p concrete (precast cap)(sect. b)
|
4,826.63 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-122-B |
grout (sect. b)
|
630.53 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
137,479,548.15 |
|
138,287,218.69 |
|
|
|
|
|