| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 3 - PRAIRIE CONTRACTORS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
1,050.00 |
1,050.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,444   |
SQYD |
12.00 |
17,328.00 |
16.00 |
23,104.00 |
20.00 |
28,880.00 |
|
|
| 202-02-I |
removal of asphalt drives
|
4   |
EACH |
2,343.00 |
9,372.00 |
2,400.00 |
9,600.00 |
1,500.00 |
6,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
30.00 |
3,000.00 |
142.00 |
14,200.00 |
75.00 |
7,500.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
25   |
CUYD |
53.00 |
1,325.00 |
391.00 |
9,775.00 |
200.00 |
5,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,085.7 |
TON |
78.00 |
318,684.60 |
98.00 |
400,398.60 |
100.00 |
408,570.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
859.9 |
TON |
107.00 |
92,009.30 |
75.00 |
64,492.50 |
125.00 |
107,487.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
17,231   |
SQYD |
3.50 |
60,308.50 |
3.00 |
51,693.00 |
3.00 |
51,693.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,265   |
CUYD |
0.01 |
- 12.65 |
1.00 |
- 1,265.00 |
0.01 |
- 12.65 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
9,567   |
LNFT |
2.22 |
21,238.74 |
2.00 |
19,134.00 |
2.00 |
19,134.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
6,440   |
LNFT |
2.22 |
14,296.80 |
2.00 |
12,880.00 |
2.00 |
12,880.00 |
|
|
| 702-04-A |
adjusting manholes
|
16   |
EACH |
410.00 |
6,560.00 |
936.00 |
14,976.00 |
500.00 |
8,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
2,929.00 |
2,929.00 |
2,625.00 |
2,625.00 |
3,000.00 |
3,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,200.00 |
9,200.00 |
14,700.00 |
14,700.00 |
150,000.00 |
150,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
469   |
LNFT |
1.05 |
492.45 |
1.00 |
469.00 |
0.01 |
4.69 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.356 |
MILE |
157.00 |
369.89 |
780.00 |
1,837.68 |
0.01 |
0.02 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.711 |
MILE |
345.00 |
590.30 |
310.00 |
530.41 |
0.01 |
0.02 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
7.250 |
MILE |
556.00 |
4,031.00 |
500.00 |
3,625.00 |
0.01 |
0.07 |
|
|
| 724-01-C |
pavement patching (16" minimum thickness)
|
850   |
SQYD |
124.00 |
105,400.00 |
123.00 |
104,550.00 |
130.00 |
110,500.00 |
|
|
| 724-03 |
pavement joint repair
|
10.0 |
TON |
290.00 |
2,900.00 |
332.00 |
3,320.00 |
300.00 |
3,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,500.00 |
25,500.00 |
29,760.00 |
29,760.00 |
150,000.00 |
150,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
160   |
EACH |
5.72 |
915.20 |
5.00 |
800.00 |
5.00 |
800.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
276   |
LNFT |
0.70 |
193.20 |
1.00 |
276.00 |
1.00 |
276.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
235   |
LNFT |
2.92 |
686.20 |
3.00 |
705.00 |
5.00 |
1,175.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.625 |
MILE |
2,280.00 |
8,265.00 |
2,048.00 |
7,424.00 |
3,000.00 |
10,875.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.856 |
MILE |
692.00 |
592.35 |
625.00 |
535.00 |
1,000.00 |
856.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
146.00 |
146.00 |
131.00 |
131.00 |
200.00 |
200.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
158.00 |
158.00 |
142.00 |
142.00 |
200.00 |
200.00 |
|
|
| 732-05 |
removal of existing markings
|
0.368 |
MILE |
2,855.00 |
1,050.64 |
2,625.00 |
966.00 |
3,000.00 |
1,104.00 |
|
|
| 735-01 |
mailboxes
|
19   |
EACH |
2.34 |
44.46 |
2.00 |
38.00 |
1.00 |
19.00 |
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
199.00 |
3,980.00 |
141.00 |
2,820.00 |
150.00 |
3,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,700.00 |
3,700.00 |
1,500.00 |
1,500.00 |
25,000.00 |
25,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
12,500.00 |
12,500.00 |
7,000.00 |
7,000.00 |
25,000.00 |
25,000.00 |
|
|
| S-001 |
full depth sawcutting of existing portland cement
concrete drives |
8,208   |
INFT |
1.46 |
11,983.68 |
2.00 |
16,416.00 |
1.50 |
12,312.00 |
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
9,567   |
LNFT |
1.63 |
15,594.21 |
2.00 |
19,134.00 |
1.50 |
14,350.50 |
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
6,440   |
LNFT |
1.63 |
10,497.20 |
2.00 |
12,880.00 |
1.50 |
9,660.00 |
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
32,014   |
LNFT |
1.00 |
32,014.00 |
1.00 |
32,014.00 |
1.00 |
32,014.00 |
|
|
| S-930 |
traffic maintenance superpave asphaltic concrete
|
70.0 |
TON |
153.00 |
10,710.00 |
296.00 |
20,720.00 |
200.00 |
14,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
811,553.07 |
|
904,956.19 |
|
1,227,478.15 |
|
|
|