Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 040-03-0026
Parish: GRANT
Routes: LA 8
Description: JCT. US 165 - LASALLE PARISH LINE
Type Const: cold planing asphaltic concrete, asphaltic concrete overlay, pavement patching,
and related work.
Estimated Construction Cost: $4,104,213.44
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,599,691.26
2 05789 D & J CONSTRUCTION CO., INC. $3,652,714.48
3 12312 GILCHRIST CONSTRUCTION CO. LLC $4,172,174.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,268      LNFT 6.00 7,608.00 5.75 7,291.00 10.00 12,680.00    
202-02-I removal of surfacing 101      SQYD 30.00 3,030.00 15.00 1,515.00 20.00 2,020.00    
203-08 borrow (vehicular measurement) 7,952      CUYD 13.14 104,489.28 10.00 79,520.00 18.00 143,136.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
207      CUYD 50.00 10,350.00 20.00 4,140.00 85.00 17,595.00    
502-01 superpave asphaltic concrete 44,681.4    TON 63.00 2,814,928.20 66.50 2,971,313.10 71.00 3,172,379.40    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
761.2    TON 125.00 95,150.00 66.50 50,619.80 160.00 121,792.00    
509-01 cold planing asphaltic pavement 8,662      SQYD 3.00 25,986.00 2.00 17,324.00 3.00 25,986.00    
509-02 contractor retained reclaimed asphaltic pavement - 275      CUYD 0.10 - 27.50 0.01 - 2.75 0.01 - 2.75    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 48.00 4,800.00 45.00 4,500.00 60.00 6,000.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 1,522.0    LNFT 58.00 88,276.00 55.00 83,710.00 51.00 77,622.00    
704-03 blocked out guard rail 275.0    LNFT 20.00 5,500.00 19.00 5,225.00 19.00 5,225.00    
704-07-A guard rail bridge attachments (single thrie beam) 100.0    LNFT 27.00 2,700.00 35.00 3,500.00 38.00 3,800.00    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 58.00 11,600.00 55.00 11,000.00 58.00 11,600.00    
704-11-A guard rail end treatment (flared) 12      EACH 2,175.00 26,100.00 2,000.00 24,000.00 1,865.00 22,380.00    
707-04 asphaltic curb 80.0    LNFT 51.00 4,080.00 70.00 5,600.00 50.00 4,000.00    
713-01 temporary signs & barricades lump      LUMP 5,700.00 5,700.00 13,000.00 13,000.00 7,500.00 7,500.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
18.786  MILE 130.00 2,442.18 175.00 3,287.55 400.00 7,514.40    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
13.227  MILE 1.00 13.23 160.00 2,116.32 100.00 1,322.70    
713-05-A temporary pavement markings (solid line)(4" width) 50.557  MILE 1.00 50.56 1.00 50.56 100.00 5,055.70    
717-01 seeding 390      LB 7.00 2,730.00 7.00 2,730.00 7.10 2,769.00    
718-01 fertilizer 13,002      LB 0.42 5,460.84 0.30 3,900.60 0.30 3,900.60    
721-01 asphalt mulch 28,279      GAL 0.70 19,795.30 1.50 42,418.50 2.55 72,111.45    
724-01-A pavement patching (6" minimum thickness) 600      SQYD 40.00 24,000.00 56.00 33,600.00 80.00 48,000.00    
724-01-B pavement patching (12" minimum thickness) 1,100      SQYD 70.00 77,000.00 86.00 94,600.00 125.00 137,500.00    
727-01 mobilization lump      LUMP 147,000.00 147,000.00 62,000.00 62,000.00 80,000.00 80,000.00    
729-16-C object marker assembly (type 3) 12      EACH 75.00 900.00 70.00 840.00 80.00 960.00    
731-02 reflectorized raised pavement markers 1,207      EACH 5.00 6,035.00 4.00 4,828.00 4.75 5,733.25    
732-02-A plastic pavement striping (solid line) (4" width) 25.278  MILE 2,300.00 58,139.40 2,100.00 53,083.80 2,165.00 54,726.87    
732-03-A plastic pavement striping (broken line)(4" width) 6.614  MILE 855.00 5,654.97 500.00 3,307.00 820.00 5,423.48    
735-01 mailboxes 56      EACH 15.00 840.00 10.00 560.00 50.00 2,800.00    
735-02 mailbox supports (single) 44      EACH 150.00 6,600.00 135.00 5,940.00 150.00 6,600.00    
735-03 mailbox supports (double) 11      EACH 250.00 2,750.00 250.00 2,750.00 200.00 2,200.00    
740-01 construction layout lump      LUMP 5,000.00 5,000.00 20,000.00 20,000.00 6,500.00 6,500.00    
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 65,000.00 65,000.00    
S-001 sawcuts in asphaltic concrete lifts 4,020      LNFT 0.90 3,618.00 0.85 3,417.00 1.00 4,020.00    
S-002 sawing and sealing longitudinal joints in asphaltic
concrete overlay
3,040      LNFT 1.59 4,833.60 1.50 4,560.00 1.50 4,560.00    
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
980      LNFT 1.59 1,558.20 1.50 1,470.00 1.80 1,764.00    
S-004 saw cutting 20,000      inft 0.25 5,000.00 0.75 15,000.00 1.00 20,000.00    
                       
 CONTRACTOR TOTAL       3,599,691.26   3,652,714.48   4,172,174.10    