| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,268   |
LNFT |
6.00 |
7,608.00 |
5.75 |
7,291.00 |
10.00 |
12,680.00 |
|
|
| 202-02-I |
removal of surfacing
|
101   |
SQYD |
30.00 |
3,030.00 |
15.00 |
1,515.00 |
20.00 |
2,020.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
7,952   |
CUYD |
13.14 |
104,489.28 |
10.00 |
79,520.00 |
18.00 |
143,136.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
207   |
CUYD |
50.00 |
10,350.00 |
20.00 |
4,140.00 |
85.00 |
17,595.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
44,681.4 |
TON |
63.00 |
2,814,928.20 |
66.50 |
2,971,313.10 |
71.00 |
3,172,379.40 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
761.2 |
TON |
125.00 |
95,150.00 |
66.50 |
50,619.80 |
160.00 |
121,792.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
8,662   |
SQYD |
3.00 |
25,986.00 |
2.00 |
17,324.00 |
3.00 |
25,986.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 275   |
CUYD |
0.10 |
- 27.50 |
0.01 |
- 2.75 |
0.01 |
- 2.75 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
48.00 |
4,800.00 |
45.00 |
4,500.00 |
60.00 |
6,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,522.0 |
LNFT |
58.00 |
88,276.00 |
55.00 |
83,710.00 |
51.00 |
77,622.00 |
|
|
| 704-03 |
blocked out guard rail
|
275.0 |
LNFT |
20.00 |
5,500.00 |
19.00 |
5,225.00 |
19.00 |
5,225.00 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
100.0 |
LNFT |
27.00 |
2,700.00 |
35.00 |
3,500.00 |
38.00 |
3,800.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
58.00 |
11,600.00 |
55.00 |
11,000.00 |
58.00 |
11,600.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,175.00 |
26,100.00 |
2,000.00 |
24,000.00 |
1,865.00 |
22,380.00 |
|
|
| 707-04 |
asphaltic curb
|
80.0 |
LNFT |
51.00 |
4,080.00 |
70.00 |
5,600.00 |
50.00 |
4,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,700.00 |
5,700.00 |
13,000.00 |
13,000.00 |
7,500.00 |
7,500.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.786 |
MILE |
130.00 |
2,442.18 |
175.00 |
3,287.55 |
400.00 |
7,514.40 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.227 |
MILE |
1.00 |
13.23 |
160.00 |
2,116.32 |
100.00 |
1,322.70 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
50.557 |
MILE |
1.00 |
50.56 |
1.00 |
50.56 |
100.00 |
5,055.70 |
|
|
| 717-01 |
seeding
|
390   |
LB |
7.00 |
2,730.00 |
7.00 |
2,730.00 |
7.10 |
2,769.00 |
|
|
| 718-01 |
fertilizer
|
13,002   |
LB |
0.42 |
5,460.84 |
0.30 |
3,900.60 |
0.30 |
3,900.60 |
|
|
| 721-01 |
asphalt mulch
|
28,279   |
GAL |
0.70 |
19,795.30 |
1.50 |
42,418.50 |
2.55 |
72,111.45 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
600   |
SQYD |
40.00 |
24,000.00 |
56.00 |
33,600.00 |
80.00 |
48,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,100   |
SQYD |
70.00 |
77,000.00 |
86.00 |
94,600.00 |
125.00 |
137,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
147,000.00 |
147,000.00 |
62,000.00 |
62,000.00 |
80,000.00 |
80,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
75.00 |
900.00 |
70.00 |
840.00 |
80.00 |
960.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,207   |
EACH |
5.00 |
6,035.00 |
4.00 |
4,828.00 |
4.75 |
5,733.25 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.278 |
MILE |
2,300.00 |
58,139.40 |
2,100.00 |
53,083.80 |
2,165.00 |
54,726.87 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.614 |
MILE |
855.00 |
5,654.97 |
500.00 |
3,307.00 |
820.00 |
5,423.48 |
|
|
| 735-01 |
mailboxes
|
56   |
EACH |
15.00 |
840.00 |
10.00 |
560.00 |
50.00 |
2,800.00 |
|
|
| 735-02 |
mailbox supports (single)
|
44   |
EACH |
150.00 |
6,600.00 |
135.00 |
5,940.00 |
150.00 |
6,600.00 |
|
|
| 735-03 |
mailbox supports (double)
|
11   |
EACH |
250.00 |
2,750.00 |
250.00 |
2,750.00 |
200.00 |
2,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
6,500.00 |
6,500.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
65,000.00 |
65,000.00 |
|
|
| S-001 |
sawcuts in asphaltic concrete lifts
|
4,020   |
LNFT |
0.90 |
3,618.00 |
0.85 |
3,417.00 |
1.00 |
4,020.00 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
3,040   |
LNFT |
1.59 |
4,833.60 |
1.50 |
4,560.00 |
1.50 |
4,560.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
980   |
LNFT |
1.59 |
1,558.20 |
1.50 |
1,470.00 |
1.80 |
1,764.00 |
|
|
| S-004 |
saw cutting
|
20,000   |
inft |
0.25 |
5,000.00 |
0.75 |
15,000.00 |
1.00 |
20,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,599,691.26 |
|
3,652,714.48 |
|
4,172,174.10 |
|
|
|