| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - AUSTIN BRIDGE & ROAD, LP |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
350,000.00 |
350,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
22,500.00 |
22,500.00 |
7,975.31 |
7,975.31 |
|
|
|
|
| 202-02-A |
removal of bridges (sta. 139+82, 470' x 19', steel
swing span) |
1   |
EACH |
400,000.00 |
400,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
12,749.1 |
SQYD |
12.00 |
152,989.20 |
6.23 |
79,426.89 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
307   |
LNFT |
10.00 |
3,070.00 |
7.78 |
2,388.46 |
|
|
|
|
| 202-02-I |
removal of wood & tin building (lt. of sta. 145+12;
50'x 50') |
1   |
EACH |
3,000.00 |
3,000.00 |
3,190.10 |
3,190.10 |
|
|
|
|
| 203-01 |
general excavation
|
16,655   |
CUYD |
8.00 |
133,240.00 |
6.69 |
111,421.95 |
|
|
|
|
| 203-02 |
drainage excavation
|
101   |
CUYD |
18.00 |
1,818.00 |
11.16 |
1,127.16 |
|
|
|
|
| 203-04 |
embankment
|
38,211   |
CUYD |
15.00 |
573,165.00 |
14.67 |
560,555.37 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
150.00 |
1,500.00 |
233.58 |
2,335.80 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
10,100   |
LNFT |
2.88 |
29,088.00 |
2.33 |
23,533.00 |
|
|
|
|
| 302-02-D-01 |
class ii base course (12" thick) (crushed stone or
recycled pccp) |
14,997.4 |
SQYD |
35.00 |
524,909.00 |
47.73 |
715,825.90 |
|
|
|
|
| 302-02-E-01 |
class ii base course (10 1/2" thick) (crushed stone or
recycled pccp) |
186.2 |
SQYD |
45.00 |
8,379.00 |
66.64 |
12,408.37 |
|
|
|
|
| 304-01 |
lime
|
193.41 |
TON |
130.00 |
25,143.30 |
202.00 |
39,068.82 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
15,119   |
SQYD |
1.25 |
18,898.75 |
2.83 |
42,786.77 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,157   |
CUYD |
50.00 |
57,850.00 |
156.89 |
181,521.73 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
65.00 |
13,000.00 |
177.58 |
35,516.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,867.2 |
TON |
100.00 |
386,720.00 |
157.30 |
608,310.56 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
49.3 |
TON |
185.00 |
9,120.50 |
291.00 |
14,346.30 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
136   |
LNFT |
110.00 |
14,960.00 |
151.54 |
20,609.44 |
|
|
|
|
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
175   |
LNFT |
220.00 |
38,500.00 |
255.22 |
44,663.50 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
278   |
LNFT |
65.00 |
18,070.00 |
87.72 |
24,386.16 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
107   |
LNFT |
75.00 |
8,025.00 |
103.69 |
11,094.83 |
|
|
|
|
| 701-05-O |
side drain pipe (48")
|
111   |
LNFT |
150.00 |
16,650.00 |
159.52 |
17,706.72 |
|
|
|
|
| 701-14-A |
cleaning existing pipes (cross drain @ sta. 108+37.97)
|
56   |
LNFT |
50.00 |
2,800.00 |
31.90 |
1,786.40 |
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
2   |
EACH |
6,000.00 |
12,000.00 |
5,582.73 |
11,165.46 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
500.0 |
LNFT |
19.00 |
9,500.00 |
29.59 |
14,795.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
85.64 |
8,564.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
3,114.45 |
12,457.80 |
|
|
|
|
| 708-01 |
right-of-way monument
|
7   |
EACH |
200.00 |
1,400.00 |
311.45 |
2,180.15 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
7   |
EACH |
200.00 |
1,400.00 |
233.58 |
1,635.06 |
|
|
|
|
| 711-01-D |
riprap (55 lb, 1.5' thickness)
|
2,864   |
SQYD |
50.00 |
143,200.00 |
95.71 |
274,113.44 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
37   |
SQYD |
175.00 |
6,475.00 |
233.58 |
8,642.46 |
|
|
|
|
| 712-04 |
flexible revetment
|
1,934   |
SQYD |
47.00 |
90,898.00 |
77.86 |
150,581.24 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
34,511.12 |
34,511.12 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.862 |
MILE |
250.00 |
215.50 |
2,335.83 |
2,013.49 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.556 |
MILE |
220.00 |
562.32 |
1,557.21 |
3,980.23 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
30,000   |
SQYD |
0.10 |
3,000.00 |
1.87 |
56,100.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
88.3 |
CUYD |
75.00 |
6,622.50 |
103.69 |
9,155.83 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
630,000.00 |
630,000.00 |
680,000.00 |
680,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
116.79 |
467.16 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
132   |
EACH |
12.00 |
1,584.00 |
18.69 |
2,467.08 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
220   |
EACH |
6.00 |
1,320.00 |
9.34 |
2,054.80 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.556 |
MILE |
2,800.00 |
7,156.80 |
4,671.67 |
11,940.79 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.862 |
MILE |
800.00 |
689.60 |
1,557.22 |
1,342.32 |
|
|
|
|
| 735-01 |
mailboxes
|
11   |
EACH |
10.00 |
110.00 |
15.57 |
171.27 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
150.00 |
1,650.00 |
233.58 |
2,569.38 |
|
|
|
|
| 739-01 |
hydro-seeding
|
11.20 |
ACRE |
950.00 |
10,640.00 |
1,479.37 |
16,568.94 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
72,500.00 |
72,500.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
37,420.95 |
37,420.95 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
200   |
LNFT |
70.00 |
14,000.00 |
104.94 |
20,988.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,740   |
LNFT |
80.00 |
139,200.00 |
113.41 |
197,333.40 |
|
|
|
|
| 804-01-H |
precast concrete piles (36")
|
1,320   |
LNFT |
500.00 |
660,000.00 |
296.38 |
391,221.60 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
1   |
EACH |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
5.15 |
CUYD |
2,000.00 |
10,300.00 |
1,754.56 |
9,035.98 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
127.20 |
CUYD |
1,200.00 |
152,640.00 |
1,210.97 |
154,035.38 |
|
|
|
|
| 805-03 |
class aa concrete
|
543.96 |
CUYD |
1,100.00 |
598,356.00 |
700.00 |
380,772.00 |
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
2,984.6 |
LNFT |
225.00 |
671,535.00 |
226.46 |
675,892.52 |
|
|
|
|
| 805-11 |
strip seal joints
|
60.00 |
LNFT |
150.00 |
9,000.00 |
345.98 |
20,758.80 |
|
|
|
|
| 805-12 |
reinforced concrete box culverts (3'x 2')
|
27.0 |
LNFT |
400.00 |
10,800.00 |
518.41 |
13,997.07 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
169,271   |
LB |
1.00 |
169,271.00 |
1.48 |
250,521.08 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
10,000.00 |
10,000.00 |
14,232.12 |
14,232.12 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
1,280.00 |
LNFT |
45.00 |
57,600.00 |
84.45 |
108,096.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
266.26 |
SQYD |
185.00 |
49,258.10 |
254.24 |
67,693.94 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,477,079.57 |
|
6,931,461.40 |
|
|
|
|
|