DBE GOAL FED
Lead Project: 036-04-0050
Parish: FRANKLIN, TENSAS
Routes: LA 4
Description: TENSAS RIVER BRIDGE AND APPROACHES
Type Const: grading, drainage structures, lime trmt, class ii base course, superpave asph conc
pvmt, precast-prestressed conc girders and related work.
Estimated Construction Cost: $5,235,364.95
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $6,477,079.57
2 42076 AUSTIN BRIDGE & ROAD, LP $6,931,461.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
AUSTIN BRIDGE & ROAD, LP

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 350,000.00 350,000.00 150,000.00 150,000.00        
202-01 removal of structures & obstructions lump      LUMP 22,500.00 22,500.00 7,975.31 7,975.31        
202-02-A removal of bridges (sta. 139+82, 470' x 19', steel
swing span)
1      EACH 400,000.00 400,000.00 500,000.00 500,000.00        
202-02-G removal of surfacing & stabilized base 12,749.1    SQYD 12.00 152,989.20 6.23 79,426.89        
202-02-H removal of guard rail 307      LNFT 10.00 3,070.00 7.78 2,388.46        
202-02-I removal of wood & tin building (lt. of sta. 145+12;
50'x 50')
1      EACH 3,000.00 3,000.00 3,190.10 3,190.10        
203-01 general excavation 16,655      CUYD 8.00 133,240.00 6.69 111,421.95        
203-02 drainage excavation 101      CUYD 18.00 1,818.00 11.16 1,127.16        
203-04 embankment 38,211      CUYD 15.00 573,165.00 14.67 560,555.37        
204-05-A temporary sediment check dams (hay) 10      EACH 150.00 1,500.00 233.58 2,335.80        
204-06 temporary silt fencing 10,100      LNFT 2.88 29,088.00 2.33 23,533.00        
302-02-D-01 class ii base course (12" thick) (crushed stone or
recycled pccp)
14,997.4    SQYD 35.00 524,909.00 47.73 715,825.90        
302-02-E-01 class ii base course (10 1/2" thick) (crushed stone or
recycled pccp)
186.2    SQYD 45.00 8,379.00 66.64 12,408.37        
304-01 lime 193.41   TON 130.00 25,143.30 202.00 39,068.82        
304-04-D lime treatment (type d) (12" thick) 15,119      SQYD 1.25 18,898.75 2.83 42,786.77        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,157      CUYD 50.00 57,850.00 156.89 181,521.73        
402-01 traffic maintenance aggregate (vehicular measurement) 200.0    CUYD 65.00 13,000.00 177.58 35,516.00        
502-01 superpave asphaltic concrete 3,867.2    TON 100.00 386,720.00 157.30 608,310.56        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
49.3    TON 185.00 9,120.50 291.00 14,346.30        
701-01-K cross drain pipe (30" rcp/pcp) 136      LNFT 110.00 14,960.00 151.54 20,609.44        
701-01-Q cross drain pipe (60" rcp/pcp) 175      LNFT 220.00 38,500.00 255.22 44,663.50        
701-05-G side drain pipe (18") 278      LNFT 65.00 18,070.00 87.72 24,386.16        
701-05-I side drain pipe (24") 107      LNFT 75.00 8,025.00 103.69 11,094.83        
701-05-O side drain pipe (48") 111      LNFT 150.00 16,650.00 159.52 17,706.72        
701-14-A cleaning existing pipes (cross drain @ sta. 108+37.97) 56      LNFT 50.00 2,800.00 31.90 1,786.40        
702-08-B side drain safety end (type 2) 2      EACH 6,000.00 12,000.00 5,582.73 11,165.46        
704-03 blocked out guard rail 500.0    LNFT 19.00 9,500.00 29.59 14,795.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 85.64 8,564.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 3,114.45 12,457.80        
708-01 right-of-way monument 7      EACH 200.00 1,400.00 311.45 2,180.15        
708-02 right-of-way monument witness post 7      EACH 200.00 1,400.00 233.58 1,635.06        
711-01-D riprap (55 lb, 1.5' thickness) 2,864      SQYD 50.00 143,200.00 95.71 274,113.44        
712-01-A concrete cast-in-place revetment (4" thick) 37      SQYD 175.00 6,475.00 233.58 8,642.46        
712-04 flexible revetment 1,934      SQYD 47.00 90,898.00 77.86 150,581.24        
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 34,511.12 34,511.12        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.862  MILE 250.00 215.50 2,335.83 2,013.49        
713-05-A temporary pavement markings (solid line)(4" width) 2.556  MILE 220.00 562.32 1,557.21 3,980.23        
720-01-A erosion control system, slope protection (type a) 30,000      SQYD 0.10 3,000.00 1.87 56,100.00        
722-01 project site laboratory 1      EACH 6,000.00 6,000.00 5,000.00 5,000.00        
726-01 bedding material 88.3    CUYD 75.00 6,622.50 103.69 9,155.83        
727-01 mobilization lump      LUMP 630,000.00 630,000.00 680,000.00 680,000.00        
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 116.79 467.16        
731-01 nonreflectorized raised pavement markers 132      EACH 12.00 1,584.00 18.69 2,467.08        
731-02 reflectorized raised pavement markers 220      EACH 6.00 1,320.00 9.34 2,054.80        
732-02-A plastic pavement striping (solid line) (4" width) 2.556  MILE 2,800.00 7,156.80 4,671.67 11,940.79        
732-03-A plastic pavement striping (broken line)(4" width) 0.862  MILE 800.00 689.60 1,557.22 1,342.32        
735-01 mailboxes 11      EACH 10.00 110.00 15.57 171.27        
735-02 mailbox supports (single) 11      EACH 150.00 1,650.00 233.58 2,569.38        
739-01 hydro-seeding 11.20   ACRE 950.00 10,640.00 1,479.37 16,568.94        
740-01 construction layout lump      LUMP 72,500.00 72,500.00 50,000.00 50,000.00        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 37,420.95 37,420.95        
804-01-B precast concrete piles (14") 200      LNFT 70.00 14,000.00 104.94 20,988.00        
804-01-C precast concrete piles (16") 1,740      LNFT 80.00 139,200.00 113.41 197,333.40        
804-01-H precast concrete piles (36") 1,320      LNFT 500.00 660,000.00 296.38 391,221.60        
804-12 loading permanent piles 1      EACH 4,000.00 4,000.00 10,000.00 10,000.00        
804-17 dynamic monitoring 1      EACH 2,000.00 2,000.00 5,000.00 5,000.00        
805-01-B class a concrete (box culvert headwalls) 5.15   CUYD 2,000.00 10,300.00 1,754.56 9,035.98        
805-01-F class a concrete (bents) 127.20   CUYD 1,200.00 152,640.00 1,210.97 154,035.38        
805-03 class aa concrete 543.96   CUYD 1,100.00 598,356.00 700.00 380,772.00        
805-08-D precast-prestressed concrete girders (type iv) 2,984.6    LNFT 225.00 671,535.00 226.46 675,892.52        
805-11 strip seal joints 60.00   LNFT 150.00 9,000.00 345.98 20,758.80        
805-12 reinforced concrete box culverts (3'x 2') 27.0    LNFT 400.00 10,800.00 518.41 13,997.07        
806-01 deformed reinforcing steel 169,271      LB 1.00 169,271.00 1.48 250,521.08        
807-06 structural metalwork lump      LUMP 10,000.00 10,000.00 14,232.12 14,232.12        
810-01 concrete railing (barrier) 1,280.00   LNFT 45.00 57,600.00 84.45 108,096.00        
813-01 concrete approach slabs 266.26   SQYD 185.00 49,258.10 254.24 67,693.94        
                       
 CONTRACTOR TOTAL       6,477,079.57   6,931,461.40        