| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
- 2 - KNISH CORPORATION |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
80   |
SQYD |
18.00 |
1,440.00 |
35.00 |
2,800.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
1,435.0 |
LNFT |
10.00 |
14,350.00 |
10.00 |
14,350.00 |
|
|
|
|
| 202-02-I |
removal of median
|
11,859.3 |
SQYD |
21.75 |
257,939.78 |
5.00 |
59,296.50 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
102,935.50 |
102,935.50 |
|
|
|
|
| 302-02-E |
class ii base course (8" thick)
|
11,859.3 |
SQYD |
23.00 |
272,763.90 |
11.42 |
135,433.21 |
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
11,859.3 |
SQYD |
60.00 |
711,558.00 |
90.00 |
1,067,337.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
15   |
EACH |
135.00 |
2,025.00 |
250.00 |
3,750.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
34,000   |
LNFT |
1.65 |
56,100.00 |
1.50 |
51,000.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
30,771   |
LNFT |
1.65 |
50,772.15 |
2.50 |
76,927.50 |
|
|
|
|
| 602-05-I |
full depth patching of jointed concrete pavement (9"
thick) |
1,000.0 |
SQYD |
165.00 |
165,000.00 |
250.00 |
250,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
2,250.00 |
2,250.00 |
1,250.00 |
1,250.00 |
|
|
|
|
| 706-01-B |
concrete walk (5" thick)
|
140.5 |
SQYD |
55.00 |
7,727.50 |
180.00 |
25,290.00 |
|
|
|
|
| 707-01 |
concrete curb
|
1,200.0 |
LNFT |
15.00 |
18,000.00 |
25.00 |
30,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
120,000.00 |
120,000.00 |
52,500.00 |
52,500.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.555 |
MILE |
295.00 |
2,523.73 |
325.00 |
2,780.38 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
10.229 |
MILE |
475.00 |
4,858.78 |
650.00 |
6,648.85 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
70   |
EACH |
50.00 |
3,500.00 |
75.00 |
5,250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,900   |
EACH |
5.10 |
9,690.00 |
4.50 |
8,550.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,845   |
LNFT |
0.84 |
1,549.80 |
1.00 |
1,845.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
2,598   |
LNFT |
2.95 |
7,664.10 |
3.00 |
7,794.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.229 |
MILE |
2,150.00 |
21,992.35 |
2,150.00 |
21,992.35 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.555 |
MILE |
760.00 |
6,501.80 |
800.00 |
6,844.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
70   |
EACH |
145.00 |
10,150.00 |
150.00 |
10,500.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
425.00 |
1,700.00 |
400.00 |
1,600.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
2.241 |
MILE |
5,200.00 |
11,653.20 |
4,000.00 |
8,964.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| S-001 |
truncated domes
|
276   |
EACH |
42.00 |
11,592.00 |
60.00 |
16,560.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
4   |
EACH |
10,500.00 |
42,000.00 |
3,500.00 |
14,000.00 |
|
|
|
|
| S-003 |
interconnect cable (6 pair) aerial
|
14,695   |
LNFT |
9.75 |
143,276.25 |
9.60 |
141,072.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,183,578.34 |
|
2,382,270.29 |
|
|
|
|
|