| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DENTON-JAMES LLC |
- 4 - H & S CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
500,000.00 |
500,000.00 |
500,000.00 |
500,000.00 |
900,000.00 |
900,000.00 |
500,000.00 |
500,000.00 |
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
| 202-02-A |
removal of bridges (sta. 117+25.63; 18.593 m x 9.750 m
concrete t-girder bridge) |
1   |
ea |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
22,000.00 |
22,000.00 |
25.00 |
25.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
23,303   |
sq m |
4.50 |
104,863.50 |
6.00 |
139,818.00 |
5.50 |
128,166.50 |
10.00 |
233,030.00 |
| 202-02-D |
removal of concrete walks & drives
|
2,508   |
sq m |
10.00 |
25,080.00 |
10.00 |
25,080.00 |
9.00 |
22,572.00 |
8.00 |
20,064.00 |
| 202-02-H |
removal of guard rail
|
330   |
ln m |
20.00 |
6,600.00 |
15.00 |
4,950.00 |
14.00 |
4,620.00 |
20.00 |
6,600.00 |
| 202-02-01 |
removal of 3.0 m x 3.7 m shed (lt. of sta. 17+00)
|
1   |
ea |
500.00 |
500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-02 |
removal of 23.6 m x 11.9 m brick residence (lt. of
sta. 17+40)(contains non-friable asb. & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
15,000.00 |
15,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
| 202-02-03 |
removal of 7.7 m x 6.2 m shed (lt. of sta. 18+15)
|
1   |
ea |
1,000.00 |
1,000.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
200.00 |
200.00 |
| 202-02-04 |
removal of 8.8 m x 12.9 wood frame residence (lt. of
sta. 18+25) contains non-friable asbestos) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-05 |
removal of sign (lt. of sta. 19+00)
|
1   |
ea |
1,000.00 |
1,000.00 |
400.00 |
400.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-06 |
removal of 7.6 m x 6.1 m metal commercial building
(lt. of sta. 19+50) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 202-02-07 |
removal of sign (lt. of sta. 19+75)
|
1   |
ea |
1,000.00 |
1,000.00 |
350.00 |
350.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-08 |
removal of 12.4 m x 17.0 m wood frame residence(lt. of
sta. 20+90)(contains non-friable asbestos & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
| 202-02-09 |
removal of 24.3 m x 8.5 m wood frame residence (lt. of
sta. 22+40)(contains non-friable asbestos & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
| 202-02-10 |
removal of sign (lamar)(lt. of sta. 22+85)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-11 |
removal of sign (lamar)(lt. of sta. 23+70)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-12 |
removal of sign (lamar)(lt. of sta. 25+20)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-13 |
removal of 14.6 m x 18.3 m cinder block commercial
building (lt. of sta. 27+30) |
1   |
ea |
1,000.00 |
1,000.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
| 202-02-14 |
removal of 14.3 m x 27.3 m brick residence (lt. of
sta. 28+25) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
| 202-02-15 |
removal of entrance gate and fence (lt. of sta. 29+80)
|
1   |
ea |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
| 202-02-16 |
removal of sign (alicia hay farm and woodlawn baptist
church)(lt. of sta. 43+25) |
1   |
ea |
500.00 |
500.00 |
200.00 |
200.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-17 |
removal of 9.3 m x 7.3 m wood frame residence (lt. of
sta. 49+65) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
| 202-02-18 |
removal of 8.8 m x 19.0 m brick residence (lt. of sta.
52+15)(contains non-friable asbestos) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 202-02-19 |
removal of 9.6 m x 10.5 m wood frame residence (lt. of
sta. 42+75)(contains non-friable asbestos & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
| 202-02-20 |
removal of 6.0 m x 8.1 m shed (lt. of sta. 54+75)
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-21 |
removal of 2.8 m x 3.8 m shed (lt. of sta. 54+85)
|
1   |
ea |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-22 |
removal of 16.0 m x 7.4 m wood frame residence (lt. of
sta. 57+25) |
1   |
ea |
1,000.00 |
1,000.00 |
6,000.00 |
6,000.00 |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
| 202-02-23 |
removal of 13.5 m x 9.6 m shed (lt. of sta. 57+45)
|
1   |
ea |
1,000.00 |
1,000.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
| 202-02-24 |
removal of sign (lamar)(rt. of sta. 60+00)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-25 |
removal of 10.9 m x 19.0 m brick residence (lt. of
sta. 60_+50)(contains non-friable asbestos) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
| 202-02-26 |
removal of 10.7 m x 9.2 m garage (lt. of sta. 60+75)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-27 |
removal of 7.4 m x 10.8 m shed (lt. of sta. 60+85)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-28 |
removal of sign (rt. of sta. 61+55)
|
1   |
ea |
1,000.00 |
1,000.00 |
400.00 |
400.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-29 |
removal of 7.4 m x 5.6 m cinder block building (lt. of
sta. 110+25) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-30 |
removal of sign (double lamar)(lt. of sta. 111+15)
|
1   |
ea |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-31 |
removal of 21.6 m x 10.5 m wood frame residence (lt.
of sta. 111+25) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 202-02-32 |
removal of 22.3 m x 9.9 m wood frame residence(lt. of
sta. 111+65)(contains non-friable asbestos & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 202-02-33 |
removal of 20.7 m x 14.8 m wood frame residence (lt.
of sta. 112+10) |
1   |
ea |
1,000.00 |
1,000.00 |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
| 202-02-34 |
removal of 18.8 m x 15.2 m wood frame residence (lt.
of sta. 112+50) |
1   |
ea |
1,000.00 |
1,000.00 |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
| 202-02-35 |
removal of 15.3 m x 30.5 m metal frame building (rt.
of sta. 112+70) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
| 202-02-36 |
removal of 14.7 m x 9.3 m wood frame residence(lt. of
sta. 112+90)(contains non-friable asbestos & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
| 202-02-37 |
removal of 12.5 m x 12.5 m wood frame residence (lt.
of sta. 113+50) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
| 202-02-38 |
removal of 7.5 m x 7.3 m wood frame commercial
building (rt. of sta. 114+25) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-39 |
removal of 7.5 m x 13.5 m wood frame residence (lt. of
sta. 114+30) |
1   |
ea |
1,000.00 |
1,000.00 |
6,500.00 |
6,500.00 |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
| 202-02-40 |
removal of 4.0 m x 3.5 m shed (lt. of sta. 114+50)
|
1   |
ea |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-41 |
removal of sign (lamar)(rt. of sta. 115+15)
|
1   |
ea |
500.00 |
500.00 |
400.00 |
400.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 202-02-42 |
removal of 19.3 m x 8.6 m wood frame residence(lt. of
sta. 127+60)(contains non-friable asbestos & ext. transite siding) |
1   |
ea |
1,000.00 |
1,000.00 |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
| 202-02-43 |
removal of 7.3 m x 18.5 m mobile home and shed (lt. of
sta. 160+25) (contains non-friable asbestos) |
1   |
ea |
1,000.00 |
1,000.00 |
6,000.00 |
6,000.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
| 202-02-44 |
removal of 8.5 m x 20.4 m mobile home (lt. of sta.
161+70) |
1   |
ea |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
| 202-02-45 |
removal of sign (quiet oaks)(lt. of sta. 167+25)
|
1   |
ea |
500.00 |
500.00 |
400.00 |
400.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-46 |
removal of 5.0 m x 4.8 m shed (lt. of sta. 175+40)
|
1   |
ea |
500.00 |
500.00 |
4,500.00 |
4,500.00 |
1.00 |
1.00 |
500.00 |
500.00 |
| 202-02-47 |
removal of water well and tank (lt. of sta. 175+10)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
3,500.00 |
3,500.00 |
| 203-01 |
general excavation
|
145,355   |
cu m |
4.00 |
581,420.00 |
5.00 |
726,775.00 |
4.50 |
654,097.50 |
5.00 |
726,775.00 |
| 203-02 |
drainage excavation
|
10,204   |
cu m |
6.00 |
61,224.00 |
10.00 |
102,040.00 |
11.00 |
112,244.00 |
10.00 |
102,040.00 |
| 203-03 |
muck excavation
|
3,671   |
cu m |
11.00 |
40,381.00 |
15.00 |
55,065.00 |
16.00 |
58,736.00 |
12.00 |
44,052.00 |
| 203-04 |
embankment
|
159,454   |
cu m |
8.00 |
1,275,632.00 |
13.00 |
2,072,902.00 |
10.00 |
1,594,540.00 |
12.00 |
1,913,448.00 |
| 203-05-A |
non-plastic embankment (stone)
|
3,234   |
cu m |
100.00 |
323,400.00 |
100.00 |
323,400.00 |
130.00 |
420,420.00 |
100.00 |
323,400.00 |
| 204-02 |
temporary hay or straw bales
|
424   |
ea |
12.00 |
5,088.00 |
30.00 |
12,720.00 |
8.00 |
3,392.00 |
6.00 |
2,544.00 |
| 204-03 |
temporary slope drains
|
240   |
ln m |
25.00 |
6,000.00 |
15.00 |
3,600.00 |
45.00 |
10,800.00 |
30.00 |
7,200.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
34   |
ea |
275.00 |
9,350.00 |
250.00 |
8,500.00 |
100.00 |
3,400.00 |
75.00 |
2,550.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
15   |
ea |
600.00 |
9,000.00 |
1,000.00 |
15,000.00 |
700.00 |
10,500.00 |
1,000.00 |
15,000.00 |
| 204-06 |
temporary silt fencing
|
16,978   |
ln m |
7.00 |
118,846.00 |
5.00 |
84,890.00 |
4.30 |
73,005.40 |
3.30 |
56,027.40 |
| 204-07 |
temporary stone construction entrance
|
2   |
ea |
1,500.00 |
3,000.00 |
2,200.00 |
4,400.00 |
2,000.00 |
4,000.00 |
3,000.00 |
6,000.00 |
| 302-02-E-01 |
class ii base course (125 mm thick)(stone or recycled
pccp) |
14,717.0 |
sq m |
13.00 |
191,321.00 |
16.00 |
235,472.00 |
15.00 |
220,755.00 |
13.00 |
191,321.00 |
| 302-02-H-01 |
class ii base course (350 mm thick)(stone or recycled
pccp) |
40,538.4 |
sq m |
30.75 |
1,246,555.80 |
31.00 |
1,256,690.40 |
33.00 |
1,337,767.20 |
35.00 |
1,418,844.00 |
| 304-05 |
lime treatment (type e)
|
1,621.25 |
Mg |
200.00 |
324,250.00 |
100.00 |
162,125.00 |
290.00 |
470,162.50 |
175.00 |
283,718.75 |
| 305-01-D |
subgrade layer (300 mm thick)
|
202,661   |
sq m |
6.50 |
1,317,296.50 |
7.25 |
1,469,292.25 |
8.00 |
1,621,288.00 |
8.00 |
1,621,288.00 |
| 401-01 |
aggregate surface course (net section)
|
975.2 |
cu m |
90.00 |
87,768.00 |
85.00 |
82,892.00 |
70.00 |
68,264.00 |
100.00 |
97,520.00 |
| 402-01 |
traffic maintenance aggregate (adjusted vehicular
measurement) |
750.0 |
cu m |
90.00 |
67,500.00 |
90.00 |
67,500.00 |
75.00 |
56,250.00 |
100.00 |
75,000.00 |
| 701-01-G |
cross drain pipe (450 mm rcp/pcp)
|
578.5 |
ln m |
165.00 |
95,452.50 |
285.00 |
164,872.50 |
240.00 |
138,840.00 |
300.00 |
173,550.00 |
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
193.9 |
ln m |
200.00 |
38,780.00 |
300.00 |
58,170.00 |
310.00 |
60,109.00 |
400.00 |
77,560.00 |
| 701-01-N |
cross drain pipe (1050 mm rcp/pcp)
|
18.1 |
ln m |
379.00 |
6,859.90 |
530.00 |
9,593.00 |
390.00 |
7,059.00 |
800.00 |
14,480.00 |
| 701-02-B |
cross drain pipe arch (450 mm equiv. rcpa)
|
85.8 |
ln m |
180.00 |
15,444.00 |
320.00 |
27,456.00 |
260.00 |
22,308.00 |
350.00 |
30,030.00 |
| 701-02-D |
cross drain pipe arch (600 mm equiv. rcpa)
|
279.7 |
ln m |
243.00 |
67,967.10 |
350.00 |
97,895.00 |
290.00 |
81,113.00 |
500.00 |
139,850.00 |
| 701-02-E |
cross drain pipe arch (750 mm equiv. rcpa)
|
37.6 |
ln m |
283.00 |
10,640.80 |
360.00 |
13,536.00 |
310.00 |
11,656.00 |
600.00 |
22,560.00 |
| 701-02-F |
cross drain pipe arch (900 mm equiv. rcpa)
|
261.7 |
ln m |
344.00 |
90,024.80 |
460.00 |
120,382.00 |
420.00 |
109,914.00 |
700.00 |
183,190.00 |
| 701-02-G |
cross drain pipe arch (1050 mm equiv. rcpa)
|
61.0 |
ln m |
440.00 |
26,840.00 |
585.00 |
35,685.00 |
460.00 |
28,060.00 |
1,000.00 |
61,000.00 |
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
212.5 |
ln m |
170.00 |
36,125.00 |
240.00 |
51,000.00 |
160.00 |
34,000.00 |
300.00 |
63,750.00 |
| 701-05-G |
side drain pipe (450 mm)
|
146.7 |
ln m |
160.00 |
23,472.00 |
250.00 |
36,675.00 |
170.00 |
24,939.00 |
300.00 |
44,010.00 |
| 701-05-I |
side drain pipe (600 mm)
|
232.5 |
ln m |
200.00 |
46,500.00 |
275.00 |
63,937.50 |
190.00 |
44,175.00 |
400.00 |
93,000.00 |
| 701-05-K |
side drain pipe (750 mm)
|
123.0 |
ln m |
255.00 |
31,365.00 |
285.00 |
35,055.00 |
210.00 |
25,830.00 |
500.00 |
61,500.00 |
| 701-05-K-01 |
side drain pipe (750 mm)(erosion)
|
40.0 |
ln m |
260.00 |
10,400.00 |
450.00 |
18,000.00 |
180.00 |
7,200.00 |
200.00 |
8,000.00 |
| 701-05-M-01 |
side drain pipe (900 mm)(erosion)
|
64.0 |
ln m |
335.00 |
21,440.00 |
475.00 |
30,400.00 |
220.00 |
14,080.00 |
200.00 |
12,800.00 |
| 701-05-N |
side drain pipe (1050 mm)
|
55.0 |
ln m |
410.00 |
22,550.00 |
800.00 |
44,000.00 |
270.00 |
14,850.00 |
800.00 |
44,000.00 |
| 701-06-E |
side drain pipe arch (750 mm equiv.)
|
141.4 |
ln m |
290.00 |
41,006.00 |
350.00 |
49,490.00 |
200.00 |
28,280.00 |
500.00 |
70,700.00 |
| 701-06-F |
side drain pipe arch (900 mm equiv.)
|
360.7 |
ln m |
350.00 |
126,245.00 |
360.00 |
129,852.00 |
240.00 |
86,568.00 |
700.00 |
252,490.00 |
| 701-06-G |
side drain pipe arch (1050 mm equiv.)
|
76.1 |
ln m |
468.70 |
35,668.07 |
500.00 |
38,050.00 |
260.00 |
19,786.00 |
1,000.00 |
76,100.00 |
| 701-06-H |
side drain pipe arch (1200 mm equiv.)
|
19.6 |
ln m |
585.00 |
11,466.00 |
800.00 |
15,680.00 |
360.00 |
7,056.00 |
1,100.00 |
21,560.00 |
| 701-06-I |
side drain pipe arch (1350 mm equiv.)
|
53.9 |
ln m |
685.00 |
36,921.50 |
850.00 |
45,815.00 |
400.00 |
21,560.00 |
1,300.00 |
70,070.00 |
| 701-10-G |
reinforced concrete pipe (extension)(450 mm)
|
3.1 |
ln m |
375.00 |
1,162.50 |
1,200.00 |
3,720.00 |
680.00 |
2,108.00 |
650.00 |
2,015.00 |
| 701-10-K |
reinforced concrete pipe (extension)(750 mm)
|
4.2 |
ln m |
380.00 |
1,596.00 |
1,000.00 |
4,200.00 |
600.00 |
2,520.00 |
700.00 |
2,940.00 |
| 702-02-A |
manholes (mh-06m)
|
2   |
ea |
6,000.00 |
12,000.00 |
7,000.00 |
14,000.00 |
4,000.00 |
8,000.00 |
3,000.00 |
6,000.00 |
| 702-03-A |
catch basins (cb-01m)
|
46   |
ea |
2,000.00 |
92,000.00 |
2,500.00 |
115,000.00 |
2,600.00 |
119,600.00 |
3,000.00 |
138,000.00 |
| 704-01-B |
guard rail (single thrie beam)(1905 mm post spacing)
|
37.00 |
ln m |
100.00 |
3,700.00 |
115.00 |
4,255.00 |
95.00 |
3,515.00 |
95.00 |
3,515.00 |
| 704-03 |
blocked out guard rail
|
600.47 |
ln m |
62.00 |
37,229.14 |
60.00 |
36,028.20 |
57.00 |
34,226.79 |
57.00 |
34,226.79 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
76.20 |
ln m |
134.00 |
10,210.80 |
180.00 |
13,716.00 |
125.00 |
9,525.00 |
125.00 |
9,525.00 |
| 704-11-A |
guard rail end treatment (flared)
|
10   |
ea |
2,100.00 |
21,000.00 |
2,100.00 |
21,000.00 |
2,000.00 |
20,000.00 |
2,000.00 |
20,000.00 |
| 705-01 |
barbed wire fence
|
1,002   |
ln m |
17.00 |
17,034.00 |
18.00 |
18,036.00 |
15.50 |
15,531.00 |
15.50 |
15,531.00 |
| 705-04 |
single swinging driveway gates
|
6   |
ea |
500.00 |
3,000.00 |
550.00 |
3,300.00 |
450.00 |
2,700.00 |
450.00 |
2,700.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
658   |
ln m |
50.00 |
32,900.00 |
70.00 |
46,060.00 |
46.00 |
30,268.00 |
50.00 |
32,900.00 |
| 705-06-B |
chain link fence (1500 mm height)
|
224   |
ln m |
70.00 |
15,680.00 |
80.00 |
17,920.00 |
66.00 |
14,784.00 |
70.00 |
15,680.00 |
| 705-08-A |
4.0-meter double gates for chain link fence (1200mm
height) |
1   |
dbgt |
1,200.00 |
1,200.00 |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
| 706-02-C |
concrete drive (150 mm thick)
|
657.1 |
sq m |
50.00 |
32,855.00 |
60.00 |
39,426.00 |
60.00 |
39,426.00 |
60.00 |
39,426.00 |
| 708-01 |
right-of-way monument
|
115   |
ea |
100.00 |
11,500.00 |
400.00 |
46,000.00 |
120.00 |
13,800.00 |
160.00 |
18,400.00 |
| 708-02 |
right-of-way monument witness post
|
115   |
ea |
100.00 |
11,500.00 |
400.00 |
46,000.00 |
120.00 |
13,800.00 |
160.00 |
18,400.00 |
| 709-01 |
steel cattle guard
|
3   |
ea |
10,000.00 |
30,000.00 |
13,000.00 |
39,000.00 |
15,000.00 |
45,000.00 |
13,000.00 |
39,000.00 |
| 712-04 |
flexible revetment
|
3,897   |
sq m |
80.00 |
311,760.00 |
90.00 |
350,730.00 |
70.00 |
272,790.00 |
55.00 |
214,335.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
100,000.00 |
100,000.00 |
160,000.00 |
160,000.00 |
150,000.00 |
150,000.00 |
300,000.00 |
300,000.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
624   |
ea |
0.38 |
237.12 |
1.30 |
811.20 |
0.35 |
218.40 |
1.20 |
748.80 |
| 716-01-A |
mulch (vegetative)
|
7.4 |
hctr |
1,800.00 |
13,320.00 |
1,800.00 |
13,320.00 |
1,630.00 |
12,062.00 |
1,500.00 |
11,100.00 |
| 717-01 |
seeding
|
1,800   |
kg |
18.00 |
32,400.00 |
16.00 |
28,800.00 |
17.00 |
30,600.00 |
15.00 |
27,000.00 |
| 718-01 |
fertilizer
|
43,000   |
kg |
0.59 |
25,370.00 |
0.70 |
30,100.00 |
0.55 |
23,650.00 |
0.50 |
21,500.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
17,391   |
sq m |
2.00 |
34,782.00 |
1.63 |
28,347.33 |
1.30 |
22,608.30 |
1.50 |
26,086.50 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
2,559   |
sq m |
3.00 |
7,677.00 |
3.00 |
7,677.00 |
2.90 |
7,421.10 |
2.00 |
5,118.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
25,000.00 |
25,000.00 |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
| 724-02-C |
pavement patching (400 mm thick)
|
353   |
sq m |
95.00 |
33,535.00 |
185.00 |
65,305.00 |
100.00 |
35,300.00 |
50.00 |
17,650.00 |
| 725-02 |
temporary detour roads
|
5,155.2 |
sq m |
75.00 |
386,640.00 |
75.00 |
386,640.00 |
70.00 |
360,864.00 |
100.00 |
515,520.00 |
| 726-01 |
bedding material
|
1,381.7 |
cu m |
100.00 |
138,170.00 |
100.00 |
138,170.00 |
75.00 |
103,627.50 |
100.00 |
138,170.00 |
| 727-01 |
mobilization
|
lump |
lump |
2,125,000.00 |
2,125,000.00 |
2,400,000.00 |
2,400,000.00 |
2,700,000.00 |
2,700,000.00 |
2,700,000.00 |
2,700,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
10   |
ea |
80.00 |
800.00 |
75.00 |
750.00 |
75.00 |
750.00 |
75.00 |
750.00 |
| 729-19-C |
dead end road installation (type c)
|
3   |
ea |
1,500.00 |
4,500.00 |
1,000.00 |
3,000.00 |
1,700.00 |
5,100.00 |
1,450.00 |
4,350.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,511   |
ea |
6.00 |
15,066.00 |
5.50 |
13,810.50 |
5.00 |
12,555.00 |
5.50 |
13,810.50 |
| 732-01-C |
plastic pavement striping (200 mm width)
|
503   |
ln m |
3.54 |
1,780.62 |
1.50 |
754.50 |
3.30 |
1,659.90 |
1.50 |
754.50 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
151   |
ln m |
10.61 |
1,602.11 |
4.00 |
604.00 |
9.90 |
1,494.90 |
4.00 |
604.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
44.985 |
km |
1,422.62 |
63,996.56 |
1,600.00 |
71,976.00 |
1,330.00 |
59,830.05 |
1,500.00 |
67,477.50 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
15   |
ea |
160.81 |
2,412.15 |
140.00 |
2,100.00 |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
15   |
ea |
160.81 |
2,412.15 |
160.00 |
2,400.00 |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
ea |
428.82 |
428.82 |
500.00 |
500.00 |
400.00 |
400.00 |
450.00 |
450.00 |
| 732-05 |
removal of existing markings
|
29.580 |
km |
100.00 |
2,958.00 |
2,400.00 |
70,992.00 |
2,500.00 |
73,950.00 |
3,600.00 |
106,488.00 |
| 735-01 |
mailboxes
|
65   |
ea |
15.00 |
975.00 |
50.00 |
3,250.00 |
1.00 |
65.00 |
6.00 |
390.00 |
| 735-02 |
mailbox supports (single)
|
65   |
ea |
150.00 |
9,750.00 |
200.00 |
13,000.00 |
130.00 |
8,450.00 |
145.00 |
9,425.00 |
| 740-01 |
construction layout
|
lump |
lump |
150,000.00 |
150,000.00 |
320,000.00 |
320,000.00 |
260,000.00 |
260,000.00 |
300,000.00 |
300,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
lump |
25,000.00 |
25,000.00 |
80,000.00 |
80,000.00 |
30,000.00 |
30,000.00 |
80,000.00 |
80,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
30,000.00 |
30,000.00 |
120,000.00 |
120,000.00 |
30,000.00 |
30,000.00 |
140,000.00 |
140,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
1,515.8 |
ln m |
200.00 |
303,160.00 |
170.00 |
257,686.00 |
200.00 |
303,160.00 |
200.00 |
303,160.00 |
| 804-01-D |
precast concrete piles (450 mm)
|
810.0 |
ln m |
226.00 |
183,060.00 |
185.00 |
149,850.00 |
250.00 |
202,500.00 |
300.00 |
243,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
171.32 |
cu m |
1,200.00 |
205,584.00 |
1,200.00 |
205,584.00 |
1,100.00 |
188,452.00 |
1,200.00 |
205,584.00 |
| 805-01-F |
class a concrete (bents)
|
169.27 |
cu m |
1,200.00 |
203,124.00 |
950.00 |
160,806.50 |
1,100.00 |
186,197.00 |
1,200.00 |
203,124.00 |
| 805-03 |
class aa concrete
|
665.26 |
cu m |
850.00 |
565,471.00 |
650.00 |
432,419.00 |
650.00 |
432,419.00 |
1,000.00 |
665,260.00 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
359.00 |
ln m |
850.00 |
305,150.00 |
900.00 |
323,100.00 |
800.00 |
287,200.00 |
1,100.00 |
394,900.00 |
| 805-12-F-01 |
reinforced concrete box culverts (extension)(1500 mm x
1200 mm) |
51.70 |
ln m |
1,100.00 |
56,870.00 |
1,900.00 |
98,230.00 |
1,050.00 |
54,285.00 |
1,400.00 |
72,380.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
242.40 |
ln m |
100.00 |
24,240.00 |
1,000.00 |
242,400.00 |
1,100.00 |
266,640.00 |
1,700.00 |
412,080.00 |
| 805-12-I-01 |
reinforced concrete box culverts (extension)(1500 mm x
1500 mm) |
268.00 |
ln m |
1,200.00 |
321,600.00 |
950.00 |
254,600.00 |
1,200.00 |
321,600.00 |
1,500.00 |
402,000.00 |
| 806-01 |
deformed reinforcing steel
|
94,465   |
kg |
2.00 |
188,930.00 |
1.75 |
165,313.75 |
1.80 |
170,037.00 |
3.50 |
330,627.50 |
| 810-01 |
concrete railing (barrier)
|
288.00 |
ln m |
256.00 |
73,728.00 |
180.00 |
51,840.00 |
150.00 |
43,200.00 |
275.00 |
79,200.00 |
| 813-01 |
concrete approach slabs
|
1,180.80 |
sq m |
200.00 |
236,160.00 |
190.00 |
224,352.00 |
200.00 |
236,160.00 |
250.00 |
295,200.00 |
| S-001 |
rumble strips (ground-in)
|
26.3 |
km |
400.00 |
10,520.00 |
500.00 |
13,150.00 |
440.00 |
11,572.00 |
360.00 |
9,468.00 |
| S-002 |
rice levees
|
4,662   |
ln m |
5.25 |
24,475.50 |
15.00 |
69,930.00 |
50.00 |
233,100.00 |
12.00 |
55,944.00 |
| S-003 |
plugging existing water wells
|
1   |
ea |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
250.00 |
250.00 |
| S-004 |
protected prairie grass area signs
|
237   |
ea |
19.00 |
4,503.00 |
260.00 |
61,620.00 |
30.00 |
7,110.00 |
100.00 |
23,700.00 |
| S-101 |
retroreflective sheeting panels
|
lump |
lump |
8,000.00 |
8,000.00 |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
250.00 |
250.00 |
| S-102 |
settlement plate installation and monitoring
|
4   |
ea |
2,500.00 |
10,000.00 |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
1,000.00 |
4,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
13,867,958.94 |
|
16,306,385.63 |
|
16,259,442.04 |
|
18,241,161.24 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 302-02-G-01 |
class ii base course (225 mm thick)(stone or recycled
pccp) |
156,353.3 |
sq m |
20.00 |
3,127,066.00 |
22.00 |
3,439,772.60 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
68,001.8 |
Mg |
92.00 |
6,256,165.60 |
95.00 |
6,460,171.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,280.2 |
Mg |
132.00 |
168,986.40 |
145.00 |
185,629.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
4.500 |
km |
240.00 |
1,080.00 |
475.00 |
2,137.50 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
19.383 |
km |
396.00 |
7,675.67 |
480.00 |
9,303.84 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
2.730 |
km |
8,000.00 |
21,840.00 |
10,000.00 |
27,300.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
25.386 |
km |
500.00 |
12,693.00 |
400.00 |
10,154.40 |
0.00 |
0.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
9,595,506.67 |
|
10,134,468.34 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 302-02-F-01 |
class ii base course (200 mm thick)(stone or recycled
pccp) |
153,018.1 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
18.50 |
2,830,834.85 |
20.00 |
3,060,362.00 |
| 302-02-G-01 |
class ii base course (225 mm thick)(stone or recycled
pccp) |
3,335.2 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
25.00 |
83,380.00 |
25.00 |
83,380.00 |
| 502-01 |
superpave asphaltic concrete
|
5,307.9 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
530,790.00 |
100.00 |
530,790.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
204.9 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
200.00 |
40,980.00 |
120.00 |
24,588.00 |
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
128,033.9 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
46.00 |
5,889,559.40 |
47.00 |
6,017,593.30 |
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
24,984.2 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
64.00 |
1,598,988.80 |
65.00 |
1,623,973.00 |
| 713-04-B-01 |
temporary pvmt. markings (broken line)(100 mm w)(3.0 m
l)(type i removable) |
4.500 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
2,100.00 |
9,450.00 |
150.00 |
675.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
9.931 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
400.00 |
3,972.40 |
455.00 |
4,518.61 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
6.204 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
8,200.00 |
50,872.80 |
10,000.00 |
62,040.00 |
| 732-03-A-01 |
temporary pavement markings (broken line)(100 mm width)
(preformed marking tape - type v) |
25.386 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
3,300.00 |
83,773.80 |
2,460.00 |
62,449.56 |
| | SUBTOTAL ALT A2 |
|
|
|
|
|
|
|
11,122,602.05 |
|
11,470,369.47 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
23,463,465.61 |
|
26,440,853.97 |
|
27,382,044.09 |
|
29,711,530.71 |
| | NUMBER OF DAYS BID AT $2,900 PER DAY. |
|
|
|
1,740,000.00 |
|
2,030,000.00 |
|
2,030,000.00 |
|
2,030,000.00 |
| | LIFE CYCLE COST |
|
|
|
2,098,800.00 |
|
2,098,800.00 |
|
896,500.00 |
|
896,500.00 |
| | TOTAL BID |
|
|
|
27,302,265.61 |
|
30,569,653.97 |
|
30,308,544.09 |
|
32,638,030.71 |
|