| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
377   |
LNFT |
7.00 |
2,639.00 |
8.00 |
3,016.00 |
6.50 |
2,450.50 |
6.00 |
2,262.00 |
| 203-08 |
borrow (vehicular measurement)
|
2,085   |
CUYD |
16.00 |
33,360.00 |
8.00 |
16,680.00 |
15.00 |
31,275.00 |
16.00 |
33,360.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
84   |
EACH |
100.00 |
8,400.00 |
95.00 |
7,980.00 |
100.00 |
8,400.00 |
100.00 |
8,400.00 |
| 204-06 |
temporary silt fencing
|
3,770   |
LNFT |
3.00 |
11,310.00 |
1.40 |
5,278.00 |
2.00 |
7,540.00 |
1.50 |
5,655.00 |
| 502-01 |
superpave asphaltic concrete
|
9,086.2 |
TON |
66.00 |
599,689.20 |
63.00 |
572,430.60 |
72.00 |
654,206.40 |
80.00 |
726,896.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,292.0 |
TON |
125.00 |
161,500.00 |
125.00 |
161,500.00 |
100.00 |
129,200.00 |
1.00 |
1,292.00 |
| 509-01 |
cold planing asphaltic pavement
|
43,638   |
SQYD |
1.70 |
74,184.60 |
2.00 |
87,276.00 |
2.00 |
87,276.00 |
2.00 |
87,276.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 682   |
CUYD |
0.10 |
- 68.20 |
0.10 |
- 68.20 |
0.00 |
0.00 |
5.00 |
- 3,410.00 |
| 701-10-I |
reinforced concrete pipe (extension) (24")
|
8   |
LNFT |
200.00 |
1,600.00 |
200.00 |
1,600.00 |
250.00 |
2,000.00 |
250.00 |
2,000.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,500.00 |
3,000.00 |
600.00 |
1,200.00 |
1,200.00 |
2,400.00 |
1,600.00 |
3,200.00 |
| 704-01-A |
guard rail (single thrie beam) (3'-1 1/2" post spacing)
|
100.0 |
LNFT |
34.00 |
3,400.00 |
40.00 |
4,000.00 |
55.00 |
5,500.00 |
36.00 |
3,600.00 |
| 704-01-B |
guard rail (single thrie beam) (6'-3" post spacing)
|
156.0 |
LNFT |
52.00 |
8,112.00 |
50.00 |
7,800.00 |
30.00 |
4,680.00 |
54.00 |
8,424.00 |
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
20.00 |
2,000.00 |
20.00 |
2,000.00 |
25.00 |
2,500.00 |
22.00 |
2,200.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,100.00 |
8,400.00 |
2,000.00 |
8,000.00 |
2,600.00 |
10,400.00 |
2,300.00 |
9,200.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
130.3 |
SQYD |
50.00 |
6,515.00 |
70.00 |
9,121.00 |
100.00 |
13,030.00 |
60.00 |
7,818.00 |
| 707-01 |
concrete curb
|
242.0 |
LNFT |
15.00 |
3,630.00 |
30.00 |
7,260.00 |
40.00 |
9,680.00 |
17.00 |
4,114.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
55,000.00 |
55,000.00 |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
415   |
LNFT |
0.45 |
186.75 |
0.20 |
83.00 |
1.00 |
415.00 |
0.40 |
166.00 |
| 713-03-D |
temporary pavement markings (12" width)
|
364   |
LNFT |
0.90 |
327.60 |
0.40 |
145.60 |
1.50 |
546.00 |
1.00 |
364.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
577   |
LNFT |
1.36 |
784.72 |
0.60 |
346.20 |
2.00 |
1,154.00 |
1.40 |
807.80 |
| 713-04-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
8.670 |
MILE |
140.21 |
1,215.62 |
500.00 |
4,335.00 |
350.00 |
3,034.50 |
170.00 |
1,473.90 |
| 713-04-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
1.573 |
MILE |
412.52 |
648.89 |
100.00 |
157.30 |
420.00 |
660.66 |
370.00 |
582.01 |
| 713-05-A |
temporary pavement markings (solid line) (4" width)
|
10.427 |
MILE |
500.00 |
5,213.50 |
100.00 |
1,042.70 |
850.00 |
8,862.95 |
740.00 |
7,715.98 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
9   |
EACH |
60.00 |
540.00 |
20.00 |
180.00 |
65.00 |
585.00 |
60.00 |
540.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
60.00 |
360.00 |
20.00 |
120.00 |
65.00 |
390.00 |
60.00 |
360.00 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
200.00 |
400.00 |
80.00 |
160.00 |
250.00 |
500.00 |
200.00 |
400.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,000   |
SQYD |
85.00 |
85,000.00 |
100.00 |
100,000.00 |
80.00 |
80,000.00 |
100.00 |
100,000.00 |
| 724-02 |
pavement widening
|
2,008.0 |
SQYD |
64.00 |
128,512.00 |
60.00 |
120,480.00 |
60.00 |
120,480.00 |
67.00 |
134,536.00 |
| 726-01 |
bedding material
|
24.6 |
CUYD |
70.00 |
1,722.00 |
80.00 |
1,968.00 |
80.00 |
1,968.00 |
80.00 |
1,968.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
51,000.00 |
51,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
130,000.00 |
130,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
75.00 |
750.00 |
80.00 |
800.00 |
80.00 |
800.00 |
90.00 |
900.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,210   |
EACH |
5.00 |
6,050.00 |
6.00 |
7,260.00 |
6.00 |
7,260.00 |
6.00 |
7,260.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
715   |
LNFT |
1.00 |
715.00 |
1.00 |
715.00 |
1.10 |
786.50 |
1.30 |
929.50 |
| 732-01-D |
plastic pavement striping (12" width)
|
364   |
LNFT |
3.30 |
1,201.20 |
3.00 |
1,092.00 |
3.50 |
1,274.00 |
2.00 |
728.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
600   |
LNFT |
3.30 |
1,980.00 |
3.00 |
1,800.00 |
4.00 |
2,400.00 |
4.00 |
2,400.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.427 |
MILE |
2,400.00 |
25,024.80 |
2,500.00 |
26,067.50 |
2,500.00 |
26,067.50 |
2,400.00 |
25,024.80 |
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
1.800 |
MILE |
750.00 |
1,350.00 |
800.00 |
1,440.00 |
800.00 |
1,440.00 |
700.00 |
1,260.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
9   |
EACH |
150.00 |
1,350.00 |
150.00 |
1,350.00 |
160.00 |
1,440.00 |
150.00 |
1,350.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
160.00 |
960.00 |
150.00 |
900.00 |
200.00 |
1,200.00 |
160.00 |
960.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
475.00 |
950.00 |
200.00 |
400.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
| 735-01 |
mailboxes
|
60   |
EACH |
15.00 |
900.00 |
5.00 |
300.00 |
6.00 |
360.00 |
1.00 |
60.00 |
| 735-02 |
mailbox supports (single)
|
60   |
EACH |
150.00 |
9,000.00 |
130.00 |
7,800.00 |
125.00 |
7,500.00 |
130.00 |
7,800.00 |
| 739-01 |
hydro-seeding
|
4.12 |
ACRE |
900.00 |
3,708.00 |
1,000.00 |
4,120.00 |
1,000.00 |
4,120.00 |
1,000.00 |
4,120.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
45,000.00 |
45,000.00 |
15,000.00 |
15,000.00 |
26,000.00 |
26,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
8,000.00 |
8,000.00 |
45,000.00 |
45,000.00 |
35,000.00 |
35,000.00 |
40,000.00 |
40,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.16 |
CUYD |
1,400.00 |
25,424.00 |
500.00 |
9,080.00 |
1,000.00 |
18,160.00 |
1,500.00 |
27,240.00 |
| 805-12-A |
reinforced concrete box culverts (4' x 3')
|
40.0 |
LNFT |
386.00 |
15,440.00 |
330.00 |
13,200.00 |
600.00 |
24,000.00 |
500.00 |
20,000.00 |
| 805-12-Y |
reinforced concrete box culverts (4' x 2')
|
54.0 |
LNFT |
375.00 |
20,250.00 |
330.00 |
17,820.00 |
500.00 |
27,000.00 |
400.00 |
21,600.00 |
| 806-01 |
deformed reinforcing steel
|
1,368   |
LB |
2.14 |
2,927.52 |
1.00 |
1,368.00 |
3.00 |
4,104.00 |
2.20 |
3,009.60 |
| S-001 |
u-channel post installation
|
91   |
each |
55.00 |
5,005.00 |
60.00 |
5,460.00 |
75.00 |
6,825.00 |
70.00 |
6,370.00 |
| S-002 |
relocating ditches
|
600   |
LNFT |
9.00 |
5,400.00 |
10.00 |
6,000.00 |
8.00 |
4,800.00 |
9.00 |
5,400.00 |
| S-003 |
saw cutting of asphaltic concrete and trenching
roadway (12" depth) |
278   |
LNFT |
6.50 |
1,807.00 |
10.00 |
2,780.00 |
15.00 |
4,170.00 |
15.00 |
4,170.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,356,775.20 |
|
1,428,843.70 |
|
1,478,841.01 |
|
1,518,782.59 |
|