Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 013-06-0049
Parish: LIVINGSTON
Routes: US 190, LA 1026, LA 1027
Description: INTERSECTION IMPROVEMENTS FOR US 190 @ LA 1026
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete overlay, pavement patching, pavement widening, and related work.
Estimated Construction Cost: $1,454,655.78
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,356,775.20
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,428,843.70
3 00046 BARBER BROS. CONTRACTING CO., L.L.C $1,478,841.01
4 06276 BARRIERE CONSTRUCTION CO., LLC. $1,518,782.59
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
BARBER BROS. CONTRACTING CO., L.L.C
- 4 -
BARRIERE CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 377      LNFT 7.00 2,639.00 8.00 3,016.00 6.50 2,450.50 6.00 2,262.00
203-08 borrow (vehicular measurement) 2,085      CUYD 16.00 33,360.00 8.00 16,680.00 15.00 31,275.00 16.00 33,360.00
204-05-A temporary sediment check dams (hay) 84      EACH 100.00 8,400.00 95.00 7,980.00 100.00 8,400.00 100.00 8,400.00
204-06 temporary silt fencing 3,770      LNFT 3.00 11,310.00 1.40 5,278.00 2.00 7,540.00 1.50 5,655.00
502-01 superpave asphaltic concrete 9,086.2    TON 66.00 599,689.20 63.00 572,430.60 72.00 654,206.40 80.00 726,896.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,292.0    TON 125.00 161,500.00 125.00 161,500.00 100.00 129,200.00 1.00 1,292.00
509-01 cold planing asphaltic pavement 43,638      SQYD 1.70 74,184.60 2.00 87,276.00 2.00 87,276.00 2.00 87,276.00
509-02 contractor retained reclaimed asphaltic pavement - 682      CUYD 0.10 - 68.20 0.10 - 68.20 0.00 0.00 5.00 - 3,410.00
701-10-I reinforced concrete pipe (extension) (24") 8      LNFT 200.00 1,600.00 200.00 1,600.00 250.00 2,000.00 250.00 2,000.00
701-15 concrete collar 2      EACH 1,500.00 3,000.00 600.00 1,200.00 1,200.00 2,400.00 1,600.00 3,200.00
704-01-A guard rail (single thrie beam) (3'-1 1/2" post spacing) 100.0    LNFT 34.00 3,400.00 40.00 4,000.00 55.00 5,500.00 36.00 3,600.00
704-01-B guard rail (single thrie beam) (6'-3" post spacing) 156.0    LNFT 52.00 8,112.00 50.00 7,800.00 30.00 4,680.00 54.00 8,424.00
704-03 blocked out guard rail 100.0    LNFT 20.00 2,000.00 20.00 2,000.00 25.00 2,500.00 22.00 2,200.00
704-11-A guard rail end treatment (flared) 4      EACH 2,100.00 8,400.00 2,000.00 8,000.00 2,600.00 10,400.00 2,300.00 9,200.00
706-03-A incidental concrete paving (4" thick) 130.3    SQYD 50.00 6,515.00 70.00 9,121.00 100.00 13,030.00 60.00 7,818.00
707-01 concrete curb 242.0    LNFT 15.00 3,630.00 30.00 7,260.00 40.00 9,680.00 17.00 4,114.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 55,000.00 55,000.00 35,000.00 35,000.00 30,000.00 30,000.00
713-03-C temporary pavement markings (8" width) 415      LNFT 0.45 186.75 0.20 83.00 1.00 415.00 0.40 166.00
713-03-D temporary pavement markings (12" width) 364      LNFT 0.90 327.60 0.40 145.60 1.50 546.00 1.00 364.00
713-03-E temporary pavement markings (24" width) 577      LNFT 1.36 784.72 0.60 346.20 2.00 1,154.00 1.40 807.80
713-04-A temporary pavement markings (broken line) (4" width)
(4' length)
8.670  MILE 140.21 1,215.62 500.00 4,335.00 350.00 3,034.50 170.00 1,473.90
713-04-B temporary pavement markings (broken line) (4" width)
(10' length)
1.573  MILE 412.52 648.89 100.00 157.30 420.00 660.66 370.00 582.01
713-05-A temporary pavement markings (solid line) (4" width) 10.427  MILE 500.00 5,213.50 100.00 1,042.70 850.00 8,862.95 740.00 7,715.98
713-06-A temporary pavement legends and symbols (arrow) 9      EACH 60.00 540.00 20.00 180.00 65.00 585.00 60.00 540.00
713-06-C temporary pavement legends and symbols (only) 6      EACH 60.00 360.00 20.00 120.00 65.00 390.00 60.00 360.00
713-06-D temporary pavement legends and symbols (rr crossing) 2      EACH 200.00 400.00 80.00 160.00 250.00 500.00 200.00 400.00
724-01-B pavement patching (12" minimum thickness) 1,000      SQYD 85.00 85,000.00 100.00 100,000.00 80.00 80,000.00 100.00 100,000.00
724-02 pavement widening 2,008.0    SQYD 64.00 128,512.00 60.00 120,480.00 60.00 120,480.00 67.00 134,536.00
726-01 bedding material 24.6    CUYD 70.00 1,722.00 80.00 1,968.00 80.00 1,968.00 80.00 1,968.00
727-01 mobilization lump      LUMP 51,000.00 51,000.00 50,000.00 50,000.00 60,000.00 60,000.00 130,000.00 130,000.00
729-16-C object marker assembly (type 3) 10      EACH 75.00 750.00 80.00 800.00 80.00 800.00 90.00 900.00
731-02 reflectorized raised pavement markers 1,210      EACH 5.00 6,050.00 6.00 7,260.00 6.00 7,260.00 6.00 7,260.00
732-01-C plastic pavement striping (8" width) 715      LNFT 1.00 715.00 1.00 715.00 1.10 786.50 1.30 929.50
732-01-D plastic pavement striping (12" width) 364      LNFT 3.30 1,201.20 3.00 1,092.00 3.50 1,274.00 2.00 728.00
732-01-E plastic pavement striping (24" width) 600      LNFT 3.30 1,980.00 3.00 1,800.00 4.00 2,400.00 4.00 2,400.00
732-02-A plastic pavement striping (solid line) (4" width) 10.427  MILE 2,400.00 25,024.80 2,500.00 26,067.50 2,500.00 26,067.50 2,400.00 25,024.80
732-03-A plastic pavement striping (broken line) (4" width) 1.800  MILE 750.00 1,350.00 800.00 1,440.00 800.00 1,440.00 700.00 1,260.00
732-04-A plastic pavement legends & symbols (arrow) 9      EACH 150.00 1,350.00 150.00 1,350.00 160.00 1,440.00 150.00 1,350.00
732-04-C plastic pavement legends & symbols (only) 6      EACH 160.00 960.00 150.00 900.00 200.00 1,200.00 160.00 960.00
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 475.00 950.00 200.00 400.00 500.00 1,000.00 500.00 1,000.00
735-01 mailboxes 60      EACH 15.00 900.00 5.00 300.00 6.00 360.00 1.00 60.00
735-02 mailbox supports (single) 60      EACH 150.00 9,000.00 130.00 7,800.00 125.00 7,500.00 130.00 7,800.00
739-01 hydro-seeding 4.12   ACRE 900.00 3,708.00 1,000.00 4,120.00 1,000.00 4,120.00 1,000.00 4,120.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 45,000.00 45,000.00 15,000.00 15,000.00 26,000.00 26,000.00
744-01 traffic control management lump      LUMP 8,000.00 8,000.00 45,000.00 45,000.00 35,000.00 35,000.00 40,000.00 40,000.00
805-01-B class a concrete (box culvert headwalls) 18.16   CUYD 1,400.00 25,424.00 500.00 9,080.00 1,000.00 18,160.00 1,500.00 27,240.00
805-12-A reinforced concrete box culverts (4' x 3') 40.0    LNFT 386.00 15,440.00 330.00 13,200.00 600.00 24,000.00 500.00 20,000.00
805-12-Y reinforced concrete box culverts (4' x 2') 54.0    LNFT 375.00 20,250.00 330.00 17,820.00 500.00 27,000.00 400.00 21,600.00
806-01 deformed reinforcing steel 1,368      LB 2.14 2,927.52 1.00 1,368.00 3.00 4,104.00 2.20 3,009.60
S-001 u-channel post installation 91      each 55.00 5,005.00 60.00 5,460.00 75.00 6,825.00 70.00 6,370.00
S-002 relocating ditches 600      LNFT 9.00 5,400.00 10.00 6,000.00 8.00 4,800.00 9.00 5,400.00
S-003 saw cutting of asphaltic concrete and trenching
roadway (12" depth)
278      LNFT 6.50 1,807.00 10.00 2,780.00 15.00 4,170.00 15.00 4,170.00
                       
 CONTRACTOR TOTAL       1,356,775.20   1,428,843.70   1,478,841.01   1,518,782.59