| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RCS CONTRACTORS, INC. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - GRADY CRAWFORD CONST. CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta.1+165.10;5.96 m x 21.8 m timber
bridge) |
1   |
ea |
4,900.00 |
4,900.00 |
20,000.00 |
20,000.00 |
10,500.00 |
10,500.00 |
|
|
| 202-02-A-02 |
removal of bridge(sta.1+161.54;4.94 m x 16.99 m timber
bridge) |
1   |
ea |
3,165.00 |
3,165.00 |
15,000.00 |
15,000.00 |
10,500.00 |
10,500.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
50,214.00 |
50,214.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
15   |
ea |
15.00 |
225.00 |
10.00 |
150.00 |
20.00 |
300.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
ea |
200.00 |
1,600.00 |
500.00 |
4,000.00 |
200.00 |
1,600.00 |
|
|
| 204-06 |
temporary silt fencing
|
160   |
ln m |
10.00 |
1,600.00 |
10.00 |
1,600.00 |
11.00 |
1,760.00 |
|
|
| 302-01 |
class ii base course
|
78.9 |
cu m |
111.00 |
8,757.90 |
130.00 |
10,257.00 |
140.00 |
11,046.00 |
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
27.8 |
cu m |
58.50 |
1,626.30 |
100.00 |
2,780.00 |
140.00 |
3,892.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
47.5 |
Mg |
200.00 |
9,500.00 |
300.00 |
14,250.00 |
275.00 |
13,062.50 |
|
|
| 705-01 |
barbed wire fence
|
6   |
ln m |
50.00 |
300.00 |
100.00 |
600.00 |
50.00 |
300.00 |
|
|
| 712-02 |
sacked concrete revetment
|
127   |
sq m |
66.00 |
8,382.00 |
100.00 |
12,700.00 |
85.00 |
10,795.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.2 |
hctr |
2,000.00 |
400.00 |
5,000.00 |
1,000.00 |
3,630.00 |
726.00 |
|
|
| 717-01 |
seeding
|
7   |
kg |
35.00 |
245.00 |
50.00 |
350.00 |
66.55 |
465.85 |
|
|
| 718-01 |
fertilizer
|
167   |
kg |
1.00 |
167.00 |
5.00 |
835.00 |
4.00 |
668.00 |
|
|
| 726-01 |
bedding material
|
285.0 |
cu m |
10.00 |
2,850.00 |
75.00 |
21,375.00 |
60.00 |
17,100.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
43,000.00 |
43,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
ea |
100.00 |
800.00 |
100.00 |
800.00 |
75.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
4,500.00 |
4,500.00 |
10,000.00 |
10,000.00 |
3,000.00 |
3,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
89.80 |
cu m |
1,050.00 |
94,290.00 |
1,500.00 |
134,700.00 |
1,350.00 |
121,230.00 |
|
|
| 805-12-P-01 |
reinforced concrete box culverts (2100 mm x 2100 mm)
(precast only,astm c1433) |
50.40 |
ln m |
1,936.50 |
97,599.60 |
1,200.00 |
60,480.00 |
2,671.51 |
134,644.10 |
|
|
| 805-12-V-01 |
reinforced concrete box culverts (2700 mm x 2700 mm)
(precast only, astm c1433) |
40.40 |
ln m |
2,644.25 |
106,827.70 |
1,500.00 |
60,600.00 |
3,557.10 |
143,706.84 |
|
|
| 806-01 |
deformed reinforcing steel
|
7,272   |
kg |
2.00 |
14,544.00 |
3.00 |
21,816.00 |
2.20 |
15,998.40 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
490,493.50 |
|
503,293.00 |
|
621,894.69 |
|
|
|