DBE GOAL FED
Lead Project: 713-63-0100
Parish: W FELICIANA
Routes:
Description: DRAINAGE STRUCTURES ON OLD TUNICA ROAD
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, and related work.
Estimated Construction Cost: $441,696.50
 
RankLicenseBidderConstruction Bid
1 25088 RCS CONTRACTORS, INC. $490,493.50
2 00046 BARBER BROS. CONTRACTING CO., L.L.C $503,293.00
3 07764 GRADY CRAWFORD CONST. CO., INC. $621,894.69
 
Item Number Item Description Quantity Unit of Measure - 1 -
RCS CONTRACTORS, INC.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
GRADY CRAWFORD CONST. CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 25,000.00 25,000.00 20,000.00 20,000.00 15,000.00 15,000.00    
202-02-A-01 removal of bridge(sta.1+165.10;5.96 m x 21.8 m timber
bridge)
1      ea 4,900.00 4,900.00 20,000.00 20,000.00 10,500.00 10,500.00    
202-02-A-02 removal of bridge(sta.1+161.54;4.94 m x 16.99 m timber
bridge)
1      ea 3,165.00 3,165.00 15,000.00 15,000.00 10,500.00 10,500.00    
203-06 excavation & embankment lump      lump 50,214.00 50,214.00 50,000.00 50,000.00 75,000.00 75,000.00    
204-02 temporary hay or straw bales 15      ea 15.00 225.00 10.00 150.00 20.00 300.00    
204-05-A temporary sediment check dams (hay) 8      ea 200.00 1,600.00 500.00 4,000.00 200.00 1,600.00    
204-06 temporary silt fencing 160      ln m 10.00 1,600.00 10.00 1,600.00 11.00 1,760.00    
302-01 class ii base course 78.9    cu m 111.00 8,757.90 130.00 10,257.00 140.00 11,046.00    
403-01 aggregate roadway surfacing (vehicular measurement) 27.8    cu m 58.50 1,626.30 100.00 2,780.00 140.00 3,892.00    
502-01 superpave asphaltic concrete 47.5    Mg 200.00 9,500.00 300.00 14,250.00 275.00 13,062.50    
705-01 barbed wire fence 6      ln m 50.00 300.00 100.00 600.00 50.00 300.00    
712-02 sacked concrete revetment 127      sq m 66.00 8,382.00 100.00 12,700.00 85.00 10,795.00    
713-01 temporary signs & barricades lump      lump 10,000.00 10,000.00 20,000.00 20,000.00 10,000.00 10,000.00    
716-01-A mulch (vegetative) 0.2    hctr 2,000.00 400.00 5,000.00 1,000.00 3,630.00 726.00    
717-01 seeding 7      kg 35.00 245.00 50.00 350.00 66.55 465.85    
718-01 fertilizer 167      kg 1.00 167.00 5.00 835.00 4.00 668.00    
726-01 bedding material 285.0    cu m 10.00 2,850.00 75.00 21,375.00 60.00 17,100.00    
727-01 mobilization lump      lump 43,000.00 43,000.00 20,000.00 20,000.00 20,000.00 20,000.00    
729-16-B object marker assembly (type 2) 8      ea 100.00 800.00 100.00 800.00 75.00 600.00    
740-01 construction layout lump      lump 4,500.00 4,500.00 10,000.00 10,000.00 3,000.00 3,000.00    
805-01-B class a concrete (box culvert headwalls) 89.80   cu m 1,050.00 94,290.00 1,500.00 134,700.00 1,350.00 121,230.00    
805-12-P-01 reinforced concrete box culverts (2100 mm x 2100 mm)
(precast only,astm c1433)
50.40   ln m 1,936.50 97,599.60 1,200.00 60,480.00 2,671.51 134,644.10    
805-12-V-01 reinforced concrete box culverts (2700 mm x 2700 mm)
(precast only, astm c1433)
40.40   ln m 2,644.25 106,827.70 1,500.00 60,600.00 3,557.10 143,706.84    
806-01 deformed reinforcing steel 7,272      kg 2.00 14,544.00 3.00 21,816.00 2.20 15,998.40    
                       
 CONTRACTOR TOTAL       490,493.50   503,293.00   621,894.69    