Letting of 10/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-14-0105
Parish: CLAIBORNE
Routes:
Description: WATTS ROAD OVER SUGAR CREEK
Type Const: clearing and grubbing, grading, drainage structures, superpave asphaltic concrete
pavement, concrete slab spans bridge, and related work.
Estimated Construction Cost: $200,946.45
 
RankLicenseBidderConstruction Bid
1 14788 LOUISIANA BRIDGE, INC. $195,484.89
2 18546 C W & W CONTRACTORS, INC. $235,745.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
LOUISIANA BRIDGE, INC.
- 2 -
C W & W CONTRACTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 5,000.00 5,000.00 7,500.00 7,500.00        
202-02-A-01 removal of bridge (sta. 1+155.600; 5.12 m wide x
6.12 m long timber bridge)
1      ea 1,200.00 1,200.00 5,000.00 5,000.00        
203-06 excavation & embankment lump      lump 9,000.00 9,000.00 15,000.00 15,000.00        
204-02 temporary hay or straw bales 20      ea 8.00 160.00 10.00 200.00        
204-03 temporary slope drains 20      ln m 5.00 100.00 20.00 400.00        
204-05-A temporary sediment check dams (hay) 4      ea 85.00 340.00 125.00 500.00        
204-06 temporary silt fencing 60      ln m 5.00 300.00 5.00 300.00        
302-01 class ii base course 115.8    cu m 95.00 11,001.00 100.00 11,580.00        
502-01 superpave asphaltic concrete 106.8    Mg 185.00 19,758.00 145.00 15,486.00        
701-05-I-01 side drain pipe (600 mm) (erosion) 40.0    ln m 188.00 7,520.00 150.00 6,000.00        
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 204.30 6,227.06 225.00 6,858.00        
704-09 guard rail anchor sections (turndown) 30.48   ln m 89.75 2,735.58 100.00 3,048.00        
705-01 barbed wire fence 75      ln m 26.25 1,968.75 45.00 3,375.00        
707-04 asphaltic curb 12.0    ln m 56.75 681.00 100.00 1,200.00        
712-04 flexible revetment 164      sq m 65.00 10,660.00 90.00 14,760.00        
713-01 temporary signs & barricades lump      lump 4,000.00 4,000.00 6,500.00 6,500.00        
716-01-A mulch (vegetative) 0.4    hctr 1,000.00 400.00 1,500.00 600.00        
717-01 seeding 14      kg 18.00 252.00 25.00 350.00        
718-01 fertilizer 454      kg 2.00 908.00 2.00 908.00        
727-01 mobilization lump      lump 22,312.50 22,312.50 20,000.00 20,000.00        
729-16-C object marker assembly (type 3) 8      ea 85.25 682.00 95.00 760.00        
740-01 construction layout lump      lump 2,270.00 2,270.00 5,000.00 5,000.00        
804-01-B precast concrete piles (350 mm) 144.0    ln m 194.50 28,008.00 305.00 43,920.00        
804-12 loading permanent piles 1      ea 1.00 1.00 500.00 500.00        
805-10-A bridge superstructure & substructure (90 degree
crossing; 7.3 m roadway, curved) (cast-in-place
only)
3      span 20,000.00 60,000.00 22,000.00 66,000.00        
    only)                    
 CONTRACTOR TOTAL       195,484.89   235,745.00        