| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RICHARD PRICE CONTRACTING CO, LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
65,000.00 |
65,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
65,000.00 |
65,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
835   |
SQYD |
15.40 |
12,859.00 |
60.00 |
50,100.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
1,660.0 |
LNFT |
15.00 |
24,900.00 |
16.00 |
26,560.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
17,212.4 |
SQYD |
5.50 |
94,668.20 |
12.00 |
206,548.80 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
514   |
LNFT |
5.00 |
2,570.00 |
6.00 |
3,084.00 |
|
|
|
|
| 202-02-I |
removal of shoulder underdrain system
|
2,197   |
LF |
20.00 |
43,940.00 |
6.00 |
13,182.00 |
|
|
|
|
| 202-02-J-01 |
removal of headwalls (sta. 87+00, lt; 4' x 4' rcb)
|
1   |
EACH |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-J-02 |
removal of headwalls (sta. 87+00, rt; 4' x 4' rcb)
|
1   |
EACH |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-J-03 |
removal of headwalls (sta. 95+00, lt; 18" rcp)
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-J-04 |
removal of headwalls (sta. 99+00, lt; 4' x 4' rcb)
|
1   |
EACH |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-J-05 |
removal of headwalls (sta. 99+00, rt; 4' x 4' rcb)
|
1   |
EACH |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-J-06 |
removal of headwalls (sta. 119+00, lt; 18" rcp)
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-J-07 |
removal of headwalls (sta. 123+00, lt; 36" eq. rcpa)
|
1   |
EACH |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-K |
removal of existing traffic signal pole
|
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
160,000.00 |
160,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
179   |
CUYD |
18.00 |
3,222.00 |
30.00 |
5,370.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
7   |
EACH |
200.00 |
1,400.00 |
500.00 |
3,500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
16,415   |
LNFT |
1.75 |
28,726.25 |
1.50 |
24,622.50 |
|
|
|
|
| 302-02-B |
class ii base course (8 1/2" thick)
|
29,246.8 |
SQYD |
22.00 |
643,429.60 |
30.00 |
877,404.00 |
|
|
|
|
| 304-01 |
lime
|
104.86 |
TON |
149.00 |
15,624.14 |
160.00 |
16,777.60 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
4,755   |
SQYD |
3.00 |
14,265.00 |
4.00 |
19,020.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,141.9 |
TON |
147.00 |
314,859.30 |
95.00 |
203,480.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
600   |
SQYD |
13.50 |
8,100.00 |
10.00 |
6,000.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 25   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
19,022.1 |
SQYD |
76.00 |
1,445,679.60 |
80.00 |
1,521,768.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
25   |
EACH |
150.00 |
3,750.00 |
200.00 |
5,000.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
2,800   |
LNFT |
3.50 |
9,800.00 |
2.00 |
5,600.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
2,700   |
LNFT |
3.50 |
9,450.00 |
3.00 |
8,100.00 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
2,800   |
LNFT |
3.30 |
9,240.00 |
5.00 |
14,000.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
520   |
LNFT |
37.00 |
19,240.00 |
90.00 |
46,800.00 |
|
|
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
538   |
LNFT |
146.00 |
78,548.00 |
180.00 |
96,840.00 |
|
|
|
|
| 701-04-I |
storm drain pipe arch (54" equiv. rcpa)
|
60   |
LNFT |
178.00 |
10,680.00 |
300.00 |
18,000.00 |
|
|
|
|
| 701-10-F |
reinforced concrete pipe (extension)(15")
|
4   |
LNFT |
143.00 |
572.00 |
600.00 |
2,400.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
12   |
LNFT |
150.00 |
1,800.00 |
350.00 |
4,200.00 |
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
12   |
LNFT |
216.00 |
2,592.00 |
500.00 |
6,000.00 |
|
|
|
|
| 701-15 |
concrete collar
|
5   |
EACH |
1,200.00 |
6,000.00 |
1,000.00 |
5,000.00 |
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
1   |
EACH |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,200.00 |
3,200.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
6   |
EACH |
4,546.00 |
27,276.00 |
5,000.00 |
30,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
2,800.00 |
2,800.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 703-01 |
shoulder underdrain systems
|
3,989   |
LNFT |
8.00 |
31,912.00 |
10.00 |
39,890.00 |
|
|
|
|
| 703-02 |
shoulder outlet underdrains
|
11   |
EACH |
500.00 |
5,500.00 |
500.00 |
5,500.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
52.00 |
5,200.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
175.0 |
LNFT |
61.00 |
10,675.00 |
62.00 |
10,850.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
625.0 |
LNFT |
23.35 |
14,593.75 |
24.00 |
15,000.00 |
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
12.5 |
LNFT |
71.50 |
893.75 |
85.00 |
1,062.50 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
18.8 |
LNFT |
82.50 |
1,551.00 |
110.00 |
2,068.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
60.50 |
3,025.00 |
70.00 |
3,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
3   |
EACH |
2,700.00 |
8,100.00 |
4,000.00 |
12,000.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
87.5 |
SQYD |
37.00 |
3,237.50 |
60.00 |
5,250.00 |
|
|
|
|
| 707-01 |
concrete curb
|
20.0 |
LNFT |
27.00 |
540.00 |
120.00 |
2,400.00 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
493   |
SQYD |
82.50 |
40,672.50 |
75.00 |
36,975.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
1.810 |
MILE |
2,000.00 |
3,620.00 |
600.00 |
1,086.00 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
5.100 |
MILE |
16,000.00 |
81,600.00 |
18,000.00 |
91,800.00 |
|
|
|
|
| 713-05-C-01 |
temporary pavement markings (broken line)(8" width)
(type i removable) |
0.015 |
MILE |
4,000.00 |
60.00 |
2,800.00 |
42.00 |
|
|
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
150   |
EACH |
1,100.00 |
165,000.00 |
1,800.00 |
270,000.00 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
250   |
EACH |
295.00 |
73,750.00 |
1,000.00 |
250,000.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
367,500.00 |
367,500.00 |
550,000.00 |
550,000.00 |
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
535.0 |
SQFT |
30.25 |
16,183.75 |
40.00 |
21,400.00 |
|
|
|
|
| 729-09 |
mounting (overhead truss)(ground mounted)
|
1   |
EACH |
83,859.00 |
83,859.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-11 |
mounting (overhead cantilever)(ground mounted)
|
1   |
EACH |
32,885.00 |
32,885.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
9   |
EACH |
77.00 |
693.00 |
75.00 |
675.00 |
|
|
|
|
| 729-20 |
footings for overhead mountings (overhead cantilever)
|
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 729-20-A |
footings for overhead mountings (overhead truss)
|
2   |
EACH |
20,000.00 |
40,000.00 |
30,000.00 |
60,000.00 |
|
|
|
|
| 730-15 |
relocate light poles (40' mounting height)(single arm
ground mount) |
1   |
EACH |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
11   |
EACH |
16.00 |
176.00 |
16.00 |
176.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,038   |
EACH |
6.60 |
6,850.80 |
6.75 |
7,006.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,090   |
LNFT |
3.86 |
4,207.40 |
4.00 |
4,360.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.744 |
MILE |
2,380.00 |
13,670.72 |
2,500.00 |
14,360.00 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
1.717 |
MILE |
4,760.00 |
8,172.92 |
5,000.00 |
8,585.00 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
3.360 |
MILE |
4,356.00 |
14,636.16 |
4,500.00 |
15,120.00 |
|
|
|
|
| 732-03-C-01 |
plastic pvmt striping (broken line)(8"width)preformed
marking tape (type v) |
0.357 |
MILE |
8,712.00 |
3,110.18 |
9,000.00 |
3,213.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
35   |
EACH |
171.00 |
5,985.00 |
175.00 |
6,125.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
12   |
EACH |
182.00 |
2,184.00 |
200.00 |
2,400.00 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (exit)
|
3   |
EACH |
215.00 |
645.00 |
220.00 |
660.00 |
|
|
|
|
| 732-04-G |
plastic pavement legends & symbols (wb i-12)
|
2   |
EACH |
235.00 |
470.00 |
250.00 |
500.00 |
|
|
|
|
| 732-04-H |
plastic pavement legends & symbols (ok)
|
2   |
EACH |
200.00 |
400.00 |
250.00 |
500.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
3.500 |
MILE |
6,270.00 |
21,945.00 |
6,500.00 |
22,750.00 |
|
|
|
|
| 736-10 |
underground junction box
|
12   |
EACH |
550.00 |
6,600.00 |
600.00 |
7,200.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
4.52 |
ACRE |
935.00 |
4,226.20 |
1,500.00 |
6,780.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
52,000.00 |
52,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
28,000.00 |
28,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
22.96 |
CUYD |
1,100.00 |
25,256.00 |
1,200.00 |
27,552.00 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
60.0 |
LNFT |
775.00 |
46,500.00 |
350.00 |
21,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,634   |
LB |
1.20 |
1,960.80 |
2.50 |
4,085.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
4   |
EACH |
10,000.00 |
40,000.00 |
25,000.00 |
100,000.00 |
|
|
|
|
| S-003 |
rumble strips (ground-in)
|
1.3 |
MILE |
1,100.00 |
1,430.00 |
1,200.00 |
1,560.00 |
|
|
|
|
| S-004 |
saw cutting of portland cement concrete pavement
and/or asphaltic concrete pavement (full-depth) |
1,558.0 |
LNFT |
17.00 |
26,486.00 |
8.00 |
12,464.00 |
|
|
|
|
| S-005 |
pier protection system
|
2   |
EACH |
24,000.00 |
48,000.00 |
100,000.00 |
200,000.00 |
|
|
|
|
| S-006 |
remove and relocate sign posts and footings
|
8   |
EACH |
20,350.00 |
162,800.00 |
3,000.00 |
24,000.00 |
|
|
|
|
| S-007 |
video detection system
|
1   |
EACH |
50,155.00 |
50,155.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
4,838,209.52 |
|
5,887,452.40 |
|
|
|
|
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
1,250,000.00 |
|
1,000,000.00 |
|
|
|
|
| | LIFE CYCLE COST |
|
|
|
|
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
6,088,209.52 |
|
6,887,452.40 |
|
|
|
|
|