| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUTCON, INC. |
GRAY TWO CONSTRUCTION, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
27   |
SQYD |
25.00 |
675.00 |
4,725.00 |
127,575.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
16.0 |
LNFT |
25.00 |
400.00 |
1,200.00 |
19,200.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
8,000.00 |
8,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp)
|
60   |
LNFT |
50.00 |
3,000.00 |
2,400.00 |
144,000.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" bccsp)
|
12   |
LNFT |
80.00 |
960.00 |
540.00 |
6,480.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" bccsp)
|
71   |
LNFT |
90.00 |
6,390.00 |
3,905.00 |
277,255.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" bccsp)
|
100   |
LNFT |
100.00 |
10,000.00 |
8,000.00 |
800,000.00 |
|
|
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. bccspa)
|
25   |
LNFT |
130.00 |
3,250.00 |
2,500.00 |
62,500.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (8" pvc)
|
40   |
LNFT |
20.00 |
800.00 |
640.00 |
25,600.00 |
|
|
|
|
| 701-07-D |
yard drain pipe (10" pvc)
|
66   |
LNFT |
26.00 |
1,716.00 |
1,452.00 |
95,832.00 |
|
|
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
12   |
LNFT |
110.00 |
1,320.00 |
288.00 |
3,456.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
2,000.00 |
12,000.00 |
6,000.00 |
36,000.00 |
|
|
|
|
| 705-06-C |
chain link fence (6-foot height)
|
293   |
LNFT |
20.00 |
5,860.00 |
2,637.00 |
772,641.00 |
|
|
|
|
| 705-09 |
rebuilt fence
|
406   |
LNFT |
24.00 |
9,744.00 |
2,842.00 |
1,153,852.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
2,499.0 |
SQYD |
40.00 |
99,960.00 |
100,000.00 |
249,900,000.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
302.0 |
SQYD |
40.00 |
12,080.00 |
16,610.00 |
5,016,220.00 |
|
|
|
|
| 707-01 |
concrete curb (6" barrier)
|
25.0 |
LNFT |
50.00 |
1,250.00 |
450.00 |
11,250.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
35.00 |
35.00 |
|
|
|
|
| 717-01 |
seeding
|
40   |
LB |
10.00 |
400.00 |
1,000.00 |
40,000.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,250   |
LB |
0.50 |
625.00 |
6,250.00 |
7,812,500.00 |
|
|
|
|
| 719-04 |
landscaping
|
lump |
LUMP |
100.00 |
100.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
25.0 |
CUYD |
100.00 |
2,500.00 |
263.00 |
6,575.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
16,500.00 |
16,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
43.3 |
SQFT |
30.00 |
1,299.00 |
200.00 |
8,660.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
100.00 |
800.00 |
173.00 |
1,384.00 |
|
|
|
|
| 729-21 |
u-channel post
|
5   |
EACH |
50.00 |
250.00 |
50.00 |
250.00 |
|
|
|
|
| 737-03-D |
painted traffic striping (solid line)(12" width)
|
485   |
LNFT |
4.40 |
2,134.00 |
2,910.00 |
1,411,350.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
500.00 |
500.00 |
75.00 |
75.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-001 |
arboricultural work
|
lump |
lump |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| S-002 |
relocate existing ditch
|
330   |
LNFT |
30.00 |
9,900.00 |
3,300.00 |
1,089,000.00 |
|
|
|
|
| S-003 |
stone (adjusted vehicular measurement)
|
60   |
CUYD |
100.00 |
6,000.00 |
1,200.00 |
72,000.00 |
|
|
|
|
| S-004 |
sawcutting (per 1" of depth)
|
348.2 |
LNFT |
4.00 |
1,392.80 |
500.00 |
174,100.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
244,805.80 |
|
IRREGULAR |
|
|
|
|
|