| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks and drives
|
59   |
SQYD |
13.50 |
796.50 |
35.00 |
2,065.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
480   |
LNFT |
3.75 |
1,800.00 |
11.00 |
5,280.00 |
|
|
|
|
| 202-02-I |
removal of asphalt drives
|
3   |
EACH |
800.00 |
2,400.00 |
700.00 |
2,100.00 |
|
|
|
|
| 203-01 |
general excavation
|
50   |
CUYD |
20.00 |
1,000.00 |
30.00 |
1,500.00 |
|
|
|
|
| 203-04 |
embankment
|
50   |
CUYD |
20.00 |
1,000.00 |
30.00 |
1,500.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
250   |
CUYD |
28.00 |
7,000.00 |
30.00 |
7,500.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
165.00 |
660.00 |
185.00 |
740.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
595   |
CUYD |
75.00 |
44,625.00 |
75.00 |
44,625.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,210.6 |
TON |
76.00 |
244,005.60 |
100.00 |
321,060.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
566.2 |
TON |
110.00 |
62,282.00 |
140.00 |
79,268.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
11,278   |
SQYD |
2.75 |
31,014.50 |
2.50 |
28,195.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 470   |
CUYD |
0.01 |
- 4.70 |
1.00 |
- 470.00 |
|
|
|
|
| 701-05-K-01 |
side drain pipe (30") (erosion)
|
140   |
LNFT |
110.00 |
15,400.00 |
90.00 |
12,600.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
55.00 |
4,125.00 |
35.00 |
2,625.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
150.0 |
LNFT |
66.00 |
9,900.00 |
55.00 |
8,250.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
37.5 |
LNFT |
22.00 |
825.00 |
22.00 |
825.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
4,180.00 |
16,720.00 |
2,300.00 |
9,200.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
50.0 |
SQYD |
80.00 |
4,000.00 |
98.00 |
4,900.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
50.0 |
LNFT |
100.00 |
5,000.00 |
45.00 |
2,250.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 12" thick)
|
100   |
SQYD |
94.00 |
9,400.00 |
90.00 |
9,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
650   |
LNFT |
0.17 |
110.50 |
1.00 |
650.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
472   |
LNFT |
0.33 |
155.76 |
1.00 |
472.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
280   |
LNFT |
1.05 |
294.00 |
1.10 |
308.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.631 |
MILE |
400.00 |
652.40 |
340.00 |
554.54 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.355 |
MILE |
302.00 |
409.21 |
320.00 |
433.60 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
5.241 |
MILE |
468.00 |
2,452.79 |
490.00 |
2,568.09 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
55.00 |
110.00 |
55.00 |
110.00 |
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
4   |
EACH |
71.50 |
286.00 |
75.00 |
300.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
82.50 |
165.00 |
85.00 |
170.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
110.00 |
440.00 |
115.00 |
460.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
120.00 |
30,000.00 |
140.00 |
35,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
601.7 |
SQYD |
85.00 |
51,144.50 |
76.00 |
45,729.20 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
284   |
EACH |
5.61 |
1,593.24 |
5.50 |
1,562.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
325   |
LNFT |
0.46 |
149.50 |
0.50 |
162.50 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
236   |
LNFT |
0.94 |
221.84 |
1.00 |
236.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
140   |
LNFT |
3.58 |
501.20 |
3.50 |
490.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.621 |
MILE |
2,365.00 |
6,198.67 |
2,500.00 |
6,552.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.678 |
MILE |
816.00 |
553.25 |
875.00 |
593.25 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
193.00 |
193.00 |
200.00 |
200.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
215.00 |
430.00 |
230.00 |
460.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
215.00 |
215.00 |
230.00 |
230.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
468.00 |
936.00 |
490.00 |
980.00 |
|
|
|
|
| 735-01 |
mailboxes
|
13   |
EACH |
11.00 |
143.00 |
3.00 |
39.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
220.00 |
2,200.00 |
200.00 |
2,000.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
550.00 |
550.00 |
360.00 |
360.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,500.00 |
9,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
13,500.00 |
13,500.00 |
52,000.00 |
52,000.00 |
|
|
|
|
| S-001 |
autoscope solo pro
|
2   |
EACH |
8,030.00 |
16,060.00 |
7,000.00 |
14,000.00 |
|
|
|
|
| S-002 |
4 channel communication interface panel
|
1   |
EACH |
2,200.00 |
2,200.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| S-003 |
autoscope cable
|
600   |
LNFT |
3.85 |
2,310.00 |
2.50 |
1,500.00 |
|
|
|
|
| S-004 |
ts ii mini hub
|
1   |
EACH |
1,375.00 |
1,375.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| S-005 |
full depth sawcutting of existing portland cement
concrete drives |
792   |
INFT |
2.50 |
1,980.00 |
5.50 |
4,356.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
648,978.76 |
|
823,789.68 |
|
|
|
|
|