| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
18,587   |
CUYD |
12.00 |
223,044.00 |
14.00 |
260,218.00 |
20.00 |
371,740.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,944   |
CUYD |
15.00 |
29,160.00 |
33.00 |
64,152.00 |
61.00 |
118,584.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
6,835.5 |
TON |
79.00 |
540,004.50 |
95.00 |
649,372.50 |
90.00 |
615,195.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
864.0 |
TON |
79.00 |
68,256.00 |
145.00 |
125,280.00 |
125.00 |
108,000.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
62,122   |
SQYD |
1.10 |
68,334.20 |
1.00 |
62,122.00 |
1.75 |
108,713.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,294   |
CUYD |
0.01 |
- 12.94 |
0.50 |
- 647.00 |
0.10 |
- 129.40 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
56   |
LNFT |
180.00 |
10,080.00 |
180.00 |
10,080.00 |
180.00 |
10,080.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
64   |
LNFT |
200.00 |
12,800.00 |
215.00 |
13,760.00 |
210.00 |
13,440.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
88   |
LNFT |
235.00 |
20,680.00 |
255.00 |
22,440.00 |
230.00 |
20,240.00 |
|
|
| 701-15 |
concrete collar
|
14   |
EACH |
900.00 |
12,600.00 |
950.00 |
13,300.00 |
1,000.00 |
14,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
27,000.00 |
27,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.777 |
MILE |
165.00 |
1,448.21 |
350.00 |
3,071.95 |
200.00 |
1,755.40 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.715 |
MILE |
355.00 |
3,093.83 |
1.00 |
8.72 |
360.00 |
3,137.40 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
19.944 |
MILE |
1.00 |
19.94 |
1.00 |
19.94 |
720.00 |
14,359.68 |
|
|
| 716-01-A |
mulch (vegetative)
|
14.89 |
ACRE |
700.00 |
10,423.00 |
745.00 |
11,093.05 |
900.00 |
13,401.00 |
|
|
| 717-01 |
seeding
|
596   |
LB |
7.00 |
4,172.00 |
8.90 |
5,304.40 |
11.00 |
6,556.00 |
|
|
| 718-01 |
fertilizer
|
14,890   |
LB |
0.50 |
7,445.00 |
0.30 |
4,467.00 |
0.40 |
5,956.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
650   |
SQYD |
105.00 |
68,250.00 |
115.00 |
74,750.00 |
120.00 |
78,000.00 |
|
|
| 726-01 |
bedding material
|
294.4 |
CUYD |
86.00 |
25,318.40 |
90.00 |
26,496.00 |
110.00 |
32,384.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
75,000.00 |
75,000.00 |
152,000.00 |
152,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
698   |
EACH |
5.00 |
3,490.00 |
5.00 |
3,490.00 |
6.00 |
4,188.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.018 |
MILE |
2,260.00 |
29,420.68 |
2,400.00 |
31,243.20 |
2,800.00 |
36,450.40 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.705 |
MILE |
600.00 |
2,823.00 |
900.00 |
4,234.50 |
1,000.00 |
4,705.00 |
|
|
| 735-01 |
mailboxes
|
24   |
EACH |
35.00 |
840.00 |
20.00 |
480.00 |
25.00 |
600.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
175.00 |
2,625.00 |
170.00 |
2,550.00 |
250.00 |
3,750.00 |
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
275.00 |
825.00 |
400.00 |
1,200.00 |
500.00 |
1,500.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
375.00 |
375.00 |
500.00 |
500.00 |
1,300.00 |
1,300.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
21,000.00 |
21,000.00 |
80,000.00 |
80,000.00 |
10,000.00 |
10,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
100.30 |
CUYD |
950.00 |
95,285.00 |
1,500.00 |
150,450.00 |
1,800.00 |
180,540.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
20.0 |
LNFT |
400.00 |
8,000.00 |
500.00 |
10,000.00 |
560.00 |
11,200.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
85.0 |
LNFT |
450.00 |
38,250.00 |
800.00 |
68,000.00 |
860.00 |
73,100.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
60.0 |
LNFT |
825.00 |
49,500.00 |
850.00 |
51,000.00 |
960.00 |
57,600.00 |
|
|
| 805-12-Y |
reinforced concrete box culverts (3'x 3')
|
20.0 |
LNFT |
350.00 |
7,000.00 |
500.00 |
10,000.00 |
520.00 |
10,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
7,105   |
LB |
2.25 |
15,986.25 |
2.80 |
19,894.00 |
4.00 |
28,420.00 |
|
|
| S-001 |
removal of existing island
|
lump |
LUMP |
12,000.00 |
12,000.00 |
3,000.00 |
3,000.00 |
25,000.00 |
25,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,495,536.07 |
|
1,901,330.26 |
|
2,183,165.98 |
|
|
|