| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,500.00 |
2,500.00 |
9,000.00 |
9,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
450   |
LNFT |
12.00 |
5,400.00 |
11.00 |
4,950.00 |
7.00 |
3,150.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
12,150   |
CUYD |
14.50 |
176,175.00 |
13.00 |
157,950.00 |
16.00 |
194,400.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
7,570.5 |
TON |
95.00 |
719,197.50 |
99.00 |
749,479.50 |
92.00 |
696,486.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
28.0 |
TON |
262.50 |
7,350.00 |
190.00 |
5,320.00 |
490.00 |
13,720.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
63,699   |
SQYD |
1.75 |
111,473.25 |
2.20 |
140,137.80 |
2.00 |
127,398.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,654   |
CUYD |
0.01 |
- 26.54 |
0.50 |
- 1,327.00 |
0.10 |
- 265.40 |
|
|
| 701-01-N |
cross drain pipe (42" rcp)
|
90   |
LNFT |
175.00 |
15,750.00 |
215.00 |
19,350.00 |
230.00 |
20,700.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
56.00 |
8,400.00 |
52.00 |
7,800.00 |
61.00 |
9,150.00 |
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
20.00 |
3,000.00 |
18.00 |
2,700.00 |
21.00 |
3,150.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,250.00 |
9,000.00 |
2,100.00 |
8,400.00 |
2,500.00 |
10,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
46,000.00 |
46,000.00 |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.798 |
MILE |
155.00 |
1,983.69 |
330.00 |
4,223.34 |
175.00 |
2,239.65 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.532 |
MILE |
165.00 |
1,407.78 |
1.00 |
8.53 |
360.00 |
3,071.52 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
17.963 |
MILE |
1.00 |
17.96 |
1.00 |
17.96 |
715.00 |
12,843.55 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.64 |
ACRE |
2,100.00 |
1,344.00 |
2,200.00 |
1,408.00 |
2,600.00 |
1,664.00 |
|
|
| 717-01 |
seeding
|
38   |
LB |
12.00 |
456.00 |
11.50 |
437.00 |
13.00 |
494.00 |
|
|
| 718-01 |
fertilizer
|
640   |
LB |
0.75 |
480.00 |
0.60 |
384.00 |
0.80 |
512.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
50   |
SQYD |
115.00 |
5,750.00 |
135.00 |
6,750.00 |
270.00 |
13,500.00 |
|
|
| 724-01-C |
pavement patching (24" minimum thickness)
|
550   |
SQYD |
195.00 |
107,250.00 |
145.00 |
79,750.00 |
300.00 |
165,000.00 |
|
|
| 726-01 |
bedding material
|
45.2 |
CUYD |
75.00 |
3,390.00 |
65.00 |
2,938.00 |
78.00 |
3,525.60 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
160,000.00 |
160,000.00 |
160,000.00 |
160,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
76.00 |
304.00 |
80.00 |
320.00 |
91.00 |
364.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
564   |
EACH |
8.00 |
4,512.00 |
6.00 |
3,384.00 |
6.00 |
3,384.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.981 |
MILE |
3,000.00 |
26,943.00 |
2,800.00 |
25,146.80 |
2,800.00 |
25,146.80 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.266 |
MILE |
1,300.00 |
5,545.80 |
850.00 |
3,626.10 |
1,000.00 |
4,266.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
40,000.00 |
40,000.00 |
65,000.00 |
65,000.00 |
40,000.00 |
40,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
6.00 |
CUYD |
900.00 |
5,400.00 |
1,600.00 |
9,600.00 |
2,000.00 |
12,000.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
20.0 |
LNFT |
500.00 |
10,000.00 |
550.00 |
11,000.00 |
650.00 |
13,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
449   |
LB |
3.00 |
1,347.00 |
3.00 |
1,347.00 |
4.00 |
1,796.00 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
22,524   |
LNFT |
1.50 |
33,786.00 |
1.20 |
27,028.80 |
2.00 |
45,048.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
24,772   |
LNFT |
1.65 |
40,873.80 |
1.20 |
29,726.40 |
2.00 |
49,544.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,495,010.24 |
|
1,585,856.23 |
|
1,700,287.72 |
|
|
|