DBE GOAL FED
Lead Project: 016-01-0042
Parish: OUACHITA
Routes: US 165
Description: SOUTH OF LA 134 - LA 2
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, pavement patching, portland cement concrete pavement, and related work.
Estimated Construction Cost: $1,553,233.20
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $1,195,264.55
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 1,000.00 1,000.00            
202-02-C removal of portland cement concrete pavement 125      SQYD 15.00 1,875.00            
202-02-G removal of surfacing and stabilized base 458.4    SQYD 5.00 2,292.00            
203-06 excavation and embankment lump      LUMP 1,000.00 1,000.00            
203-08 borrow (vehicular measurement) 207      CUYD 15.00 3,105.00            
302-02-A class ii base course (6" thick) 366.6    SQYD 25.00 9,165.00            
302-02-D class ii base course (12" thick) 596.7    SQYD 45.00 26,851.50            
502-01 superpave asphaltic concrete 24.6    TON 250.00 6,150.00            
601-01-I portland cement concrete pavement (9" thick) 570.8    SQYD 90.00 51,372.00            
602-02-A cleaning and resealing existing longitudinal pavement
joints
24,171      LNFT 1.25 30,213.75            
602-02-B cleaning and resealing existing transverse pavement
joints
29,040      LNFT 1.25 36,300.00            
602-05-I-01 full depth patching of jointed concrete pavement (9"
thick) (16.0 sq. yds. and under)
2,065.6    SQYD 125.00 258,200.00            
602-05-I-02 full depth patching of jointed concrete pavement (9"
thick) (16.1 sq. yds. to 48.0 sq. yds.)
2,341.3    SQYD 105.00 245,836.50            
602-05-I-03 full depth patching of jointed concrete pavement (9"
thick) (48.1 sq. yds. and over)
3,586.7    SQYD 95.00 340,736.50            
701-01-O cross drain pipe (48" rcp) 180      LNFT 275.00 49,500.00            
702-03-B catch basins (cb-02) 1      EACH 7,500.00 7,500.00            
710-01 flowable fill 1      CUYD 300.00 300.00            
713-01 temporary signs and barricades lump      LUMP 30,000.00 30,000.00            
716-01-A mulch (vegetative) 0.12   ACRE 1,000.00 120.00            
717-01 seeding 5      LB 20.00 100.00            
718-01 fertilizer 120      LB 1.00 120.00            
724-01-C pavement patching (18" minimum thickness) 115      SQYD 125.00 14,375.00            
726-01 bedding material 110.0    CUYD 100.00 11,000.00            
727-01 mobilization lump      LUMP 35,000.00 35,000.00            
729-16-B object marker assembly (type 2) 2      EACH 100.00 200.00            
731-02 reflectorized raised pavement markers 607      EACH 4.00 2,428.00            
732-01-C plastic pavement striping (8" width) 225      LNFT 5.50 1,237.50            
732-01-E plastic pavement striping (24" width) 26      LNFT 3.00 78.00            
732-02-A plastic pavement striping (solid line) (4" width) 9.156  MILE 1,900.00 17,396.40            
732-03-A plastic pavement striping (broken line) (4" width) 4.578  MILE 800.00 3,662.40            
732-04-A plastic pavement legends and symbols (arrow) 4      EACH 225.00 900.00            
732-04-C plastic pavement legends and symbols (only) 4      EACH 225.00 900.00            
736-09 loop detector 75      LNFT 20.00 1,500.00            
740-01 construction layout lump      LUMP 2,500.00 2,500.00            
744-01 traffic control management lump      LUMP 1,000.00 1,000.00            
S-001 cleaning existing ditches 150      LNFT 9.00 1,350.00            
                       
 CONTRACTOR TOTAL       1,195,264.55            