| DBE GOAL FED |
| Lead Project: 016-01-0042 |
| Parish: OUACHITA |
| Routes: US 165 |
| Description: SOUTH OF LA 134 - LA 2 |
Type Const:
grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, pavement patching, portland cement concrete pavement, and related work. |
| Estimated Construction Cost: $1,553,233.20 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
125   |
SQYD |
15.00 |
1,875.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing and stabilized base
|
458.4 |
SQYD |
5.00 |
2,292.00 |
|
|
|
|
|
|
| 203-06 |
excavation and embankment
|
lump |
LUMP |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
207   |
CUYD |
15.00 |
3,105.00 |
|
|
|
|
|
|
| 302-02-A |
class ii base course (6" thick)
|
366.6 |
SQYD |
25.00 |
9,165.00 |
|
|
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
596.7 |
SQYD |
45.00 |
26,851.50 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
24.6 |
TON |
250.00 |
6,150.00 |
|
|
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
570.8 |
SQYD |
90.00 |
51,372.00 |
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
24,171   |
LNFT |
1.25 |
30,213.75 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
29,040   |
LNFT |
1.25 |
36,300.00 |
|
|
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed concrete pavement (9"
thick) (16.0 sq. yds. and under) |
2,065.6 |
SQYD |
125.00 |
258,200.00 |
|
|
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed concrete pavement (9"
thick) (16.1 sq. yds. to 48.0 sq. yds.) |
2,341.3 |
SQYD |
105.00 |
245,836.50 |
|
|
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed concrete pavement (9"
thick) (48.1 sq. yds. and over) |
3,586.7 |
SQYD |
95.00 |
340,736.50 |
|
|
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp)
|
180   |
LNFT |
275.00 |
49,500.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 710-01 |
flowable fill
|
1   |
CUYD |
300.00 |
300.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.12 |
ACRE |
1,000.00 |
120.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
5   |
LB |
20.00 |
100.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
120   |
LB |
1.00 |
120.00 |
|
|
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
115   |
SQYD |
125.00 |
14,375.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
110.0 |
CUYD |
100.00 |
11,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
607   |
EACH |
4.00 |
2,428.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
225   |
LNFT |
5.50 |
1,237.50 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
26   |
LNFT |
3.00 |
78.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.156 |
MILE |
1,900.00 |
17,396.40 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
4.578 |
MILE |
800.00 |
3,662.40 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends and symbols (arrow)
|
4   |
EACH |
225.00 |
900.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends and symbols (only)
|
4   |
EACH |
225.00 |
900.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
75   |
LNFT |
20.00 |
1,500.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| S-001 |
cleaning existing ditches
|
150   |
LNFT |
9.00 |
1,350.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,195,264.55 |
|
|
|
|
|
|
|