| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
1,200,000.00 |
1,200,000.00 |
610,000.00 |
610,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
100,000.00 |
100,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 202-02-B |
removal of concrete box culverts (sta. 10+936; 4-1.5 m
x 1.5 m x 13.4 m) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
849   |
sq m |
5.00 |
4,245.00 |
9.50 |
8,065.50 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
11.7 |
ln m |
7.00 |
81.90 |
60.00 |
702.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
53,060.5 |
sq m |
4.00 |
212,242.00 |
6.00 |
318,363.00 |
|
|
|
|
| 202-02-I |
removal of concrete headwall (sta. 101+065)
|
2   |
ea |
200.00 |
400.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 202-02-01 |
removal of 1.2 m x 2.6 m motel sign (lt. of sta.
10+108) |
1   |
ea |
500.00 |
500.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-02 |
removal of 3.7 m x 11.3 m storage building (lt. of
sta. 10+220) |
1   |
ea |
4,000.00 |
4,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-03 |
removal of 17.4 m x 26.3 m wood frame commercial
building on piers (lt. of sta. 10+238) |
1   |
ea |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 202-02-04 |
removal of 2.3 m x 1.5 m fireworks sign (lt. of sta.
10+247) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-05 |
removal of 2.7 m x 1.6 m flea market sign (lt. of
10+248) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-06 |
removal of 2.0 m x 2.0 m vaughn sign (lt. of sta.
10+786) |
1   |
ea |
1,500.00 |
1,500.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-07 |
removal of 3.2 m x 3.2 m vaughn sign (lt. of sta.
10+819) |
1   |
ea |
800.00 |
800.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-08 |
removal of 2.6 m x 1.6 m oakdale vault co. sign (lt.
of sta. 11+016) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-09 |
removal of 1.0 m x 1.5 m caldwell banker realty sign
(lt. of sta. 11+661) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-10 |
removal of 2.4 m x 1.5 m lonestar fertilizer sign (lt.
of sta. 11+830) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-11 |
removal of 4.9 m x 4.9 m metal building (lt. of sta.
102+283) |
1   |
ea |
1,800.00 |
1,800.00 |
400.00 |
400.00 |
|
|
|
|
| 202-02-12 |
removal of 14.3 m x 16.3 m metal building (lt. of sta.
102+300) |
1   |
ea |
10,000.00 |
10,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-13 |
removal of 3.7 m x 1.5 m johnson's auto sign (rt. of
sta. 102+317) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-14 |
removal of 7.8 m x 22.8 m wood frame residence on
piers (lt. of sta. 102+333) |
1   |
ea |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-15 |
removal of 4.2 m x 20.1 m mobile home on piers (lt. of
sta. 102+354) |
1   |
ea |
2,000.00 |
2,000.00 |
1,400.00 |
1,400.00 |
|
|
|
|
| 202-02-16 |
removal of 7.3 m x 6.2 m wood frame building on slab
(lt. of sta. 102+359) |
1   |
ea |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-17 |
removal of 1.6 m x 0.9 m sign (rt. of sta. 102+476)
|
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-18 |
removal of 11.2 m x 13.0 m wood frame residence on
piers (lt. of sta. 102+480) |
1   |
ea |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-19 |
removal of 28.8 m x 43.6 m concrete block building
(lt. of sta. 102+684) |
1   |
ea |
20,000.00 |
20,000.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| 202-02-20 |
removal of 9.4 m x 14.5 m brick/frame building (rt. of
sta. 103+210) |
1   |
ea |
5,000.00 |
5,000.00 |
3,300.00 |
3,300.00 |
|
|
|
|
| 202-02-21 |
removal of 16.3 m x 20.6 m brick residence on slab
(lt. of sta. 103+254) |
1   |
ea |
6,500.00 |
6,500.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 202-02-22 |
removal of 6.2 m x 15.1 m wood frame residence on
piers (rt. of sta. 105+245)(contains non-friable asbestos) |
1   |
ea |
4,000.00 |
4,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-23 |
removal of 3.1 m x 4.0 m shed (lt. of sta. 105+252)
|
1   |
ea |
700.00 |
700.00 |
500.00 |
500.00 |
|
|
|
|
| 202-02-24 |
removal of 5.2 m x 8.5 m metal building on piers (lt.
of sta. 105+272) |
1   |
ea |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-25 |
removal of 2.4 m x 8.5 m wood frame camper on piers
(lt. of sta. 105+300) |
1   |
ea |
3,000.00 |
3,000.00 |
300.00 |
300.00 |
|
|
|
|
| 202-02-26 |
removal of 6.2 m x 10.4 m wood frame residence on
piers (lt. of sta. 105+309)(contains non-friable asbestos) |
1   |
ea |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-27 |
removal of 7.1 m x 9.7 m wood frame residence on piers
(lt. of sta. 105+401)(contains non-friable asbestos) |
1   |
ea |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-28 |
removal of 5.4 m x 11.6 m wood frame building on piers
(lt. of sta. 105+568) |
1   |
ea |
3,500.00 |
3,500.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 202-02-29 |
removal of 11.8 m x 12.7 m wood frame building on
piers (rt. of sta. 105+579) |
1   |
ea |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-30 |
removal of 4.4 m x 17.9 m mobile home on piers (lt. of
sta. 105+671) |
1   |
ea |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-31 |
removal of 11.2 m x 15.5 m wood frame residence on
piers (lt. of sta. 105+800) |
1   |
ea |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-32 |
removal of 3.3 m x 4.8 m metal shed (rt. of sta.
105+815) |
1   |
ea |
900.00 |
900.00 |
300.00 |
300.00 |
|
|
|
|
| 202-02-33 |
removal of 4.7 m x 4.6 m shed (lt. of sta. 105+815)
|
1   |
ea |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
|
|
|
|
| 202-02-34 |
removal of 14.9 m x 24.5 m metal building on slab (rt.
of sta. 105+835) |
1   |
ea |
10,000.00 |
10,000.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 202-02-35 |
removal of 7.4 m x 16.1 m wood frame building on piers
(lt. of sta. 105+855)(contains non-friable asbestos) |
1   |
ea |
5,000.00 |
5,000.00 |
3,300.00 |
3,300.00 |
|
|
|
|
| 202-02-36 |
removal of 7.6 m x 20.0 m mobile home on piers (lt. of
sta. 105+934) |
1   |
ea |
4,000.00 |
4,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 202-02-37 |
removal of 7.4 m x 12.0 m wood frame residence on
piers (lt. of sta. 106+006) |
1   |
ea |
4,000.00 |
4,000.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 202-02-38 |
removal of 4.3 m x 22.6 m mobile home on piers (lt. of
sta. 106+014) |
1   |
ea |
2,500.00 |
2,500.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| 202-02-39 |
removal of 7.4 m x 10.9 m wood frame residence on
piers (lt. of sta. 106+037) |
1   |
ea |
4,000.00 |
4,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 202-02-40 |
removal of 5.0 m x 9.4 m wood frame shed on piers (lt.
of sta. 106+060) |
1   |
ea |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-41 |
removal of 2.5 m x 3.2 m wood frame shed on piers (lt.
of sta. 106+072) |
1   |
ea |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
|
|
|
|
| 202-02-42 |
removal of 19.0 m x 13.6 m wood frame residence on
piers (lt. of sta. 106+098)(contains non-friable asbestos) |
1   |
ea |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 202-02-43 |
removal of 11.0 m x 13.4 m mobile home with wood frame
addition (lt. of sta. 106+131) |
1   |
ea |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-44 |
removal of 7.4 m x 12.2 m metal building on slab (rt.
of sta. 106+150) |
1   |
ea |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-45 |
removal of 9.4 m x 17.0 m brick residence on slab (lt.
of sta. 106+189) |
1   |
ea |
5,000.00 |
5,000.00 |
3,800.00 |
3,800.00 |
|
|
|
|
| 202-02-46 |
removal of 3.6 m x 6.1 m mobile home on piers (rt. of
sta. 106+267) |
1   |
ea |
3,000.00 |
3,000.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-47 |
removal of 11.0 m x 14.3 m wood frame residence on
piers (rt. of sta. 106+280)(contains non-friable asbestos) |
1   |
ea |
6,000.00 |
6,000.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 202-02-48 |
removal of 8.6 m x 17.1 m mobile home on piers (lt. of
sta. 106+454) (contains non-friable asbestos) |
1   |
ea |
2,500.00 |
2,500.00 |
2,800.00 |
2,800.00 |
|
|
|
|
| 202-02-49 |
removal of 8.6 m x 10.4 m wood frame residence on
piers (lt. of sta. 106+482)(contains non-friable asbestos) |
1   |
ea |
4,500.00 |
4,500.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-50 |
removal of 7.3 m x 14.2 m shed (rt. of sta. 106+576)
|
1   |
ea |
700.00 |
700.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-51 |
removal of 4.0 m x 2.5 m sutton's bedding plants sign
(rt. of sta. 106+853) |
1   |
ea |
350.00 |
350.00 |
250.00 |
250.00 |
|
|
|
|
| 202-02-52 |
removal of 5.2 m x 6.2 m metal shed (lt. of sta.
106+860) |
1   |
ea |
800.00 |
800.00 |
500.00 |
500.00 |
|
|
|
|
| 202-02-53 |
removal of 23.7 m x 21.4 m greenhouse (lt. of sta.
106+877) |
1   |
ea |
9,000.00 |
9,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 202-02-54 |
removal of 1.0 m diameter x 4.2 m above ground tank)
(lt. of sta. 106+896) |
1   |
ea |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-55 |
removal of 9.3 m x 13.1 m metal building on slab (lt.
of sta. 106+899) |
1   |
ea |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-56 |
removal of 7.6 m x 18.6 m greenhouse (rt. of sta.
106+935) |
1   |
ea |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-57 |
removal of 16.2 m x 27.2 m building (gin)(lt. of sta.
106+947) |
1   |
ea |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-58 |
removal of 2.1 m x 1.5 m country green sign (rt. of
sta. 106+959) |
1   |
ea |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
|
|
| 202-02-59 |
removal of 15.8 m x 24.9 m brick building on slab (lt.
of sta. 106+984) (contains non-friable asbestos) |
1   |
ea |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-60 |
removal of 6.2 m x 12.3 m greenhouse on slab (lt. of
sta. 107+005) |
1   |
ea |
2,500.00 |
2,500.00 |
500.00 |
500.00 |
|
|
|
|
| 203-01 |
general excavation
|
212,254   |
cu m |
4.00 |
849,016.00 |
5.50 |
1,167,397.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
434   |
cu m |
12.00 |
5,208.00 |
20.00 |
8,680.00 |
|
|
|
|
| 203-03 |
muck excavation
|
6,517   |
cu m |
20.00 |
130,340.00 |
8.00 |
52,136.00 |
|
|
|
|
| 203-04 |
embankment
|
162,664   |
cu m |
7.00 |
1,138,648.00 |
6.00 |
975,984.00 |
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
3,607   |
cu m |
75.00 |
270,525.00 |
175.00 |
631,225.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
370   |
ea |
30.00 |
11,100.00 |
8.00 |
2,960.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
552   |
ln m |
20.00 |
11,040.00 |
35.00 |
19,320.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
93   |
ea |
150.00 |
13,950.00 |
100.00 |
9,300.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
34   |
ea |
500.00 |
17,000.00 |
350.00 |
11,900.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
7,150   |
ln m |
6.00 |
42,900.00 |
8.00 |
57,200.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
4   |
ea |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 302-02-C-01 |
class ii base course (250 mm thick)(stone or recycled
pccp) |
183,023.3 |
sq m |
20.50 |
3,751,977.65 |
20.00 |
3,660,466.00 |
|
|
|
|
| 302-02-D-01 |
class ii base course (300 mm thick)(stone or recycled
pccp) |
3,679.7 |
sq m |
34.00 |
125,109.80 |
36.00 |
132,469.20 |
|
|
|
|
| 302-02-E-01 |
class ii base course (430 mm thick)(stone or recycled
pccp) |
41,048.5 |
sq m |
32.00 |
1,313,552.00 |
42.00 |
1,724,037.00 |
|
|
|
|
| 302-02-F-01 |
class ii base course (180 mm thick)(stone or recycled
pccp) |
12,462.5 |
sq m |
14.00 |
174,475.00 |
20.00 |
249,250.00 |
|
|
|
|
| 304-05 |
lime treatment (type e) (300 mm thick)
|
3,725.05 |
Mg |
1.00 |
3,725.05 |
180.00 |
670,509.00 |
|
|
|
|
| 305-01-D |
subgrade layer (300 mm thick)
|
236,535   |
sq m |
6.50 |
1,537,477.50 |
6.50 |
1,537,477.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
456   |
cu m |
75.00 |
34,200.00 |
50.00 |
22,800.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
765.0 |
cu m |
125.00 |
95,625.00 |
50.00 |
38,250.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
10,489   |
sq m |
3.00 |
31,467.00 |
3.50 |
36,711.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 133   |
cu m |
0.01 |
- 1.33 |
1.00 |
- 133.00 |
|
|
|
|
| 701-02-I |
cross drain pipe arch (1350 mm equiv. rcpa)
|
62.0 |
ln m |
700.00 |
43,400.00 |
650.00 |
40,300.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
7.0 |
ln m |
240.00 |
1,680.00 |
250.00 |
1,750.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
931.3 |
ln m |
200.00 |
186,260.00 |
210.00 |
195,573.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
121.0 |
ln m |
265.00 |
32,065.00 |
275.00 |
33,275.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
192.3 |
ln m |
300.00 |
57,690.00 |
325.00 |
62,497.50 |
|
|
|
|
| 701-04-D |
storm drain pipe arch (600 mm equiv. rcpa)
|
124.0 |
ln m |
300.00 |
37,200.00 |
305.00 |
37,820.00 |
|
|
|
|
| 701-04-E |
storm drain pipe arch (750 mm equiv. rcpa)
|
79.2 |
ln m |
365.00 |
28,908.00 |
380.00 |
30,096.00 |
|
|
|
|
| 701-05-G |
side drain pipe (450 mm)
|
268.4 |
ln m |
180.00 |
48,312.00 |
200.00 |
53,680.00 |
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
313.9 |
ln m |
250.00 |
78,475.00 |
230.00 |
72,197.00 |
|
|
|
|
| 701-05-K |
side drain pipe (750 mm)
|
316.7 |
ln m |
275.00 |
87,092.50 |
400.00 |
126,680.00 |
|
|
|
|
| 701-05-M |
side drain pipe (900 mm)
|
22.2 |
ln m |
410.00 |
9,102.00 |
420.00 |
9,324.00 |
|
|
|
|
| 701-05-N |
side drain pipe (1050 mm)
|
35.3 |
ln m |
485.00 |
17,120.50 |
520.00 |
18,356.00 |
|
|
|
|
| 701-05-O |
side drain pipe (1200 mm)
|
38.1 |
ln m |
515.00 |
19,621.50 |
550.00 |
20,955.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (200 mm)
|
13.7 |
ln m |
95.00 |
1,301.50 |
150.00 |
2,055.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(600 mm)
|
30.7 |
ln m |
300.00 |
9,210.00 |
400.00 |
12,280.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01m)
|
33   |
ea |
2,800.00 |
92,400.00 |
3,700.00 |
122,100.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02m)
|
2   |
ea |
6,800.00 |
13,600.00 |
4,200.00 |
8,400.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06m)
|
7   |
ea |
5,000.00 |
35,000.00 |
4,000.00 |
28,000.00 |
|
|
|
|
| 702-03-D |
catch basins (cb-07m)
|
1   |
ea |
5,500.00 |
5,500.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 702-03-F |
catch basins (cb-08m)
|
1   |
ea |
10,000.00 |
10,000.00 |
8,800.00 |
8,800.00 |
|
|
|
|
| 702-03-G |
catch basins (cb-09m)
|
1   |
ea |
7,000.00 |
7,000.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| 702-03-H |
catch basins (cb-05m)
|
3   |
ea |
1,200.00 |
3,600.00 |
1,300.00 |
3,900.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
43   |
ea |
1,200.00 |
51,600.00 |
2,000.00 |
86,000.00 |
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
28   |
ea |
4,800.00 |
134,400.00 |
3,500.00 |
98,000.00 |
|
|
|
|
| 703-02 |
shoulder outlet underdrains
|
54   |
ea |
800.00 |
43,200.00 |
380.00 |
20,520.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
4,638   |
ln m |
20.00 |
92,760.00 |
22.00 |
102,036.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
5,031   |
ln m |
17.50 |
88,042.50 |
15.00 |
75,465.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
94   |
ln m |
21.00 |
1,974.00 |
20.00 |
1,880.00 |
|
|
|
|
| 705-03 |
single swinging walk gates
|
1   |
ea |
500.00 |
500.00 |
350.00 |
350.00 |
|
|
|
|
| 705-05 |
double swinging driveway gates
|
12   |
dbgt |
700.00 |
8,400.00 |
550.00 |
6,600.00 |
|
|
|
|
| 705-06-B |
chain link fence (1500 mm height)
|
165   |
ln m |
22.00 |
3,630.00 |
50.00 |
8,250.00 |
|
|
|
|
| 705-06-C |
chain link fence (1800 mm height)
|
62   |
ln m |
24.00 |
1,488.00 |
80.00 |
4,960.00 |
|
|
|
|
| 705-08-C-01 |
7-meter double gates for chain link fence (1800 mm
height) |
1   |
dbgt |
1,200.00 |
1,200.00 |
950.00 |
950.00 |
|
|
|
|
| 705-08-C-02 |
10 m double gates for chain link fence (1800 mm height)
|
1   |
dbgt |
1,800.00 |
1,800.00 |
1,050.00 |
1,050.00 |
|
|
|
|
| 705-08-C-03 |
11 m double gates for chain link fence (1800 mm height)
|
1   |
dbgt |
2,100.00 |
2,100.00 |
1,250.00 |
1,250.00 |
|
|
|
|
| 705-09 |
rebuilt fence
|
242   |
ln m |
80.00 |
19,360.00 |
50.00 |
12,100.00 |
|
|
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
2,987.0 |
sq m |
58.00 |
173,246.00 |
60.00 |
179,220.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
150   |
ea |
350.00 |
52,500.00 |
200.00 |
30,000.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
107   |
ea |
350.00 |
37,450.00 |
200.00 |
21,400.00 |
|
|
|
|
| 709-01 |
steel cattle guard
|
1   |
ea |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 712-01-C |
concrete cast-in-place revetment (150 mm thick)
|
398   |
sq m |
60.00 |
23,880.00 |
75.00 |
29,850.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
160,000.00 |
160,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
26.505 |
km |
1.00 |
26.51 |
5,750.00 |
152,403.75 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
12.2 |
hctr |
1,700.00 |
20,740.00 |
1,590.00 |
19,398.00 |
|
|
|
|
| 717-01 |
seeding
|
2,600   |
kg |
14.00 |
36,400.00 |
16.50 |
42,900.00 |
|
|
|
|
| 718-01 |
fertilizer
|
79,095   |
kg |
0.75 |
59,321.25 |
0.55 |
43,502.25 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
100,000.00 |
100,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 724-01-A |
pavement patching (150 mm minimum thickness)
|
147   |
sq m |
170.00 |
24,990.00 |
300.00 |
44,100.00 |
|
|
|
|
| 726-01 |
bedding material
|
1,240.9 |
cu m |
80.00 |
99,272.00 |
85.00 |
105,476.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
2,500,000.00 |
2,500,000.00 |
2,800,000.00 |
2,800,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
89   |
ea |
80.00 |
7,120.00 |
75.00 |
6,675.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,977   |
ea |
5.50 |
16,373.50 |
6.50 |
19,350.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
67.223 |
km |
1,500.00 |
100,834.50 |
1,650.00 |
110,917.95 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
7   |
ea |
180.00 |
1,260.00 |
400.00 |
2,800.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
16   |
ea |
200.00 |
3,200.00 |
400.00 |
6,400.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
7   |
ea |
200.00 |
1,400.00 |
400.00 |
2,800.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
12.583 |
km |
3,600.00 |
45,298.80 |
3,950.00 |
49,702.85 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
360,000.00 |
360,000.00 |
400,000.00 |
400,000.00 |
|
|
|
|
| 740-02 |
utility oversight and coordination
|
lump |
lump |
100,000.00 |
100,000.00 |
8,500.00 |
8,500.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
lump |
120,000.00 |
120,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
5.81 |
cu m |
1,400.00 |
8,134.00 |
1,000.00 |
5,810.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
122.12 |
cu m |
1,200.00 |
146,544.00 |
1,100.00 |
134,332.00 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
691.20 |
ln m |
1,280.00 |
884,736.00 |
980.00 |
677,376.00 |
|
|
|
|
| 805-12-F |
reinforced concrete box culverts (1500 mm x 1200 mm)
|
362.00 |
ln m |
1,000.00 |
362,000.00 |
1,100.00 |
398,200.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
185.10 |
ln m |
1,100.00 |
203,610.00 |
1,150.00 |
212,865.00 |
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
123.60 |
ln m |
1,400.00 |
173,040.00 |
1,300.00 |
160,680.00 |
|
|
|
|
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
216.80 |
ln m |
2,700.00 |
585,360.00 |
1,850.00 |
401,080.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (1200 mm x 600 mm)
|
57.00 |
ln m |
1,000.00 |
57,000.00 |
900.00 |
51,300.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
7,611   |
kg |
2.80 |
21,310.80 |
2.00 |
15,222.00 |
|
|
|
|
| S-001 |
paved gutter drains
|
98   |
each |
2,200.00 |
215,600.00 |
1,200.00 |
117,600.00 |
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
27.8 |
km |
500.00 |
13,900.00 |
500.00 |
13,900.00 |
|
|
|
|
| S-003 |
sawcutting existing concrete pavement
|
21   |
ln m |
40.00 |
840.00 |
50.00 |
1,050.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
19,322,634.43 |
|
19,971,881.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
92,211.0 |
Mg |
75.00 |
6,915,825.00 |
0.00 |
0.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
13,017.4 |
Mg |
100.00 |
1,301,740.00 |
0.00 |
0.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
4,723.0 |
ln m |
48.00 |
226,704.00 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (solid line)(100 mm width)
|
37.187 |
km |
675.00 |
25,101.23 |
0.00 |
0.00 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
8,469,370.23 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,867.3 |
Mg |
0.00 |
0.00 |
105.00 |
826,066.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,026.5 |
Mg |
0.00 |
0.00 |
115.00 |
118,047.50 |
|
|
|
|
| 601-01-U |
portland cement concrete pavement (230 mm thick)
|
158,765.4 |
sq m |
0.00 |
0.00 |
50.00 |
7,938,270.00 |
|
|
|
|
| 601-02-U |
portland cement concrete pavement (230 mm thick)
(crossovers & turnouts) |
21,995.3 |
sq m |
0.00 |
0.00 |
74.00 |
1,627,652.20 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
10   |
ea |
0.00 |
0.00 |
90.00 |
900.00 |
|
|
|
|
| 707-01 |
concrete curb
|
4,723.0 |
ln m |
0.00 |
0.00 |
8.00 |
37,784.00 |
|
|
|
|
| 732-03-A |
plastic pvmt striping(broken line)(100mmwidth)
|
1.209 |
km |
0.00 |
0.00 |
745.00 |
900.71 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v) |
35.978 |
km |
0.00 |
0.00 |
3,350.00 |
120,526.30 |
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
|
|
10,670,147.21 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
27,792,004.66 |
|
30,642,028.21 |
|
|
|
|
| | NUMBER OF DAYS BID AT $3,050 PER DAY. |
|
|
|
1,296,250.00 |
|
2,433,900.00 |
|
|
|
|
| | LIFE CYCLE COST |
|
|
|
|
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
29,088,254.66 |
|
33,075,928.21 |
|
|
|
|
|