| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
900,000.00 |
900,000.00 |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-A-01 |
removal of bridges sta. 116+02, (28' x 120' conc. slab
span bridge) |
1   |
EACH |
50,000.00 |
50,000.00 |
90,000.00 |
90,000.00 |
90,000.00 |
90,000.00 |
|
|
| 202-02-A-02 |
removal of bridges sta. 125+67, (28' x 362' i-beam
bridge) |
1   |
EACH |
120,000.00 |
120,000.00 |
160,000.00 |
160,000.00 |
150,000.00 |
150,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta 180+84; 2-6'x4'
r.c.box w/headwalls) |
1   |
EACH |
3,000.00 |
3,000.00 |
13,000.00 |
13,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta 216+14.26; 2-5'
x 4' r.c. box w/ headwalls) |
1   |
EACH |
3,000.00 |
3,000.00 |
11,000.00 |
11,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta 250+19; 5'x4'
r.c. box w/headwalls) |
1   |
EACH |
3,000.00 |
3,000.00 |
11,000.00 |
11,000.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
9,356   |
SQYD |
6.00 |
56,136.00 |
12.00 |
112,272.00 |
15.00 |
140,340.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
43,643.4 |
SQYD |
4.00 |
174,573.60 |
5.00 |
218,217.00 |
3.00 |
130,930.20 |
|
|
| 202-02-H |
removal of guard rail
|
953   |
LNFT |
4.00 |
3,812.00 |
5.00 |
4,765.00 |
5.00 |
4,765.00 |
|
|
| 202-02-I |
removal of and/or re-installation of existing signal
equipment |
lump |
LUMP |
5,800.00 |
5,800.00 |
5,800.00 |
5,800.00 |
7,500.00 |
7,500.00 |
|
|
| 202-02-J-01 |
removal of existing headwalls (sta. 162+00; rt.)
|
lump |
LUMP |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-J-02 |
removal of existing headwalls (sta. 194+82; lt. & rt.)
|
lump |
LUMP |
3,000.00 |
3,000.00 |
3,500.00 |
3,500.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-01 |
removal of septic tank (sta. 207+00 lt., sta.
219+00 rt.) |
2   |
EACH |
1,000.00 |
2,000.00 |
4,000.00 |
8,000.00 |
3,000.00 |
6,000.00 |
|
|
| 203-01 |
general excavation
|
91,682   |
CUYD |
7.00 |
641,774.00 |
7.75 |
710,535.50 |
12.50 |
1,146,025.00 |
|
|
| 203-02 |
drainage excavation
|
1,271   |
CUYD |
12.00 |
15,252.00 |
16.00 |
20,336.00 |
12.50 |
15,887.50 |
|
|
| 203-04 |
embankment
|
133,691   |
CUYD |
15.00 |
2,005,365.00 |
10.50 |
1,403,755.50 |
12.50 |
1,671,137.50 |
|
|
| 204-04 |
temporary sediment basins
|
21   |
EACH |
200.00 |
4,200.00 |
500.00 |
10,500.00 |
250.00 |
5,250.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
59   |
EACH |
110.00 |
6,490.00 |
110.00 |
6,490.00 |
200.00 |
11,800.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
73   |
EACH |
600.00 |
43,800.00 |
450.00 |
32,850.00 |
800.00 |
58,400.00 |
|
|
| 204-06 |
temporary silt fencing
|
6,200   |
LNFT |
1.30 |
8,060.00 |
2.50 |
15,500.00 |
2.00 |
12,400.00 |
|
|
| 302-02-D |
class ii base course (12" thick) (crushed stone or
recycled pccp) |
5,793.9 |
SQYD |
33.00 |
191,198.70 |
29.00 |
168,023.10 |
36.00 |
208,580.40 |
|
|
| 302-02-E |
class ii base course (8" thick) (crushed stone or
recycled pccp) |
145,696.6 |
SQYD |
23.00 |
3,351,021.80 |
22.00 |
3,205,325.20 |
24.00 |
3,496,718.40 |
|
|
| 304-01 |
lime
|
1,029.30 |
TON |
50.00 |
51,465.00 |
140.00 |
144,102.00 |
150.00 |
154,395.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
72,614   |
SQYD |
0.50 |
36,307.00 |
1.65 |
119,813.10 |
1.00 |
72,614.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,000.0 |
CUYD |
55.00 |
165,000.00 |
85.00 |
255,000.00 |
55.00 |
165,000.00 |
|
|
| 502-01 |
superpave asphltic concrete
|
1,526.4 |
TON |
90.00 |
137,376.00 |
90.00 |
137,376.00 |
80.00 |
122,112.00 |
|
|
| 502-01-A |
superpave asphltic concrete, paved drives and turnouts
|
2,883.0 |
TON |
120.00 |
345,960.00 |
115.00 |
331,545.00 |
100.00 |
288,300.00 |
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
110,447.4 |
SQYD |
47.50 |
5,246,251.50 |
53.00 |
5,853,712.20 |
60.00 |
6,626,844.00 |
|
|
| 601-03-G-K |
portland cement concrete shoulder (8"-10" thick)
|
34,616.6 |
SQYD |
46.00 |
1,592,363.60 |
54.00 |
1,869,296.40 |
60.00 |
2,076,996.00 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
185   |
EACH |
100.00 |
18,500.00 |
95.00 |
17,575.00 |
150.00 |
27,750.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
154   |
LNFT |
82.00 |
12,628.00 |
70.00 |
10,780.00 |
85.00 |
13,090.00 |
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
126   |
LNFT |
100.00 |
12,600.00 |
100.00 |
12,600.00 |
100.00 |
12,600.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
102   |
LNFT |
140.00 |
14,280.00 |
140.00 |
14,280.00 |
120.00 |
12,240.00 |
|
|
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
492   |
LNFT |
175.00 |
86,100.00 |
190.00 |
93,480.00 |
160.00 |
78,720.00 |
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
372   |
LNFT |
190.00 |
70,680.00 |
210.00 |
78,120.00 |
180.00 |
66,960.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp)
|
190   |
LNFT |
80.00 |
15,200.00 |
85.00 |
16,150.00 |
85.00 |
16,150.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
4,398   |
LNFT |
63.00 |
277,074.00 |
60.00 |
263,880.00 |
80.00 |
351,840.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
200   |
LNFT |
80.00 |
16,000.00 |
70.00 |
14,000.00 |
95.00 |
19,000.00 |
|
|
| 701-05-M |
side drain pipe (36")
|
32   |
LNFT |
110.00 |
3,520.00 |
100.00 |
3,200.00 |
105.00 |
3,360.00 |
|
|
| 701-05-N |
side drain pipe (42")
|
540   |
LNFT |
130.00 |
70,200.00 |
130.00 |
70,200.00 |
120.00 |
64,800.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
2   |
EACH |
4,200.00 |
8,400.00 |
5,000.00 |
10,000.00 |
3,000.00 |
6,000.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
18,918   |
LNFT |
10.00 |
189,180.00 |
11.00 |
208,098.00 |
7.00 |
132,426.00 |
|
|
| 703-02 |
shoulder outlet underdrains
|
109   |
EACH |
450.00 |
49,050.00 |
600.00 |
65,400.00 |
350.00 |
38,150.00 |
|
|
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
17.00 |
3,400.00 |
17.00 |
3,400.00 |
20.00 |
4,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
58.00 |
5,800.00 |
60.00 |
6,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,300.00 |
9,200.00 |
2,300.00 |
9,200.00 |
2,500.00 |
10,000.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
775   |
LNFT |
8.00 |
6,200.00 |
8.00 |
6,200.00 |
10.00 |
7,750.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
4,903.0 |
SQYD |
55.00 |
269,665.00 |
56.00 |
274,568.00 |
45.00 |
220,635.00 |
|
|
| 706-02-D |
concrete drive (12" thick)
|
578.3 |
SQYD |
85.00 |
49,155.50 |
85.00 |
49,155.50 |
75.00 |
43,372.50 |
|
|
| 707-01 |
concrete curb
|
1,577.5 |
LNFT |
12.00 |
18,930.00 |
10.00 |
15,775.00 |
8.00 |
12,620.00 |
|
|
| 708-01 |
right-of-way monument
|
78   |
EACH |
150.00 |
11,700.00 |
100.00 |
7,800.00 |
400.00 |
31,200.00 |
|
|
| 711-01-D |
riprap (55 lb, 18" thick)
|
2,275   |
SQYD |
65.00 |
147,875.00 |
56.00 |
127,400.00 |
85.00 |
193,375.00 |
|
|
| 711-04 |
geotextile fabric
|
2,275   |
SQYD |
2.50 |
5,687.50 |
3.60 |
8,190.00 |
2.50 |
5,687.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
300,000.00 |
300,000.00 |
100,000.00 |
100,000.00 |
250,000.00 |
250,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.276 |
MILE |
650.00 |
4,079.40 |
650.00 |
4,079.40 |
750.00 |
4,707.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
19.640 |
MILE |
15,800.00 |
310,312.00 |
15,840.00 |
311,097.60 |
18,000.00 |
353,520.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
70.00 |
420.00 |
64.00 |
384.00 |
75.00 |
450.00 |
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
49   |
EACH |
1,000.00 |
49,000.00 |
900.00 |
44,100.00 |
1,000.00 |
49,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
55.20 |
ACRE |
750.00 |
41,400.00 |
750.00 |
41,400.00 |
850.00 |
46,920.00 |
|
|
| 717-01 |
seeding
|
3,402   |
LB |
8.50 |
28,917.00 |
8.50 |
28,917.00 |
10.00 |
34,020.00 |
|
|
| 718-01 |
fertilizer
|
113,400   |
LB |
0.24 |
27,216.00 |
0.25 |
28,350.00 |
0.30 |
34,020.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
6,513   |
SQYD |
1.25 |
8,141.25 |
1.30 |
8,466.90 |
1.50 |
9,769.50 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
1,245   |
SQYD |
2.50 |
3,112.50 |
2.55 |
3,174.75 |
3.00 |
3,735.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
300   |
SQYD |
90.00 |
27,000.00 |
125.00 |
37,500.00 |
75.00 |
22,500.00 |
|
|
| 725-02 |
temporary detour roads
|
15,877.0 |
SQYD |
52.00 |
825,604.00 |
60.00 |
952,620.00 |
66.00 |
1,047,882.00 |
|
|
| 726-01 |
bedding material
|
554.2 |
CUYD |
65.00 |
36,023.00 |
65.00 |
36,023.00 |
60.00 |
33,252.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,700,000.00 |
2,700,000.00 |
2,600,000.00 |
2,600,000.00 |
2,400,000.00 |
2,400,000.00 |
|
|
| 729-01 |
sign (type a)
|
50.0 |
SQFT |
40.00 |
2,000.00 |
35.00 |
1,750.00 |
35.00 |
1,750.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
28   |
EACH |
75.00 |
2,100.00 |
75.00 |
2,100.00 |
85.00 |
2,380.00 |
|
|
| 729-19-B |
dead end road installations(type b)
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,280.00 |
2,560.00 |
1,500.00 |
3,000.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
420   |
EACH |
12.20 |
5,124.00 |
12.00 |
5,040.00 |
14.00 |
5,880.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,335   |
EACH |
5.20 |
12,142.00 |
5.25 |
12,258.75 |
6.00 |
14,010.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
280   |
LNFT |
1.20 |
336.00 |
1.25 |
350.00 |
2.00 |
560.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
328   |
LNFT |
3.60 |
1,180.80 |
3.50 |
1,148.00 |
4.00 |
1,312.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.495 |
MILE |
2,400.00 |
32,388.00 |
2,365.00 |
31,915.68 |
2,800.00 |
37,786.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape(type v) |
12.056 |
MILE |
4,000.00 |
48,224.00 |
3,950.00 |
47,621.20 |
1,200.00 |
14,467.20 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
54   |
EACH |
160.00 |
8,640.00 |
155.00 |
8,370.00 |
175.00 |
9,450.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
170.00 |
680.00 |
165.00 |
660.00 |
200.00 |
800.00 |
|
|
| 732-05 |
removal of existing markings
|
3.512 |
MILE |
5,700.00 |
20,018.40 |
5,700.00 |
20,018.40 |
6,500.00 |
22,828.00 |
|
|
| 735-01 |
mailboxes
|
68   |
EACH |
1.00 |
68.00 |
6.00 |
408.00 |
2.00 |
136.00 |
|
|
| 735-02 |
mailbox supports (single)
|
68   |
EACH |
120.00 |
8,160.00 |
114.00 |
7,752.00 |
130.00 |
8,840.00 |
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
170.00 |
680.00 |
205.00 |
820.00 |
200.00 |
800.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
300.00 |
300.00 |
250.00 |
250.00 |
300.00 |
300.00 |
|
|
| 736-01 |
trenching and backfilling
|
895   |
LNFT |
4.00 |
3,580.00 |
3.75 |
3,356.25 |
4.25 |
3,803.75 |
|
|
| 736-04-B |
signal support, 30' class 5 cca wood pole
|
4   |
EACH |
750.00 |
3,000.00 |
750.00 |
3,000.00 |
1,000.00 |
4,000.00 |
|
|
| 736-04-C |
signal support, 30' strain pole
|
4   |
EACH |
6,500.00 |
26,000.00 |
6,425.00 |
25,700.00 |
7,500.00 |
30,000.00 |
|
|
| 736-05-B |
signal heads (3-section, r,y,g) l.e.d.
|
8   |
EACH |
810.00 |
6,480.00 |
805.00 |
6,440.00 |
905.00 |
7,240.00 |
|
|
| 736-05-C |
signal heads (5 section, r,y,rty,g,rtg) l.e.d.
|
4   |
EACH |
1,110.00 |
4,440.00 |
1,110.00 |
4,440.00 |
1,250.00 |
5,000.00 |
|
|
| 736-06 |
signal service, power pedestal
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,005.00 |
1,005.00 |
1,200.00 |
1,200.00 |
|
|
| 736-08 |
signal controller, (8 phase nema with type 6 cabinet)
|
1   |
EACH |
17,500.00 |
17,500.00 |
17,000.00 |
17,000.00 |
20,000.00 |
20,000.00 |
|
|
| 736-09 |
loop detector
|
146   |
LNFT |
10.00 |
1,460.00 |
11.00 |
1,606.00 |
15.00 |
2,190.00 |
|
|
| 736-10-A |
underground junction box, type "e"
|
4   |
EACH |
360.00 |
1,440.00 |
400.00 |
1,600.00 |
450.00 |
1,800.00 |
|
|
| 736-10-B |
underground junction box, type "h"
|
2   |
EACH |
760.00 |
1,520.00 |
800.00 |
1,600.00 |
900.00 |
1,800.00 |
|
|
| 736-11-A |
conduit (1/2" p.e.c. schedule 80)
|
180   |
LNFT |
4.50 |
810.00 |
4.50 |
810.00 |
5.50 |
990.00 |
|
|
| 736-11-B |
conduit (2" p.e.c. schedule 80)
|
680   |
LNFT |
5.00 |
3,400.00 |
5.00 |
3,400.00 |
6.00 |
4,080.00 |
|
|
| 736-11-C |
conduit (3" p.e.c. schedule 80)
|
135   |
LNFT |
6.30 |
850.50 |
6.25 |
843.75 |
8.00 |
1,080.00 |
|
|
| 736-12-A |
conductor, 2c (loop lead-in / #16 awg)
|
1,770   |
LNFT |
1.30 |
2,301.00 |
1.25 |
2,212.50 |
1.50 |
2,655.00 |
|
|
| 736-12-B |
conductor, 6c (signal / #14 awg)
|
90   |
LNFT |
2.00 |
180.00 |
2.00 |
180.00 |
2.50 |
225.00 |
|
|
| 736-12-C |
conductor, 10c (signal / #14 awg)
|
2,670   |
LNFT |
2.50 |
6,675.00 |
2.50 |
6,675.00 |
3.00 |
8,010.00 |
|
|
| 736-12-D |
conductor, 3c (power)
|
85   |
LNFT |
5.50 |
467.50 |
6.00 |
510.00 |
7.00 |
595.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
300,000.00 |
300,000.00 |
385,000.00 |
385,000.00 |
300,000.00 |
300,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
40,000.00 |
40,000.00 |
10,000.00 |
10,000.00 |
630,000.00 |
630,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
320   |
LNFT |
90.00 |
28,800.00 |
140.00 |
44,800.00 |
48.00 |
15,360.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
4,400   |
LNFT |
115.00 |
506,000.00 |
125.00 |
550,000.00 |
125.00 |
550,000.00 |
|
|
| 804-01-G |
precast concrete piles (30")
|
7,480   |
LNFT |
145.00 |
1,084,600.00 |
175.00 |
1,309,000.00 |
160.00 |
1,196,800.00 |
|
|
| 804-05 |
precast concrete test piles
|
2   |
EACH |
30,000.00 |
60,000.00 |
35,000.00 |
70,000.00 |
35,000.00 |
70,000.00 |
|
|
| 804-09 |
loading test piles
|
2   |
EACH |
12,000.00 |
24,000.00 |
26,600.00 |
53,200.00 |
6,000.00 |
12,000.00 |
|
|
| 804-10 |
reloading test piles
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,500.00 |
3,000.00 |
1,200.00 |
2,400.00 |
|
|
| 804-11 |
redriving test piles
|
2   |
EACH |
1,000.00 |
2,000.00 |
475.00 |
950.00 |
1,200.00 |
2,400.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,000.00 |
2,000.00 |
5,000.00 |
10,000.00 |
1,200.00 |
2,400.00 |
|
|
| 804-17 |
dynamic monitoring
|
6   |
EACH |
1,000.00 |
6,000.00 |
2,000.00 |
12,000.00 |
3,500.00 |
21,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
39.87 |
CUYD |
1,100.00 |
43,857.00 |
1,000.00 |
39,870.00 |
1,200.00 |
47,844.00 |
|
|
| 805-01-C |
class a concrete (retaining walls)
|
25.51 |
CUYD |
1,100.00 |
28,061.00 |
1,050.00 |
26,785.50 |
1,200.00 |
30,612.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
684.34 |
CUYD |
720.00 |
492,724.80 |
800.00 |
547,472.00 |
1,000.00 |
684,340.00 |
|
|
| 805-03 |
class aa concrete
|
1,446.05 |
CUYD |
600.00 |
867,630.00 |
645.00 |
932,702.25 |
900.00 |
1,301,445.00 |
|
|
| 805-08-C |
precast-prestressed concrete girder (type iii)
|
7,375.5 |
LNFT |
115.00 |
848,182.50 |
100.00 |
737,550.00 |
130.00 |
958,815.00 |
|
|
| 805-11 |
strip seal joints
|
328.00 |
LNFT |
150.00 |
49,200.00 |
200.00 |
65,600.00 |
175.00 |
57,400.00 |
|
|
| 805-12-G |
reinforced concrete box culverts (6' x 4')
|
574.0 |
LNFT |
400.00 |
229,600.00 |
425.00 |
243,950.00 |
525.00 |
301,350.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
485,484   |
LB |
0.90 |
436,935.60 |
0.85 |
412,661.40 |
1.00 |
485,484.00 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
1,494.00 |
LNFT |
52.00 |
77,688.00 |
45.00 |
67,230.00 |
85.00 |
126,990.00 |
|
|
| 813-01 |
concrete approach slabs
|
1,458.48 |
SQYD |
160.00 |
233,356.80 |
170.00 |
247,941.60 |
220.00 |
320,865.60 |
|
|
| S-001 |
paved gutter drain
|
3   |
EACH |
1,500.00 |
4,500.00 |
3,000.00 |
9,000.00 |
3,000.00 |
9,000.00 |
|
|
| S-002 |
riser, 3" diameter
|
1   |
EACH |
1,000.00 |
1,000.00 |
975.00 |
975.00 |
1,500.00 |
1,500.00 |
|
|
| S-003 |
video detection camera device and connection
|
4   |
EACH |
6,000.00 |
24,000.00 |
6,000.00 |
24,000.00 |
6,800.00 |
27,200.00 |
|
|
| S-004 |
video detection camera system (joor at lovett)
|
1   |
EACH |
3,100.00 |
3,100.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
|
|
| S-005 |
disposal of concrete
|
100   |
CUYD |
45.00 |
4,500.00 |
75.00 |
7,500.00 |
20.00 |
2,000.00 |
|
|
| S-006 |
removal of vegetative debris
|
100   |
CUYD |
40.00 |
4,000.00 |
30.00 |
3,000.00 |
35.00 |
3,500.00 |
|
|
| S-007 |
saw cutting (full depth)
|
787.5 |
INFT |
2.00 |
1,575.00 |
2.50 |
1,968.75 |
6.00 |
4,725.00 |
|
|
| S-008 |
tree protection and mulching
|
lump |
LUMP |
30,000.00 |
30,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
| S-101 |
impact attenuators (construction zone)
|
4   |
EACH |
21,000.00 |
84,000.00 |
27,500.00 |
110,000.00 |
25,000.00 |
100,000.00 |
|
|
| S-102 |
dynamic analysis
|
4   |
EACH |
1,000.00 |
4,000.00 |
1,000.00 |
4,000.00 |
3,500.00 |
14,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
26,806,512.25 |
|
26,862,635.18 |
|
29,998,395.05 |
|
|
|