| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - LOUISIANA BRIDGE, INC. |
- 2 - C W & W CONTRACTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 15+00 - 16.5ft. x 78ft. timber
bridge) |
1   |
EACH |
8,100.00 |
8,100.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
13,800.00 |
13,800.00 |
17,500.00 |
17,500.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
3   |
EACH |
1.00 |
3.00 |
5.00 |
15.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
160   |
LNFT |
0.10 |
16.00 |
5.00 |
800.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
1.00 |
4.00 |
75.00 |
300.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
460   |
LNFT |
0.10 |
46.00 |
1.00 |
460.00 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
18.2 |
CUYD |
100.00 |
1,820.00 |
100.00 |
1,820.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
257   |
LNFT |
7.50 |
1,927.50 |
15.00 |
3,855.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
277   |
SQYD |
60.00 |
16,620.00 |
70.00 |
19,390.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
277   |
SQYD |
3.00 |
831.00 |
3.00 |
831.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.07 |
ACRE |
12,485.00 |
873.95 |
4,500.00 |
315.00 |
|
|
|
|
| 717-01 |
seeding
|
3   |
LB |
113.50 |
340.50 |
200.00 |
600.00 |
|
|
|
|
| 718-01 |
fertilizer
|
70   |
LB |
4.54 |
317.80 |
5.00 |
350.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
29,000.00 |
29,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
115.00 |
460.00 |
85.00 |
340.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,300.00 |
2,300.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,170   |
LNFT |
53.60 |
62,712.00 |
65.00 |
76,050.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
250.00 |
250.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(24ft. clr.
roadway;90 degree crossing) |
5   |
SPAN |
23,350.00 |
116,750.00 |
25,000.00 |
125,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs(24ft. clear roadway;
90 crossing;tapered barrier rails) |
2   |
EACH |
7,000.00 |
14,000.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
279,922.75 |
|
342,876.00 |
|
|
|
|
|