| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - QUALITY DESIGN & CONSTRUCTION, INC. |
- 2 - BEN ALLEN, INC. |
- 3 - C W & W CONTRACTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,181.00 |
10,181.00 |
25,000.00 |
25,000.00 |
16,000.00 |
16,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta.100+00,20.6' wide x 58.0' long
timber bridge with wingwalls) |
1   |
EACH |
10,310.70 |
10,310.70 |
4,000.00 |
4,000.00 |
7,500.00 |
7,500.00 |
|
|
| 202-02-A-02 |
removal of bridge(sta.100+00,22.7' wide x 29.9' long
timber bridge with wingwalls) |
1   |
EACH |
6,873.80 |
6,873.80 |
4,000.00 |
4,000.00 |
7,500.00 |
7,500.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
12,181.30 |
12,181.30 |
29,000.00 |
29,000.00 |
22,000.00 |
22,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
13.60 |
272.00 |
FREE |
FREE |
6.00 |
120.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
181.60 |
1,452.80 |
FREE |
FREE |
75.00 |
600.00 |
|
|
| 204-06 |
temporary silt fencing
|
250   |
LNFT |
2.00 |
500.00 |
FREE |
FREE |
1.00 |
250.00 |
|
|
| 302-01 |
class ii base course
|
152.2 |
CUYD |
87.89 |
13,376.86 |
100.00 |
15,220.00 |
90.00 |
13,698.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
19   |
CUYD |
64.70 |
1,229.30 |
100.00 |
1,900.00 |
100.00 |
1,900.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
117.8 |
TON |
239.70 |
28,236.66 |
185.00 |
21,793.00 |
225.00 |
26,505.00 |
|
|
| 705-01 |
barbed wire fence
|
305   |
LNFT |
7.40 |
2,257.00 |
15.00 |
4,575.00 |
15.00 |
4,575.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
18,330.10 |
18,330.10 |
9,000.00 |
9,000.00 |
22,000.00 |
22,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.18 |
ACRE |
3,000.00 |
540.00 |
1,000.00 |
180.00 |
4,500.00 |
810.00 |
|
|
| 717-01 |
seeding
|
8   |
LB |
6.30 |
50.40 |
50.00 |
400.00 |
50.00 |
400.00 |
|
|
| 718-01 |
fertilizer
|
181   |
LB |
0.50 |
90.50 |
5.00 |
905.00 |
1.00 |
181.00 |
|
|
| 726-01 |
bedding material
|
178.4 |
CUYD |
113.60 |
20,266.24 |
95.00 |
16,948.00 |
100.00 |
17,840.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
29,000.00 |
29,000.00 |
50,000.00 |
50,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
78.60 |
628.80 |
85.00 |
680.00 |
85.00 |
680.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,096.40 |
7,096.40 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
34.70 |
CUYD |
1,102.40 |
38,253.28 |
1,400.00 |
48,580.00 |
1,200.00 |
41,640.00 |
|
|
| 805-12-G |
reinforced concrete box culverts (6'x 4')
|
76.0 |
LNFT |
404.00 |
30,704.00 |
725.00 |
55,100.00 |
600.00 |
45,600.00 |
|
|
| 805-12-K |
reinforced concrete box culverts (7'x 5')
|
120.0 |
LNFT |
461.30 |
55,356.00 |
750.00 |
90,000.00 |
700.00 |
84,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
3,060   |
LB |
2.30 |
7,038.00 |
3.00 |
9,180.00 |
1.50 |
4,590.00 |
|
|
| S-001 |
water gate
|
1   |
ea |
1,829.90 |
1,829.90 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
272,055.04 |
|
372,461.00 |
|
393,389.00 |
|
|
|