Letting of 8/30/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 713-14-0106
Parish: CLAIBORNE
Routes:
Description: HUBIE LEWIS ROAD BRIDGE OVER BOND CREEK
Type Const: grading, removal of bridge, class ii base course, reinforced concrete box culverts,
superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $290,989.50
 
RankLicenseBidderConstruction Bid
1 18546 C W & W CONTRACTORS, INC. $338,171.50
2 44111 CONSTRUCTING SOLUTIONS LLC $349,636.00
3 32044 QUALITY DESIGN & CONSTRUCTION, INC. $355,785.04
 
Item Number Item Description Quantity Unit of Measure - 1 -
C W & W CONTRACTORS, INC.
- 2 -
CONSTRUCTING SOLUTIONS LLC
- 3 -
QUALITY DESIGN & CONSTRUCTION, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 8,367.20 8,367.20    
202-02-A-01 removal of bridge (sta. 15+49.70, 20.6' w x 32.11' l
timber bridge)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00 9,981.60 9,981.60    
202-02-I removal of cross drain pipe (24" rcp) lump      LUMP 2,000.00 2,000.00 3,000.00 3,000.00 1,969.70 1,969.70    
203-06 excavation & embankment lump      LUMP 15,500.00 15,500.00 15,000.00 15,000.00 5,506.80 5,506.80    
204-02 temporary hay or straw bales 14      EACH 5.00 70.00 15.00 210.00 13.60 190.40    
204-05-A temporary sediment check dams (hay) 2      EACH 75.00 150.00 150.00 300.00 182.80 365.60    
204-06 temporary silt fencing 320      LNFT 1.00 320.00 3.00 960.00 2.00 640.00    
302-01 class ii base course 78.8    CUYD 90.00 7,092.00 100.00 7,880.00 106.37 8,381.96    
401-02 aggregate surface course (adjusted vehicular
measurement)
12      CUYD 90.00 1,080.00 100.00 1,200.00 59.30 711.60    
502-01 superpave asphaltic concrete 60.6    TON 200.00 12,120.00 250.00 15,150.00 265.20 16,071.12    
705-01 barbed wire fence 100      LNFT 10.00 1,000.00 10.00 1,000.00 18.90 1,890.00    
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00 20,000.00 20,000.00 14,602.60 14,602.60    
716-01-A mulch (vegetative) 0.36   ACRE 3,000.00 1,080.00 2,000.00 720.00 3,000.00 1,080.00    
717-01 seeding 16      LB 50.00 800.00 30.00 480.00 6.00 96.00    
718-01 fertilizer 360      LB 1.00 360.00 1.00 360.00 0.50 180.00    
725-04 low profile runaround 1      EACH 35,000.00 35,000.00 10,000.00 10,000.00 33,489.80 33,489.80    
726-01 bedding material 176.4    CUYD 100.00 17,640.00 75.00 13,230.00 113.10 19,950.84    
727-01 mobilization lump      LUMP 15,000.00 15,000.00 35,000.00 35,000.00 10,000.00 10,000.00    
729-16-B object marker assembly (type 2) 4      EACH 100.00 400.00 100.00 400.00 79.10 316.40    
740-01 construction layout lump      LUMP 7,000.00 7,000.00 5,000.00 5,000.00 3,551.70 3,551.70    
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 16,596.50 16,596.50    
805-01-B class a concrete (box culvert headwalls) 48.40   CUYD 900.00 43,560.00 1,200.00 58,080.00 1,110.30 53,738.52    
805-12-T reinforced concrete box culverts (9'x 8') 152.0    LNFT 950.00 144,400.00 850.00 129,200.00 917.90 139,520.80    
806-01 deformed reinforcing steel 3,733      LB 1.50 5,599.50 2.00 7,466.00 2.30 8,585.90    
                       
 CONTRACTOR TOTAL       338,171.50   349,636.00   355,785.04    