| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - CONSTRUCTING SOLUTIONS LLC |
- 3 - QUALITY DESIGN & CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
8,367.20 |
8,367.20 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 15+49.70, 20.6' w x 32.11' l
timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
9,981.60 |
9,981.60 |
|
|
| 202-02-I |
removal of cross drain pipe (24" rcp)
|
lump |
LUMP |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
1,969.70 |
1,969.70 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,500.00 |
15,500.00 |
15,000.00 |
15,000.00 |
5,506.80 |
5,506.80 |
|
|
| 204-02 |
temporary hay or straw bales
|
14   |
EACH |
5.00 |
70.00 |
15.00 |
210.00 |
13.60 |
190.40 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
EACH |
75.00 |
150.00 |
150.00 |
300.00 |
182.80 |
365.60 |
|
|
| 204-06 |
temporary silt fencing
|
320   |
LNFT |
1.00 |
320.00 |
3.00 |
960.00 |
2.00 |
640.00 |
|
|
| 302-01 |
class ii base course
|
78.8 |
CUYD |
90.00 |
7,092.00 |
100.00 |
7,880.00 |
106.37 |
8,381.96 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
12   |
CUYD |
90.00 |
1,080.00 |
100.00 |
1,200.00 |
59.30 |
711.60 |
|
|
| 502-01 |
superpave asphaltic concrete
|
60.6 |
TON |
200.00 |
12,120.00 |
250.00 |
15,150.00 |
265.20 |
16,071.12 |
|
|
| 705-01 |
barbed wire fence
|
100   |
LNFT |
10.00 |
1,000.00 |
10.00 |
1,000.00 |
18.90 |
1,890.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
14,602.60 |
14,602.60 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.36 |
ACRE |
3,000.00 |
1,080.00 |
2,000.00 |
720.00 |
3,000.00 |
1,080.00 |
|
|
| 717-01 |
seeding
|
16   |
LB |
50.00 |
800.00 |
30.00 |
480.00 |
6.00 |
96.00 |
|
|
| 718-01 |
fertilizer
|
360   |
LB |
1.00 |
360.00 |
1.00 |
360.00 |
0.50 |
180.00 |
|
|
| 725-04 |
low profile runaround
|
1   |
EACH |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
33,489.80 |
33,489.80 |
|
|
| 726-01 |
bedding material
|
176.4 |
CUYD |
100.00 |
17,640.00 |
75.00 |
13,230.00 |
113.10 |
19,950.84 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
79.10 |
316.40 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
3,551.70 |
3,551.70 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
16,596.50 |
16,596.50 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
48.40 |
CUYD |
900.00 |
43,560.00 |
1,200.00 |
58,080.00 |
1,110.30 |
53,738.52 |
|
|
| 805-12-T |
reinforced concrete box culverts (9'x 8')
|
152.0 |
LNFT |
950.00 |
144,400.00 |
850.00 |
129,200.00 |
917.90 |
139,520.80 |
|
|
| 806-01 |
deformed reinforcing steel
|
3,733   |
LB |
1.50 |
5,599.50 |
2.00 |
7,466.00 |
2.30 |
8,585.90 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
338,171.50 |
|
349,636.00 |
|
355,785.04 |
|
|
|