| REBID |
|
| |
| Lead Project: 450-13-0042 |
| Parish: ST JOHN |
| Routes: I-10 |
| Description: LAPLACE PIT SCALE MAINLINE SORTNG SYSTEM |
Type Const:
grading, cold planing asphaltic pavement, pavement patching, superpave asphaltic
concrete pavement, mainline sorting system, pccp resurfacing, and related work. |
| Estimated Construction Cost: $2,288,020.52 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - TOOMER ELECTRICAL CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
36,672.00 |
36,672.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
24,000.00 |
24,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
ea |
25.00 |
1,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
6.00 |
6,000.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
7.0 |
CUYD |
160.00 |
1,120.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
108.4 |
TON |
275.00 |
29,810.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,534   |
SQYD |
7.70 |
19,511.80 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 341   |
CUYD |
10.00 |
- 3,410.00 |
|
|
|
|
|
|
| 602-07 |
patching continuously reinforced concrete pavement
|
90.0 |
SQYD |
605.00 |
54,450.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
52,000.00 |
52,000.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.654 |
MILE |
880.00 |
1,455.52 |
|
|
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
100   |
EACH |
23.00 |
2,300.00 |
|
|
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
122   |
EACH |
425.00 |
51,850.00 |
|
|
|
|
|
|
| 725-02 |
temporary detour roads
|
8,500.0 |
SQYD |
71.00 |
603,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
288,000.00 |
288,000.00 |
|
|
|
|
|
|
| 729-04 |
sign (type d)
|
1,298.0 |
SQFT |
21.00 |
27,258.00 |
|
|
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
14   |
EACH |
880.00 |
12,320.00 |
|
|
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
18   |
EACH |
1,235.00 |
22,230.00 |
|
|
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
2   |
EACH |
8,250.00 |
16,500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
110   |
EACH |
6.00 |
660.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.083 |
MILE |
2,740.00 |
8,447.42 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
23,568.00 |
23,568.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
48,672.00 |
48,672.00 |
|
|
|
|
|
|
| S-001 |
mainline sorting system
|
lump |
LUMP |
1,385,268.00 |
1,385,268.00 |
|
|
|
|
|
|
| S-002 |
p.c.c.p resurfacing (6 1/2" thick)
|
272.6 |
CUYD |
660.00 |
179,916.00 |
|
|
|
|
|
|
| S-003 |
saw cut p.c.c pavement (full depth)
|
160   |
LNFT |
11.00 |
1,760.00 |
|
|
|
|
|
|
| S-004 |
rumble strips (ground-in)
|
0.2 |
MILE |
17,880.00 |
3,576.00 |
|
|
|
|
|
|
| S-005 |
dynamic message sign unit
|
5   |
EACH |
8,250.00 |
41,250.00 |
|
|
|
|
|
|
| S-006 |
extended maintenance
|
lump |
LUMP |
28,512.00 |
28,512.00 |
|
|
|
|
|
|
| S-007 |
sawcuts in asphaltic concrete (6.5" depth)
|
100   |
LNFT |
7.00 |
700.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,968,896.74 |
|
|
|
|
|
|
|