| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - AUSTIN BRIDGE & ROAD, LP |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
500,000.00 |
500,000.00 |
100,000.00 |
100,000.00 |
42,210.00 |
42,210.00 |
125,000.00 |
125,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
29,450.00 |
29,450.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 203+33.70, 28' x 1022'
concrete prestressed girder bridge) |
1   |
EACH |
135,000.00 |
135,000.00 |
250,000.00 |
250,000.00 |
124,620.00 |
124,620.00 |
250,000.00 |
250,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 203+68.83, 28' x 1022'
concrete prestressed girder bridge) |
1   |
EACH |
135,000.00 |
135,000.00 |
250,000.00 |
250,000.00 |
124,620.00 |
124,620.00 |
250,000.00 |
250,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
22,783   |
SQYD |
5.00 |
113,915.00 |
3.80 |
86,575.40 |
4.50 |
102,523.50 |
10.00 |
227,830.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,408.7 |
SQYD |
10.00 |
24,087.00 |
4.00 |
9,634.80 |
3.65 |
8,791.76 |
4.00 |
9,634.80 |
| 202-02-H |
removal of guard rail
|
974   |
LNFT |
5.00 |
4,870.00 |
9.00 |
8,766.00 |
5.00 |
4,870.00 |
5.50 |
5,357.00 |
| 202-02-I |
removal of sign (sta. 200+00.00, 12' x 40'lighted
metal billboard on a 42" x 60' steel post) |
1   |
EACH |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
3,628.00 |
3,628.00 |
30,000.00 |
30,000.00 |
| 203-01 |
general excavation
|
144,934   |
CUYD |
3.00 |
434,802.00 |
3.35 |
485,528.90 |
4.58 |
663,797.72 |
6.50 |
942,071.00 |
| 203-04 |
embankment
|
57,022   |
CUYD |
12.50 |
712,775.00 |
10.25 |
584,475.50 |
8.90 |
507,495.80 |
15.00 |
855,330.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
35   |
EACH |
85.00 |
2,975.00 |
130.00 |
4,550.00 |
152.00 |
5,320.00 |
130.00 |
4,550.00 |
| 204-06 |
temporary silt fencing
|
17,547   |
LNFT |
2.25 |
39,480.75 |
1.85 |
32,461.95 |
1.75 |
30,707.25 |
1.50 |
26,320.50 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
5,800.00 |
11,600.00 |
3,900.00 |
7,800.00 |
10,227.00 |
20,454.00 |
10,000.00 |
20,000.00 |
| 301-02-E |
class i base course (8" thick)
|
64,347.8 |
SQYD |
13.00 |
836,521.40 |
16.50 |
1,061,738.70 |
15.90 |
1,023,130.02 |
18.50 |
1,190,434.30 |
| 302-02-D |
class ii base course (12" thick)
|
48,206.9 |
SQYD |
25.00 |
1,205,172.50 |
24.00 |
1,156,965.60 |
22.20 |
1,070,193.18 |
29.00 |
1,398,000.10 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
11,237   |
SQYD |
11.00 |
123,607.00 |
5.50 |
61,803.50 |
8.47 |
95,177.39 |
9.00 |
101,133.00 |
| 304-01 |
lime
|
561.73 |
TON |
130.00 |
73,024.90 |
140.00 |
78,642.20 |
148.00 |
83,136.04 |
150.00 |
84,259.50 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
39,628   |
SQYD |
1.35 |
53,497.80 |
1.30 |
51,516.40 |
1.00 |
39,628.00 |
3.00 |
118,884.00 |
| 305-01 |
subgrade layer (10" thick)
|
112,555   |
SQYD |
6.00 |
675,330.00 |
7.00 |
787,885.00 |
6.95 |
782,257.25 |
8.50 |
956,717.50 |
| 401-01 |
aggregate surface course (net section)
|
163.0 |
CUYD |
100.00 |
16,300.00 |
60.00 |
9,780.00 |
81.00 |
13,203.00 |
80.00 |
13,040.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
225.0 |
CUYD |
70.00 |
15,750.00 |
35.00 |
7,875.00 |
71.00 |
15,975.00 |
65.00 |
14,625.00 |
| 502-01 |
superpave asphaltic concrete
|
16,360.8 |
TON |
70.00 |
1,145,256.00 |
93.50 |
1,529,734.80 |
81.00 |
1,325,224.80 |
90.00 |
1,472,472.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
123.4 |
TON |
100.00 |
12,340.00 |
170.00 |
20,978.00 |
125.00 |
15,425.00 |
135.00 |
16,659.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
55,892.0 |
SQYD |
55.00 |
3,074,060.00 |
60.00 |
3,353,520.00 |
48.00 |
2,682,816.00 |
80.00 |
4,471,360.00 |
| 601-04 |
portland cement concrete pavement coring
|
70   |
EACH |
100.00 |
7,000.00 |
140.00 |
9,800.00 |
100.00 |
7,000.00 |
300.00 |
21,000.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
1,436   |
LNFT |
90.00 |
129,240.00 |
125.00 |
179,500.00 |
69.00 |
99,084.00 |
135.00 |
193,860.00 |
| 701-05-I |
side drain pipe (24")
|
80   |
LNFT |
75.00 |
6,000.00 |
80.00 |
6,400.00 |
50.00 |
4,000.00 |
100.00 |
8,000.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
925.00 |
1,850.00 |
1,050.00 |
2,100.00 |
1,000.00 |
2,000.00 |
| 702-02-C |
manholes (r-cb-11 mod)
|
4   |
EACH |
4,500.00 |
18,000.00 |
4,600.00 |
18,400.00 |
5,120.00 |
20,480.00 |
6,000.00 |
24,000.00 |
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,500.00 |
7,000.00 |
1,700.00 |
3,400.00 |
3,250.00 |
6,500.00 |
3,000.00 |
6,000.00 |
| 703-01 |
shoulder underdrain systems
|
10,620   |
LNFT |
7.00 |
74,340.00 |
8.25 |
87,615.00 |
15.00 |
159,300.00 |
14.00 |
148,680.00 |
| 703-02 |
shoulder outlet underdrains
|
36   |
EACH |
400.00 |
14,400.00 |
370.00 |
13,320.00 |
200.00 |
7,200.00 |
550.00 |
19,800.00 |
| 704-03 |
blocked out guard rail
|
675.0 |
LNFT |
18.50 |
12,487.50 |
22.00 |
14,850.00 |
19.50 |
13,162.50 |
20.00 |
13,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
55.00 |
5,500.00 |
50.00 |
5,000.00 |
55.00 |
5,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,850.00 |
7,400.00 |
2,100.00 |
8,400.00 |
1,850.00 |
7,400.00 |
2,000.00 |
8,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
249.9 |
SQYD |
59.00 |
14,744.10 |
60.00 |
14,994.00 |
80.34 |
20,076.97 |
65.00 |
16,243.50 |
| 708-01 |
right-of-way monument
|
7   |
EACH |
150.00 |
1,050.00 |
400.00 |
2,800.00 |
500.00 |
3,500.00 |
60.00 |
420.00 |
| 708-02 |
right-of-way monument witness post
|
7   |
EACH |
75.00 |
525.00 |
400.00 |
2,800.00 |
200.00 |
1,400.00 |
60.00 |
420.00 |
| 712-04 |
flexible revetment
|
717   |
SQYD |
60.00 |
43,020.00 |
68.00 |
48,756.00 |
60.00 |
43,020.00 |
65.00 |
46,605.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
175,000.00 |
175,000.00 |
90,000.00 |
90,000.00 |
14,900.00 |
14,900.00 |
200,000.00 |
200,000.00 |
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
0.261 |
MILE |
5,000.00 |
1,305.00 |
22,000.00 |
5,742.00 |
10,964.52 |
2,861.74 |
2,200.00 |
574.20 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
8.947 |
MILE |
735.00 |
6,576.05 |
840.00 |
7,515.48 |
764.01 |
6,835.60 |
800.00 |
7,157.60 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
0.428 |
MILE |
14,500.00 |
6,206.00 |
15,500.00 |
6,634.00 |
15,204.91 |
6,507.70 |
15,000.00 |
6,420.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
394   |
EACH |
5.00 |
1,970.00 |
5.50 |
2,167.00 |
5.11 |
2,013.34 |
5.00 |
1,970.00 |
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
165   |
EACH |
760.00 |
125,400.00 |
850.00 |
140,250.00 |
911.00 |
150,315.00 |
2,000.00 |
330,000.00 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
516   |
EACH |
250.00 |
129,000.00 |
230.00 |
118,680.00 |
185.00 |
95,460.00 |
400.00 |
206,400.00 |
| 717-01 |
seeding
|
1,775   |
LB |
8.00 |
14,200.00 |
8.50 |
15,087.50 |
4.95 |
8,786.25 |
9.00 |
15,975.00 |
| 718-01 |
fertilizer
|
71,000   |
LB |
0.25 |
17,750.00 |
0.28 |
19,880.00 |
0.50 |
35,500.00 |
0.30 |
21,300.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
1,782   |
SQYD |
1.25 |
2,227.50 |
1.40 |
2,494.80 |
1.05 |
1,871.10 |
1.30 |
2,316.60 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
346   |
SQYD |
3.25 |
1,124.50 |
3.75 |
1,297.50 |
1.40 |
484.40 |
3.50 |
1,211.00 |
| 725-02 |
temporary detour roads
|
8,436.4 |
SQYD |
75.00 |
632,730.00 |
92.00 |
776,148.80 |
73.55 |
620,497.22 |
125.00 |
1,054,550.00 |
| 726-01 |
bedding material
|
165.8 |
CUYD |
50.00 |
8,290.00 |
80.00 |
13,264.00 |
68.00 |
11,274.40 |
90.00 |
14,922.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,100,000.00 |
2,100,000.00 |
2,150,000.00 |
2,150,000.00 |
1,150,000.00 |
1,150,000.00 |
2,800,000.00 |
2,800,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
32   |
EACH |
55.00 |
1,760.00 |
60.00 |
1,920.00 |
55.00 |
1,760.00 |
60.00 |
1,920.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
75.00 |
300.00 |
70.00 |
280.00 |
80.00 |
320.00 |
| 729-19-A |
dead end road installations(type a)
|
2   |
EACH |
1,500.00 |
3,000.00 |
2,800.00 |
5,600.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
836   |
EACH |
12.50 |
10,450.00 |
13.50 |
11,286.00 |
13.03 |
10,893.08 |
14.00 |
11,704.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,989   |
EACH |
5.50 |
10,939.50 |
5.50 |
10,939.50 |
5.42 |
10,780.38 |
6.00 |
11,934.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
4,348   |
LNFT |
1.00 |
4,348.00 |
0.98 |
4,261.04 |
0.94 |
4,087.12 |
1.00 |
4,348.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,019   |
LNFT |
3.00 |
3,057.00 |
2.90 |
2,955.10 |
2.81 |
2,863.39 |
3.00 |
3,057.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.869 |
MILE |
2,150.00 |
25,518.35 |
2,300.00 |
27,298.70 |
2,240.94 |
26,597.72 |
2,400.00 |
28,485.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.860 |
MILE |
800.00 |
2,288.00 |
850.00 |
2,431.00 |
812.99 |
2,325.15 |
850.00 |
2,431.00 |
| 732-03-A-01 |
plastic pavement striping (broken line)(4" width)
(preformed marking tape type v) |
2.768 |
MILE |
3,625.00 |
10,034.00 |
4,000.00 |
11,072.00 |
3,783.55 |
10,472.87 |
4,000.00 |
11,072.00 |
| 735-01 |
mailboxes
|
7   |
EACH |
10.00 |
70.00 |
11.00 |
77.00 |
10.00 |
70.00 |
11.00 |
77.00 |
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
125.00 |
625.00 |
145.00 |
725.00 |
125.00 |
625.00 |
140.00 |
700.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
225.00 |
225.00 |
250.00 |
250.00 |
225.00 |
225.00 |
250.00 |
250.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
300,000.00 |
300,000.00 |
180,000.00 |
180,000.00 |
200,000.00 |
200,000.00 |
500,000.00 |
500,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
150,000.00 |
150,000.00 |
| 802-02 |
structural excavation for intermediate bents
|
3,460.7 |
CUYD |
15.00 |
51,910.50 |
18.00 |
62,292.60 |
24.00 |
83,056.80 |
40.00 |
138,428.00 |
| 804-01-B |
precast concrete piles (14")
|
37,584   |
LNFT |
28.00 |
1,052,352.00 |
20.00 |
751,680.00 |
56.00 |
2,104,704.00 |
35.00 |
1,315,440.00 |
| 804-01-D |
precast concrete piles (18")
|
1,944   |
LNFT |
40.00 |
77,760.00 |
39.00 |
75,816.00 |
85.00 |
165,240.00 |
51.00 |
99,144.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
4,500.00 |
4,500.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
17,000.00 |
17,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
14,000.00 |
14,000.00 |
500.00 |
500.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
4,000.00 |
4,000.00 |
750.00 |
750.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
100.00 |
100.00 |
45,000.00 |
45,000.00 |
6,000.00 |
6,000.00 |
| 804-13 |
precast concrete indicator piles
|
3   |
EACH |
5,500.00 |
16,500.00 |
10,000.00 |
30,000.00 |
6,000.00 |
18,000.00 |
6,600.00 |
19,800.00 |
| 804-17 |
dynamic monitoring
|
12   |
EACH |
1,200.00 |
14,400.00 |
2,000.00 |
24,000.00 |
900.00 |
10,800.00 |
1,500.00 |
18,000.00 |
| 805-01-D |
class a concrete (footings)
|
1,532.52 |
CUYD |
225.00 |
344,817.00 |
315.00 |
482,743.80 |
350.00 |
536,382.00 |
600.00 |
919,512.00 |
| 805-01-F |
class a concrete (bents)
|
2,243.88 |
CUYD |
450.00 |
1,009,746.00 |
410.00 |
919,990.80 |
500.00 |
1,121,940.00 |
850.00 |
1,907,298.00 |
| 805-03 |
class aa concrete
|
4,102.26 |
CUYD |
475.00 |
1,948,573.50 |
480.00 |
1,969,084.80 |
725.00 |
2,974,138.50 |
950.00 |
3,897,147.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
14,295.4 |
LNFT |
95.00 |
1,358,063.00 |
90.00 |
1,286,586.00 |
135.00 |
1,929,879.00 |
175.00 |
2,501,695.00 |
| 805-08-I |
precast-prestressed concrete girders (type iv modified)
|
4,563.5 |
LNFT |
150.00 |
684,525.00 |
160.00 |
730,160.00 |
220.00 |
1,003,970.00 |
300.00 |
1,369,050.00 |
| 805-11 |
strip seal joints
|
640.00 |
LNFT |
100.00 |
64,000.00 |
135.00 |
86,400.00 |
180.00 |
115,200.00 |
200.00 |
128,000.00 |
| 806-01 |
deformed reinforcing steel
|
1,757,265   |
LB |
0.77 |
1,353,094.05 |
0.75 |
1,317,948.75 |
1.00 |
1,757,265.00 |
1.20 |
2,108,718.00 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
23,500.00 |
23,500.00 |
20,000.00 |
20,000.00 |
| 810-01 |
concrete railing (barrier)
|
7,289.16 |
LNFT |
38.00 |
276,988.08 |
40.00 |
291,566.40 |
40.00 |
291,566.40 |
60.00 |
437,349.60 |
| 813-01 |
concrete approach slabs
|
729.84 |
SQYD |
175.00 |
127,722.00 |
180.00 |
131,371.20 |
280.00 |
204,355.20 |
300.00 |
218,952.00 |
| 814-01-J |
drilled shaft (66")
|
219.0 |
LNFT |
750.00 |
164,250.00 |
750.00 |
164,250.00 |
750.00 |
164,250.00 |
700.00 |
153,300.00 |
| 814-02-J |
test hole (66")
|
75.0 |
LNFT |
800.00 |
60,000.00 |
1,150.00 |
86,250.00 |
590.00 |
44,250.00 |
1,200.00 |
90,000.00 |
| 814-04-J |
crosshole sonic logging (66")
|
3   |
EACH |
5,500.00 |
16,500.00 |
3,300.00 |
9,900.00 |
500.00 |
1,500.00 |
3,200.00 |
9,600.00 |
| S-001 |
paved embankment widening (asphalt or concrete)
|
2,392   |
SQYD |
38.00 |
90,896.00 |
55.00 |
131,560.00 |
38.00 |
90,896.00 |
45.00 |
107,640.00 |
| S-002 |
surface preparation
|
lump |
LUMP |
50,000.00 |
50,000.00 |
29,000.00 |
29,000.00 |
49,085.00 |
49,085.00 |
55,000.00 |
55,000.00 |
| S-003 |
impact attenuators (construction zone)
|
16   |
EACH |
22,000.00 |
352,000.00 |
17,100.00 |
273,600.00 |
20,000.00 |
320,000.00 |
20,000.00 |
320,000.00 |
| S-004 |
french drain
|
3,600   |
LNFT |
6.25 |
22,500.00 |
6.25 |
22,500.00 |
20.00 |
72,000.00 |
11.00 |
39,600.00 |
| S-005 |
connection to french drain
|
12   |
EACH |
75.00 |
900.00 |
120.00 |
1,440.00 |
150.00 |
1,800.00 |
390.00 |
4,680.00 |
| S-006 |
connection to catch basin or manhole
|
3   |
EACH |
1,000.00 |
3,000.00 |
250.00 |
750.00 |
1,450.00 |
4,350.00 |
390.00 |
1,170.00 |
| S-007 |
sawcut portland cement concrete (10" thick)
|
96   |
LNFT |
12.50 |
1,200.00 |
16.00 |
1,536.00 |
8.00 |
768.00 |
16.00 |
1,536.00 |
| S-008 |
field office (equipped)
|
lump |
LUMP |
21,000.00 |
21,000.00 |
30,000.00 |
30,000.00 |
45,000.00 |
45,000.00 |
60,000.00 |
60,000.00 |
| S-009 |
cleaning existing ditches
|
5,000   |
LNFT |
5.00 |
25,000.00 |
3.75 |
18,750.00 |
4.00 |
20,000.00 |
9.00 |
45,000.00 |
| S-101 |
dynamic analysis
|
12   |
EACH |
1,000.00 |
12,000.00 |
1,500.00 |
18,000.00 |
1,000.00 |
12,000.00 |
1,000.00 |
12,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
22,608,641.98 |
|
23,030,869.52 |
|
24,953,059.54 |
|
34,549,610.80 |
|