Letting of 8/30/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 424-04-0034
Parish: IBERIA
Routes: US 90
Description: US 90 INTERCHANGE AT LA 675
Type Const: grading, drain struct, class i & ii bc, lime trmt, superpave acp, pccp,concrete
girder span bridge, and related work
Estimated Construction Cost: $24,541,987.82
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $22,608,641.98
2 12312 GILCHRIST CONSTRUCTION CO. LLC $23,030,869.52
3 42076 AUSTIN BRIDGE & ROAD, LP $24,953,059.54
4 02179 BOH BROS. CONSTRUCTION CO., LLC. $34,549,610.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
AUSTIN BRIDGE & ROAD, LP
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 500,000.00 500,000.00 100,000.00 100,000.00 42,210.00 42,210.00 125,000.00 125,000.00
202-01 removal of structures & obstructions lump      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 29,450.00 29,450.00 35,000.00 35,000.00
202-02-A-01 removal of bridge (sta. 203+33.70, 28' x 1022'
concrete prestressed girder bridge)
1      EACH 135,000.00 135,000.00 250,000.00 250,000.00 124,620.00 124,620.00 250,000.00 250,000.00
202-02-A-02 removal of bridge (sta. 203+68.83, 28' x 1022'
concrete prestressed girder bridge)
1      EACH 135,000.00 135,000.00 250,000.00 250,000.00 124,620.00 124,620.00 250,000.00 250,000.00
202-02-C removal of portland cement concrete pavement 22,783      SQYD 5.00 113,915.00 3.80 86,575.40 4.50 102,523.50 10.00 227,830.00
202-02-G removal of surfacing & stabilized base 2,408.7    SQYD 10.00 24,087.00 4.00 9,634.80 3.65 8,791.76 4.00 9,634.80
202-02-H removal of guard rail 974      LNFT 5.00 4,870.00 9.00 8,766.00 5.00 4,870.00 5.50 5,357.00
202-02-I removal of sign (sta. 200+00.00, 12' x 40'lighted
metal billboard on a 42" x 60' steel post)
1      EACH 5,000.00 5,000.00 6,500.00 6,500.00 3,628.00 3,628.00 30,000.00 30,000.00
203-01 general excavation 144,934      CUYD 3.00 434,802.00 3.35 485,528.90 4.58 663,797.72 6.50 942,071.00
203-04 embankment 57,022      CUYD 12.50 712,775.00 10.25 584,475.50 8.90 507,495.80 15.00 855,330.00
204-05-A temporary sediment check dams (hay) 35      EACH 85.00 2,975.00 130.00 4,550.00 152.00 5,320.00 130.00 4,550.00
204-06 temporary silt fencing 17,547      LNFT 2.25 39,480.75 1.85 32,461.95 1.75 30,707.25 1.50 26,320.50
204-07 temporary stone construction entrance 2      EACH 5,800.00 11,600.00 3,900.00 7,800.00 10,227.00 20,454.00 10,000.00 20,000.00
301-02-E class i base course (8" thick) 64,347.8    SQYD 13.00 836,521.40 16.50 1,061,738.70 15.90 1,023,130.02 18.50 1,190,434.30
302-02-D class ii base course (12" thick) 48,206.9    SQYD 25.00 1,205,172.50 24.00 1,156,965.60 22.20 1,070,193.18 29.00 1,398,000.10
303-01-B in-place cement stabilized base course (8 1/2" thick) 11,237      SQYD 11.00 123,607.00 5.50 61,803.50 8.47 95,177.39 9.00 101,133.00
304-01 lime 561.73   TON 130.00 73,024.90 140.00 78,642.20 148.00 83,136.04 150.00 84,259.50
304-04-D lime treatment (type d) (12" thick) 39,628      SQYD 1.35 53,497.80 1.30 51,516.40 1.00 39,628.00 3.00 118,884.00
305-01 subgrade layer (10" thick) 112,555      SQYD 6.00 675,330.00 7.00 787,885.00 6.95 782,257.25 8.50 956,717.50
401-01 aggregate surface course (net section) 163.0    CUYD 100.00 16,300.00 60.00 9,780.00 81.00 13,203.00 80.00 13,040.00
402-01 traffic maintenance aggregate (vehicular measurement) 225.0    CUYD 70.00 15,750.00 35.00 7,875.00 71.00 15,975.00 65.00 14,625.00
502-01 superpave asphaltic concrete 16,360.8    TON 70.00 1,145,256.00 93.50 1,529,734.80 81.00 1,325,224.80 90.00 1,472,472.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
123.4    TON 100.00 12,340.00 170.00 20,978.00 125.00 15,425.00 135.00 16,659.00
601-01-K portland cement concrete pavement (10" thick) 55,892.0    SQYD 55.00 3,074,060.00 60.00 3,353,520.00 48.00 2,682,816.00 80.00 4,471,360.00
601-04 portland cement concrete pavement coring 70      EACH 100.00 7,000.00 140.00 9,800.00 100.00 7,000.00 300.00 21,000.00
701-01-I cross drain pipe (24" rcp/pcp) 1,436      LNFT 90.00 129,240.00 125.00 179,500.00 69.00 99,084.00 135.00 193,860.00
701-05-I side drain pipe (24") 80      LNFT 75.00 6,000.00 80.00 6,400.00 50.00 4,000.00 100.00 8,000.00
701-15 concrete collar 2      EACH 1,000.00 2,000.00 925.00 1,850.00 1,050.00 2,100.00 1,000.00 2,000.00
702-02-C manholes (r-cb-11 mod) 4      EACH 4,500.00 18,000.00 4,600.00 18,400.00 5,120.00 20,480.00 6,000.00 24,000.00
702-03-A catch basins (cb-01) 2      EACH 3,500.00 7,000.00 1,700.00 3,400.00 3,250.00 6,500.00 3,000.00 6,000.00
703-01 shoulder underdrain systems 10,620      LNFT 7.00 74,340.00 8.25 87,615.00 15.00 159,300.00 14.00 148,680.00
703-02 shoulder outlet underdrains 36      EACH 400.00 14,400.00 370.00 13,320.00 200.00 7,200.00 550.00 19,800.00
704-03 blocked out guard rail 675.0    LNFT 18.50 12,487.50 22.00 14,850.00 19.50 13,162.50 20.00 13,500.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 50.00 5,000.00 55.00 5,500.00 50.00 5,000.00 55.00 5,500.00
704-11-A guard rail end treatment (flared) 4      EACH 1,850.00 7,400.00 2,100.00 8,400.00 1,850.00 7,400.00 2,000.00 8,000.00
706-02-C concrete drive (6" thick) 249.9    SQYD 59.00 14,744.10 60.00 14,994.00 80.34 20,076.97 65.00 16,243.50
708-01 right-of-way monument 7      EACH 150.00 1,050.00 400.00 2,800.00 500.00 3,500.00 60.00 420.00
708-02 right-of-way monument witness post 7      EACH 75.00 525.00 400.00 2,800.00 200.00 1,400.00 60.00 420.00
712-04 flexible revetment 717      SQYD 60.00 43,020.00 68.00 48,756.00 60.00 43,020.00 65.00 46,605.00
713-01 temporary signs & barricades lump      LUMP 175,000.00 175,000.00 90,000.00 90,000.00 14,900.00 14,900.00 200,000.00 200,000.00
713-04-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
0.261  MILE 5,000.00 1,305.00 22,000.00 5,742.00 10,964.52 2,861.74 2,200.00 574.20
713-05-A temporary pavement markings (solid line)(4" width) 8.947  MILE 735.00 6,576.05 840.00 7,515.48 764.01 6,835.60 800.00 7,157.60
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
0.428  MILE 14,500.00 6,206.00 15,500.00 6,634.00 15,204.91 6,507.70 15,000.00 6,420.00
713-07 temporary reflectorized raised pavement markers 394      EACH 5.00 1,970.00 5.50 2,167.00 5.11 2,013.34 5.00 1,970.00
713-08 temporary precast concrete barrier (contractor
furnished)
165      EACH 760.00 125,400.00 850.00 140,250.00 911.00 150,315.00 2,000.00 330,000.00
713-09 temporary precast concrete barrier (department
furnished)
516      EACH 250.00 129,000.00 230.00 118,680.00 185.00 95,460.00 400.00 206,400.00
717-01 seeding 1,775      LB 8.00 14,200.00 8.50 15,087.50 4.95 8,786.25 9.00 15,975.00
718-01 fertilizer 71,000      LB 0.25 17,750.00 0.28 19,880.00 0.50 35,500.00 0.30 21,300.00
720-01-A erosion control system, slope protection (type a) 1,782      SQYD 1.25 2,227.50 1.40 2,494.80 1.05 1,871.10 1.30 2,316.60
720-01-C erosion control system, flexible channel liner (type c) 346      SQYD 3.25 1,124.50 3.75 1,297.50 1.40 484.40 3.50 1,211.00
725-02 temporary detour roads 8,436.4    SQYD 75.00 632,730.00 92.00 776,148.80 73.55 620,497.22 125.00 1,054,550.00
726-01 bedding material 165.8    CUYD 50.00 8,290.00 80.00 13,264.00 68.00 11,274.40 90.00 14,922.00
727-01 mobilization lump      LUMP 2,100,000.00 2,100,000.00 2,150,000.00 2,150,000.00 1,150,000.00 1,150,000.00 2,800,000.00 2,800,000.00
729-16-B object marker assembly (type 2) 32      EACH 55.00 1,760.00 60.00 1,920.00 55.00 1,760.00 60.00 1,920.00
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00 75.00 300.00 70.00 280.00 80.00 320.00
729-19-A dead end road installations(type a) 2      EACH 1,500.00 3,000.00 2,800.00 5,600.00 500.00 1,000.00 500.00 1,000.00
731-01 nonreflectorized raised pavement markers 836      EACH 12.50 10,450.00 13.50 11,286.00 13.03 10,893.08 14.00 11,704.00
731-02 reflectorized raised pavement markers 1,989      EACH 5.50 10,939.50 5.50 10,939.50 5.42 10,780.38 6.00 11,934.00
732-01-C plastic pavement striping (8" width) 4,348      LNFT 1.00 4,348.00 0.98 4,261.04 0.94 4,087.12 1.00 4,348.00
732-01-E plastic pavement striping (24" width) 1,019      LNFT 3.00 3,057.00 2.90 2,955.10 2.81 2,863.39 3.00 3,057.00
732-02-A plastic pavement striping (solid line) (4" width) 11.869  MILE 2,150.00 25,518.35 2,300.00 27,298.70 2,240.94 26,597.72 2,400.00 28,485.60
732-03-A plastic pavement striping (broken line)(4" width) 2.860  MILE 800.00 2,288.00 850.00 2,431.00 812.99 2,325.15 850.00 2,431.00
732-03-A-01 plastic pavement striping (broken line)(4" width)
(preformed marking tape type v)
2.768  MILE 3,625.00 10,034.00 4,000.00 11,072.00 3,783.55 10,472.87 4,000.00 11,072.00
735-01 mailboxes 7      EACH 10.00 70.00 11.00 77.00 10.00 70.00 11.00 77.00
735-02 mailbox supports (single) 5      EACH 125.00 625.00 145.00 725.00 125.00 625.00 140.00 700.00
735-03 mailbox supports (double) 1      EACH 225.00 225.00 250.00 250.00 225.00 225.00 250.00 250.00
740-01 construction layout lump      LUMP 300,000.00 300,000.00 180,000.00 180,000.00 200,000.00 200,000.00 500,000.00 500,000.00
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 50,000.00 50,000.00 80,000.00 80,000.00 150,000.00 150,000.00
802-02 structural excavation for intermediate bents 3,460.7    CUYD 15.00 51,910.50 18.00 62,292.60 24.00 83,056.80 40.00 138,428.00
804-01-B precast concrete piles (14") 37,584      LNFT 28.00 1,052,352.00 20.00 751,680.00 56.00 2,104,704.00 35.00 1,315,440.00
804-01-D precast concrete piles (18") 1,944      LNFT 40.00 77,760.00 39.00 75,816.00 85.00 165,240.00 51.00 99,144.00
804-05 precast concrete test piles 1      EACH 35,000.00 35,000.00 10,000.00 10,000.00 6,000.00 6,000.00 4,500.00 4,500.00
804-09 loading test piles 1      EACH 20,000.00 20,000.00 20,000.00 20,000.00 45,000.00 45,000.00 17,000.00 17,000.00
804-10 reloading test piles 1      EACH 1,000.00 1,000.00 100.00 100.00 14,000.00 14,000.00 500.00 500.00
804-11 redriving test piles 1      EACH 1,000.00 1,000.00 100.00 100.00 4,000.00 4,000.00 750.00 750.00
804-12 loading permanent piles 1      EACH 5,000.00 5,000.00 100.00 100.00 45,000.00 45,000.00 6,000.00 6,000.00
804-13 precast concrete indicator piles 3      EACH 5,500.00 16,500.00 10,000.00 30,000.00 6,000.00 18,000.00 6,600.00 19,800.00
804-17 dynamic monitoring 12      EACH 1,200.00 14,400.00 2,000.00 24,000.00 900.00 10,800.00 1,500.00 18,000.00
805-01-D class a concrete (footings) 1,532.52   CUYD 225.00 344,817.00 315.00 482,743.80 350.00 536,382.00 600.00 919,512.00
805-01-F class a concrete (bents) 2,243.88   CUYD 450.00 1,009,746.00 410.00 919,990.80 500.00 1,121,940.00 850.00 1,907,298.00
805-03 class aa concrete 4,102.26   CUYD 475.00 1,948,573.50 480.00 1,969,084.80 725.00 2,974,138.50 950.00 3,897,147.00
805-08-C precast-prestressed concrete girders (type iii) 14,295.4    LNFT 95.00 1,358,063.00 90.00 1,286,586.00 135.00 1,929,879.00 175.00 2,501,695.00
805-08-I precast-prestressed concrete girders (type iv modified) 4,563.5    LNFT 150.00 684,525.00 160.00 730,160.00 220.00 1,003,970.00 300.00 1,369,050.00
805-11 strip seal joints 640.00   LNFT 100.00 64,000.00 135.00 86,400.00 180.00 115,200.00 200.00 128,000.00
806-01 deformed reinforcing steel 1,757,265      LB 0.77 1,353,094.05 0.75 1,317,948.75 1.00 1,757,265.00 1.20 2,108,718.00
807-06 structural metalwork lump      LUMP 20,000.00 20,000.00 10,000.00 10,000.00 23,500.00 23,500.00 20,000.00 20,000.00
810-01 concrete railing (barrier) 7,289.16   LNFT 38.00 276,988.08 40.00 291,566.40 40.00 291,566.40 60.00 437,349.60
813-01 concrete approach slabs 729.84   SQYD 175.00 127,722.00 180.00 131,371.20 280.00 204,355.20 300.00 218,952.00
814-01-J drilled shaft (66") 219.0    LNFT 750.00 164,250.00 750.00 164,250.00 750.00 164,250.00 700.00 153,300.00
814-02-J test hole (66") 75.0    LNFT 800.00 60,000.00 1,150.00 86,250.00 590.00 44,250.00 1,200.00 90,000.00
814-04-J crosshole sonic logging (66") 3      EACH 5,500.00 16,500.00 3,300.00 9,900.00 500.00 1,500.00 3,200.00 9,600.00
S-001 paved embankment widening (asphalt or concrete) 2,392      SQYD 38.00 90,896.00 55.00 131,560.00 38.00 90,896.00 45.00 107,640.00
S-002 surface preparation lump      LUMP 50,000.00 50,000.00 29,000.00 29,000.00 49,085.00 49,085.00 55,000.00 55,000.00
S-003 impact attenuators (construction zone) 16      EACH 22,000.00 352,000.00 17,100.00 273,600.00 20,000.00 320,000.00 20,000.00 320,000.00
S-004 french drain 3,600      LNFT 6.25 22,500.00 6.25 22,500.00 20.00 72,000.00 11.00 39,600.00
S-005 connection to french drain 12      EACH 75.00 900.00 120.00 1,440.00 150.00 1,800.00 390.00 4,680.00
S-006 connection to catch basin or manhole 3      EACH 1,000.00 3,000.00 250.00 750.00 1,450.00 4,350.00 390.00 1,170.00
S-007 sawcut portland cement concrete (10" thick) 96      LNFT 12.50 1,200.00 16.00 1,536.00 8.00 768.00 16.00 1,536.00
S-008 field office (equipped) lump      LUMP 21,000.00 21,000.00 30,000.00 30,000.00 45,000.00 45,000.00 60,000.00 60,000.00
S-009 cleaning existing ditches 5,000      LNFT 5.00 25,000.00 3.75 18,750.00 4.00 20,000.00 9.00 45,000.00
S-101 dynamic analysis 12      EACH 1,000.00 12,000.00 1,500.00 18,000.00 1,000.00 12,000.00 1,000.00 12,000.00
                       
 CONTRACTOR TOTAL       22,608,641.98   23,030,869.52   24,953,059.54   34,549,610.80