| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - M. MATT DURAND, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
85   |
SQYD |
11.00 |
935.00 |
10.00 |
850.00 |
10.00 |
850.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
44,788.0 |
SQYD |
3.35 |
150,039.80 |
3.00 |
134,364.00 |
3.00 |
134,364.00 |
|
|
| 202-02-H |
removal of guard rail
|
366   |
LNFT |
4.50 |
1,647.00 |
11.00 |
4,026.00 |
20.00 |
7,320.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,716   |
CUYD |
13.50 |
23,166.00 |
14.00 |
24,024.00 |
10.00 |
17,160.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
283   |
CUYD |
14.00 |
3,962.00 |
18.00 |
5,094.00 |
12.00 |
3,396.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
95.00 |
760.00 |
185.00 |
1,480.00 |
40.00 |
320.00 |
|
|
| 302-02-E |
class ii base course (4" thick)
|
48,104.4 |
SQYD |
7.25 |
348,756.90 |
9.50 |
456,991.80 |
9.70 |
466,612.68 |
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
47,925   |
SQYD |
6.20 |
297,135.00 |
6.75 |
323,493.75 |
6.60 |
316,305.00 |
|
|
| 303-02 |
removal of existing patches
|
850   |
SQYD |
5.00 |
4,250.00 |
12.50 |
10,625.00 |
10.00 |
8,500.00 |
|
|
| 304-01 |
lime
|
983.27 |
TON |
143.51 |
141,109.08 |
10.00 |
9,832.70 |
126.30 |
124,187.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
6,243   |
SQYD |
2.05 |
12,798.15 |
4.50 |
28,093.50 |
2.00 |
12,486.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,624   |
CUYD |
36.00 |
94,464.00 |
22.50 |
59,040.00 |
80.00 |
209,920.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
105.9 |
CUYD |
28.00 |
2,965.20 |
83.00 |
8,789.70 |
65.00 |
6,883.50 |
|
|
| 502-01 |
superpave asphaltic concrete
|
8,676.3 |
TON |
74.00 |
642,046.20 |
81.00 |
702,780.30 |
89.40 |
775,661.22 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,247.3 |
TON |
85.00 |
106,020.50 |
145.00 |
180,858.50 |
95.00 |
118,493.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,372   |
SQYD |
5.00 |
6,860.00 |
4.00 |
5,488.00 |
3.00 |
4,116.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 100   |
CUYD |
0.01 |
- 1.00 |
0.01 |
- 1.00 |
3.00 |
- 300.00 |
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
50   |
LNFT |
156.00 |
7,800.00 |
115.00 |
5,750.00 |
50.00 |
2,500.00 |
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
50   |
LNFT |
194.00 |
9,700.00 |
122.00 |
6,100.00 |
84.00 |
4,200.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
33.25 |
2,493.75 |
34.00 |
2,550.00 |
42.00 |
3,150.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
37.6 |
LNFT |
52.65 |
1,979.64 |
54.00 |
2,030.40 |
65.00 |
2,444.00 |
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
18.90 |
945.00 |
19.00 |
950.00 |
35.00 |
1,750.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
5   |
EACH |
2,050.00 |
10,250.00 |
2,100.00 |
10,500.00 |
2,650.00 |
13,250.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
85.0 |
SQYD |
67.00 |
5,695.00 |
68.00 |
5,780.00 |
50.00 |
4,250.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
49,000.00 |
49,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
114   |
LNFT |
1.80 |
205.20 |
1.00 |
114.00 |
1.85 |
210.90 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.020 |
MILE |
332.57 |
2,334.64 |
1.00 |
7.02 |
360.25 |
2,528.96 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.948 |
MILE |
349.91 |
2,431.17 |
1.00 |
6.95 |
360.25 |
2,503.02 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.405 |
MILE |
701.49 |
10,104.96 |
1.00 |
14.41 |
722.00 |
10,400.41 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
462   |
EACH |
5.65 |
2,610.30 |
0.40 |
184.80 |
5.85 |
2,702.70 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
25,000.00 |
25,000.00 |
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
158   |
SQYD |
87.50 |
13,825.00 |
115.00 |
18,170.00 |
110.00 |
17,380.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
56,000.00 |
56,000.00 |
230,000.00 |
230,000.00 |
70,000.00 |
70,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
3   |
EACH |
66.50 |
199.50 |
68.00 |
204.00 |
205.00 |
615.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
78.00 |
624.00 |
80.00 |
640.00 |
230.00 |
1,840.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
470   |
EACH |
5.76 |
2,707.20 |
5.50 |
2,585.00 |
6.50 |
3,055.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
57   |
LNFT |
3.89 |
221.73 |
3.40 |
193.80 |
4.40 |
250.80 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.203 |
MILE |
2,366.00 |
17,042.30 |
2,400.00 |
17,287.20 |
2,660.00 |
19,159.98 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.474 |
MILE |
769.00 |
2,671.51 |
800.00 |
2,779.20 |
865.00 |
3,005.01 |
|
|
| 735-01 |
mailboxes
|
33   |
EACH |
12.00 |
396.00 |
20.00 |
660.00 |
88.50 |
2,920.50 |
|
|
| 735-02 |
mailbox supports (single)
|
32   |
EACH |
142.00 |
4,544.00 |
175.00 |
5,600.00 |
290.00 |
9,280.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
194.00 |
194.00 |
285.00 |
285.00 |
365.00 |
365.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,850.00 |
5,850.00 |
19,000.00 |
19,000.00 |
28,000.00 |
28,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,250.00 |
15,250.00 |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
|
|
| S-001 |
full depth sawcutting of existing portland cement
concrete drives |
306   |
INFT |
2.77 |
847.62 |
8.25 |
2,524.50 |
15.00 |
4,590.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,089,336.35 |
|
2,406,746.53 |
|
2,545,626.18 |
|
|
|