Letting of 8/30/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 393-02-0005
Parish: VERMILION, LAFAYETTE
Routes: LA 343
Description: LA 92 - LA 342
Type Const: grading, drain struct, cold planing asp pvmt, lime trmt, class ii bc, in-place cement
stabilized bc, superpave acp, and related work.
Estimated Construction Cost: $2,489,205.74
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $2,089,336.35
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,406,746.53
3 13086 M. MATT DURAND, LLC $2,545,626.18
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
M. MATT DURAND, LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 35,000.00 35,000.00 30,000.00 30,000.00 25,000.00 25,000.00    
202-02-D removal of concrete walks & drives 85      SQYD 11.00 935.00 10.00 850.00 10.00 850.00    
202-02-G removal of surfacing & stabilized base 44,788.0    SQYD 3.35 150,039.80 3.00 134,364.00 3.00 134,364.00    
202-02-H removal of guard rail 366      LNFT 4.50 1,647.00 11.00 4,026.00 20.00 7,320.00    
203-08 borrow (vehicular measurement) 1,716      CUYD 13.50 23,166.00 14.00 24,024.00 10.00 17,160.00    
203-08-A borrow (vehicular meas.)(selected soils) 283      CUYD 14.00 3,962.00 18.00 5,094.00 12.00 3,396.00    
204-05-A temporary sediment check dams (hay) 8      EACH 95.00 760.00 185.00 1,480.00 40.00 320.00    
302-02-E class ii base course (4" thick) 48,104.4    SQYD 7.25 348,756.90 9.50 456,991.80 9.70 466,612.68    
303-01-B in-place cement stabilized base course (8 1/2" thick) 47,925      SQYD 6.20 297,135.00 6.75 323,493.75 6.60 316,305.00    
303-02 removal of existing patches 850      SQYD 5.00 4,250.00 12.50 10,625.00 10.00 8,500.00    
304-01 lime 983.27   TON 143.51 141,109.08 10.00 9,832.70 126.30 124,187.00    
304-04-D lime treatment (type d) (12" thick) 6,243      SQYD 2.05 12,798.15 4.50 28,093.50 2.00 12,486.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,624      CUYD 36.00 94,464.00 22.50 59,040.00 80.00 209,920.00    
402-01 traffic maintenance aggregate (vehicular measurement) 105.9    CUYD 28.00 2,965.20 83.00 8,789.70 65.00 6,883.50    
502-01 superpave asphaltic concrete 8,676.3    TON 74.00 642,046.20 81.00 702,780.30 89.40 775,661.22    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,247.3    TON 85.00 106,020.50 145.00 180,858.50 95.00 118,493.50    
509-01 cold planing asphaltic pavement 1,372      SQYD 5.00 6,860.00 4.00 5,488.00 3.00 4,116.00    
509-02 contractor retained reclaimed asphaltic pavement - 100      CUYD 0.01 - 1.00 0.01 - 1.00 3.00 - 300.00    
701-01-G cross drain pipe (18" rcp/pcp) 50      LNFT 156.00 7,800.00 115.00 5,750.00 50.00 2,500.00    
701-02-D cross drain pipe arch (24" equiv. rcpa) 50      LNFT 194.00 9,700.00 122.00 6,100.00 84.00 4,200.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 75.0    LNFT 33.25 2,493.75 34.00 2,550.00 42.00 3,150.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 37.6    LNFT 52.65 1,979.64 54.00 2,030.40 65.00 2,444.00    
704-03 blocked out guard rail 50.0    LNFT 18.90 945.00 19.00 950.00 35.00 1,750.00    
704-11-A guard rail end treatment (flared) 5      EACH 2,050.00 10,250.00 2,100.00 10,500.00 2,650.00 13,250.00    
706-02-C concrete drive (6" thick) 85.0    SQYD 67.00 5,695.00 68.00 5,780.00 50.00 4,250.00    
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 20,000.00 20,000.00 49,000.00 49,000.00    
713-03-E temporary pavement markings (24" width) 114      LNFT 1.80 205.20 1.00 114.00 1.85 210.90    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.020  MILE 332.57 2,334.64 1.00 7.02 360.25 2,528.96    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.948  MILE 349.91 2,431.17 1.00 6.95 360.25 2,503.02    
713-05-A temporary pavement markings (solid line)(4" width) 14.405  MILE 701.49 10,104.96 1.00 14.41 722.00 10,400.41    
713-07 temporary reflectorized raised pavement markers 462      EACH 5.65 2,610.30 0.40 184.80 5.85 2,702.70    
722-02 project site laboratory (equipped) 1      EACH 5,500.00 5,500.00 7,000.00 7,000.00 25,000.00 25,000.00    
724-01-C pavement patching (15" minimum thickness) 158      SQYD 87.50 13,825.00 115.00 18,170.00 110.00 17,380.00    
727-01 mobilization lump      LUMP 56,000.00 56,000.00 230,000.00 230,000.00 70,000.00 70,000.00    
729-16-B object marker assembly (type 2) 3      EACH 66.50 199.50 68.00 204.00 205.00 615.00    
729-16-C object marker assembly (type 3) 8      EACH 78.00 624.00 80.00 640.00 230.00 1,840.00    
731-02 reflectorized raised pavement markers 470      EACH 5.76 2,707.20 5.50 2,585.00 6.50 3,055.00    
732-01-E plastic pavement striping (24" width) 57      LNFT 3.89 221.73 3.40 193.80 4.40 250.80    
732-02-A plastic pavement striping (solid line) (4" width) 7.203  MILE 2,366.00 17,042.30 2,400.00 17,287.20 2,660.00 19,159.98    
732-03-A plastic pavement striping (broken line)(4" width) 3.474  MILE 769.00 2,671.51 800.00 2,779.20 865.00 3,005.01    
735-01 mailboxes 33      EACH 12.00 396.00 20.00 660.00 88.50 2,920.50    
735-02 mailbox supports (single) 32      EACH 142.00 4,544.00 175.00 5,600.00 290.00 9,280.00    
735-03 mailbox supports (double) 1      EACH 194.00 194.00 285.00 285.00 365.00 365.00    
740-01 construction layout lump      LUMP 5,850.00 5,850.00 19,000.00 19,000.00 28,000.00 28,000.00    
744-01 traffic control management lump      LUMP 15,250.00 15,250.00 60,000.00 60,000.00 30,000.00 30,000.00    
S-001 full depth sawcutting of existing portland cement
concrete drives
306      INFT 2.77 847.62 8.25 2,524.50 15.00 4,590.00    
                       
 CONTRACTOR TOTAL       2,089,336.35   2,406,746.53   2,545,626.18    