Letting of 8/30/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 361-04-0008
Parish: WINN
Routes: LA 34
Description: GRANT PARISH LINE - 5.1 MILES NORTH
Type Const: pavement patching, asphaltic concrete binder and wearing courses, and related work.
Estimated Construction Cost: $1,928,683.48
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,877,158.15
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,369,283.32
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,671,529.45
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 2,500.00 2,500.00 3,000.00 3,000.00 50,000.00 50,000.00    
202-01 removal of structures & obstructions lump      LUMP 2,500.00 2,500.00 3,000.00 3,000.00 25,000.00 25,000.00    
203-08 borrow (vehicular measurement) 5,826      CUYD 1.50 8,739.00 12.75 74,281.50 15.00 87,390.00    
203-09 geotextile fabric 217      SQYD 3.00 651.00 2.50 542.50 3.00 651.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
3,850      CUYD 54.50 209,825.00 64.00 246,400.00 50.00 192,500.00    
502-01 superpave asphaltic concrete 13,601.0    TON 65.00 884,065.00 73.00 992,873.00 68.00 924,868.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
646.7    TON 40.00 25,868.00 95.00 61,436.50 100.00 64,670.00    
509-01 cold planing asphaltic pavement 889      SQYD 5.00 4,445.00 1.00 889.00 13.00 11,557.00    
509-02 contractor retained reclaimed asphaltic pavement - 41      CUYD 0.01 - 0.41 0.01 - 0.41 0.10 - 4.10    
701-01-M/N cross drain pipe (36" rcp/pcp or 42" cmp) 248      LNFT 190.00 47,120.00 138.00 34,224.00 150.00 37,200.00    
711-01-E riprap (130 lb, 12" thick) 62      SQYD 100.00 6,200.00 75.00 4,650.00 76.00 4,712.00    
711-04 geotextile fabric 62      SQYD 3.00 186.00 2.50 155.00 3.00 186.00    
713-01 temporary signs & barricades lump      LUMP 47,000.00 47,000.00 25,000.00 25,000.00 20,000.00 20,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.227  MILE 325.00 3,323.78 300.00 3,068.10 150.00 1,534.05    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
8.129  MILE 1.00 8.13 1.00 8.13 300.00 2,438.70    
713-05-A temporary pavement markings (solid line)(4" width) 30.250  MILE 1.00 30.25 1.00 30.25 700.00 21,175.00    
717-01 seeding 235      LB 8.50 1,997.50 9.00 2,115.00 10.00 2,350.00    
718-01 fertilizer 7,820      LB 0.25 1,955.00 0.30 2,346.00 0.28 2,189.60    
721-01 asphalt mulch 18,925      GAL 1.65 31,226.25 1.80 34,065.00 1.84 34,822.00    
724-01-B pavement patching (12" minimum thickness) 9,000      SQYD 50.00 450,000.00 73.00 657,000.00 78.00 702,000.00    
726-01 bedding material 74.0    CUYD 50.00 3,700.00 70.00 5,180.00 72.00 5,328.00    
727-01 mobilization lump      LUMP 47,000.00 47,000.00 63,000.00 63,000.00 190,000.00 190,000.00    
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00 85.00 340.00 84.00 336.00    
731-02 reflectorized raised pavement markers 675      EACH 5.00 3,375.00 4.43 2,990.25 5.00 3,375.00    
732-02-A plastic pavement striping (solid line) (4" width) 15.125  MILE 2,150.00 32,518.75 2,100.00 31,762.50 2,400.00 36,300.00    
732-03-A plastic pavement striping (broken line)(4" width) 4.064  MILE 700.00 2,844.80 750.00 3,048.00 800.00 3,251.20    
735-01 mailboxes 14      EACH 1.00 14.00 10.00 140.00 25.00 350.00    
735-02 mailbox supports (single) 14      EACH 135.00 1,890.00 145.00 2,030.00 200.00 2,800.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 18,000.00 18,000.00    
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 35,000.00 35,000.00 50,000.00 50,000.00    
S-001 cleaning existing ditches 75      LNFT 10.00 750.00 28.00 2,100.00 28.00 2,100.00    
S-002 sack concrete headwall 68.7    CUYD 375.00 25,762.50 650.00 44,655.00 700.00 48,090.00    
S-003 saw cutting 126,360      INFT 0.01 1,263.60 0.15 18,954.00 1.00 126,360.00    
                       
 CONTRACTOR TOTAL       1,877,158.15   2,369,283.32   2,671,529.45    