| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - SOIL STABILIZERS, INC. |
- 3 - BENTON & BROWN, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
97   |
SQYD |
1.00 |
97.00 |
1.00 |
97.00 |
30.00 |
2,910.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
9,000   |
CUYD |
8.00 |
72,000.00 |
7.00 |
63,000.00 |
16.00 |
144,000.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
93,555.0 |
SQYD |
7.15 |
668,918.25 |
7.40 |
692,307.00 |
7.50 |
701,662.50 |
|
|
| 502-01 |
superpave asphaltic concrete
|
9,882.8 |
TON |
70.00 |
691,796.00 |
70.00 |
691,796.00 |
75.00 |
741,210.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
900.0 |
TON |
40.00 |
36,000.00 |
57.00 |
51,300.00 |
75.00 |
67,500.00 |
|
|
| 507-01-A |
asphaltic surface treatment (1 application)
|
93,555   |
SQYD |
2.23 |
208,627.65 |
2.25 |
210,498.75 |
2.50 |
233,887.50 |
|
|
| 701-13-D |
corrugated metal pipe arch (extension)(24" equiv.)
|
24   |
LNFT |
163.00 |
3,912.00 |
125.00 |
3,000.00 |
250.00 |
6,000.00 |
|
|
| 701-13-E |
corrugated metal pipe arch (extension)(30" equiv.)
|
10   |
LNFT |
192.00 |
1,920.00 |
135.00 |
1,350.00 |
275.00 |
2,750.00 |
|
|
| 701-13-F |
corrugated metal pipe arch (extension)(36" equiv.)
|
28   |
LNFT |
220.00 |
6,160.00 |
160.00 |
4,480.00 |
300.00 |
8,400.00 |
|
|
| 701-15 |
concrete collar
|
14   |
EACH |
700.00 |
9,800.00 |
600.00 |
8,400.00 |
725.00 |
10,150.00 |
|
|
| 712-04 |
flexible revetment
|
225   |
SQYD |
70.00 |
15,750.00 |
100.00 |
22,500.00 |
70.00 |
15,750.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
12,500.00 |
12,500.00 |
120,000.00 |
120,000.00 |
|
|
| 713-02-A |
temporary pavement markings (tabs)
|
lump |
LUMP |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
12   |
LNFT |
10.00 |
120.00 |
1.00 |
12.00 |
1.00 |
12.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.350 |
MILE |
400.00 |
2,540.00 |
300.00 |
1,905.00 |
350.00 |
2,222.50 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.404 |
MILE |
300.00 |
721.20 |
400.00 |
961.60 |
1.00 |
2.40 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
17.933 |
MILE |
575.00 |
10,311.48 |
300.00 |
5,379.90 |
1.00 |
17.93 |
|
|
| 716-01-B |
mulch (fiber)
|
15.50 |
ACRE |
800.00 |
12,400.00 |
1,000.00 |
15,500.00 |
750.00 |
11,625.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
140   |
SQYD |
1.00 |
140.00 |
1.00 |
140.00 |
100.00 |
14,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
50,000.00 |
50,000.00 |
135,000.00 |
135,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
75.00 |
300.00 |
90.00 |
360.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
840   |
EACH |
5.00 |
4,200.00 |
4.50 |
3,780.00 |
6.00 |
5,040.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.00 |
36.00 |
5.00 |
60.00 |
4.00 |
48.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.933 |
MILE |
2,150.00 |
38,555.95 |
2,200.00 |
39,452.60 |
2,450.00 |
43,935.85 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.404 |
MILE |
700.00 |
1,682.80 |
600.00 |
1,442.40 |
800.00 |
1,923.20 |
|
|
| 735-01 |
mailboxes
|
38   |
each |
1.00 |
38.00 |
1.00 |
38.00 |
1.00 |
38.00 |
|
|
| 735-01-A |
mailboxes (oversize)
|
2   |
each |
40.00 |
80.00 |
40.00 |
80.00 |
50.00 |
100.00 |
|
|
| 735-02 |
mailbox supports (single)
|
32   |
each |
125.00 |
4,000.00 |
125.00 |
4,000.00 |
150.00 |
4,800.00 |
|
|
| 735-03 |
mailbox supports (double)
|
4   |
each |
180.00 |
720.00 |
180.00 |
720.00 |
200.00 |
800.00 |
|
|
| 739-01 |
hydro-seeding
|
15.50 |
ACRE |
940.00 |
14,570.00 |
1,000.00 |
15,500.00 |
1,550.00 |
24,025.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,500.00 |
12,500.00 |
12,000.00 |
12,000.00 |
25,000.00 |
25,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,909,496.33 |
|
1,927,500.25 |
|
2,363,169.88 |
|
|
|