Letting of 8/30/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 256-04-0014
Parish: ST JAMES
Routes: LA 44
Description: JCT. LA 642 - LAMBREMONT STREET
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete overlay and related work.
Estimated Construction Cost: $2,249,849.17
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $2,315,441.02
2 06276 BARRIERE CONSTRUCTION CO., LLC. $2,423,198.30
3 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,587,491.03
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00 5,000.00 5,000.00    
202-02-H removal of guard rail 126      LNFT 10.00 1,260.00 11.00 1,386.00 7.00 882.00    
203-08 borrow (vehicular measurement) 2,000      CUYD 1.00 2,000.00 12.00 24,000.00 5.00 10,000.00    
204-06 temorary silt fencing 1,000      LNFT 1.75 1,750.00 2.00 2,000.00 2.00 2,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,814      CUYD 1.00 2,814.00 30.00 84,420.00 5.00 14,070.00    
502-01 superpave asphaltic concrete 21,020.4    TON 63.00 1,324,285.20 68.00 1,429,387.20 62.00 1,303,264.80    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,108.4    TON 1.00 2,108.40 68.00 143,371.20 62.00 130,720.80    
509-01 cold planing asphaltic pavement 106,163      SQYD 3.05 323,797.15 1.50 159,244.50 2.50 265,407.50    
509-02 contractor retained reclaimed asphaltic pavement - 5,308      CUYD 0.01 - 53.08 5.00 - 26,540.00 0.10 - 530.80    
701-02-D cross drain pipe arch (24" equiv. rcpa) 1,416      LNFT 120.00 169,920.00 125.00 177,000.00 200.00 283,200.00    
702-03-A catch basins (cb-01) 4      EACH 5,000.00 20,000.00 3,400.00 13,600.00 5,000.00 20,000.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 20,000.00 20,000.00 100,000.00 100,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
22.620  MILE 300.00 6,786.00 110.00 2,488.20 600.00 13,572.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
15.807  MILE 350.00 5,532.45 1.00 15.81 10.00 158.07    
713-05-A temporary pavement markings (solid line)(4" width) 48.646  MILE 600.00 29,187.60 2.00 97.29 10.00 486.46    
724-01-B pavement patching (12" minimum thickness) 1,200      SQYD 80.00 96,000.00 30.00 36,000.00 85.00 102,000.00    
726-01 bedding material 580.6    CUYD 1.00 580.60 39.00 22,643.40 FREE FREE    
727-01 mobilization lump      LUMP 160,000.00 160,000.00 200,000.00 200,000.00 100,000.00 100,000.00    
729-16-B object marker assembly (type 2) 40      EACH 65.00 2,600.00 50.00 2,000.00 50.00 2,000.00    
731-02 reflectorized raised pavement markers 996      EACH 5.50 5,478.00 6.00 5,976.00 6.00 5,976.00    
732-02-A plastic pavement striping (solid line) (4" width) 21.242  MILE 2,200.00 46,732.40 2,200.00 46,732.40 2,600.00 55,229.20    
732-03-A plastic pavement striping (broken line)(4" width) 5.269  MILE 700.00 3,688.30 700.00 3,688.30 1,000.00 5,269.00    
735-01 mailboxes 58      EACH 1.00 58.00 5.00 290.00 7.00 406.00    
735-02 mailbox supports (single) 56      EACH 150.00 8,400.00 100.00 5,600.00 150.00 8,400.00    
735-03 mailbox supports (double) 1      EACH 200.00 200.00 180.00 180.00 300.00 300.00    
739-01 hydro-seeding 3.66   ACRE 1,000.00 3,660.00 900.00 3,294.00 1,000.00 3,660.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 57,700.00 57,700.00    
744-01 traffic control management lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 60,000.00 60,000.00    
S-001 tree and stump removal lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 15,000.00 15,000.00    
S-002 saw cutting (9" deep) 2,332      LNFT 8.00 18,656.00 7.00 16,324.00 10.00 23,320.00    
                       
 CONTRACTOR TOTAL       2,315,441.02   2,423,198.30   2,587,491.03    