| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
126   |
LNFT |
10.00 |
1,260.00 |
11.00 |
1,386.00 |
7.00 |
882.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,000   |
CUYD |
1.00 |
2,000.00 |
12.00 |
24,000.00 |
5.00 |
10,000.00 |
|
|
| 204-06 |
temorary silt fencing
|
1,000   |
LNFT |
1.75 |
1,750.00 |
2.00 |
2,000.00 |
2.00 |
2,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,814   |
CUYD |
1.00 |
2,814.00 |
30.00 |
84,420.00 |
5.00 |
14,070.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
21,020.4 |
TON |
63.00 |
1,324,285.20 |
68.00 |
1,429,387.20 |
62.00 |
1,303,264.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,108.4 |
TON |
1.00 |
2,108.40 |
68.00 |
143,371.20 |
62.00 |
130,720.80 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
106,163   |
SQYD |
3.05 |
323,797.15 |
1.50 |
159,244.50 |
2.50 |
265,407.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 5,308   |
CUYD |
0.01 |
- 53.08 |
5.00 |
- 26,540.00 |
0.10 |
- 530.80 |
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
1,416   |
LNFT |
120.00 |
169,920.00 |
125.00 |
177,000.00 |
200.00 |
283,200.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
4   |
EACH |
5,000.00 |
20,000.00 |
3,400.00 |
13,600.00 |
5,000.00 |
20,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
22.620 |
MILE |
300.00 |
6,786.00 |
110.00 |
2,488.20 |
600.00 |
13,572.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.807 |
MILE |
350.00 |
5,532.45 |
1.00 |
15.81 |
10.00 |
158.07 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
48.646 |
MILE |
600.00 |
29,187.60 |
2.00 |
97.29 |
10.00 |
486.46 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,200   |
SQYD |
80.00 |
96,000.00 |
30.00 |
36,000.00 |
85.00 |
102,000.00 |
|
|
| 726-01 |
bedding material
|
580.6 |
CUYD |
1.00 |
580.60 |
39.00 |
22,643.40 |
FREE |
FREE |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
160,000.00 |
160,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
40   |
EACH |
65.00 |
2,600.00 |
50.00 |
2,000.00 |
50.00 |
2,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
996   |
EACH |
5.50 |
5,478.00 |
6.00 |
5,976.00 |
6.00 |
5,976.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.242 |
MILE |
2,200.00 |
46,732.40 |
2,200.00 |
46,732.40 |
2,600.00 |
55,229.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.269 |
MILE |
700.00 |
3,688.30 |
700.00 |
3,688.30 |
1,000.00 |
5,269.00 |
|
|
| 735-01 |
mailboxes
|
58   |
EACH |
1.00 |
58.00 |
5.00 |
290.00 |
7.00 |
406.00 |
|
|
| 735-02 |
mailbox supports (single)
|
56   |
EACH |
150.00 |
8,400.00 |
100.00 |
5,600.00 |
150.00 |
8,400.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
180.00 |
180.00 |
300.00 |
300.00 |
|
|
| 739-01 |
hydro-seeding
|
3.66 |
ACRE |
1,000.00 |
3,660.00 |
900.00 |
3,294.00 |
1,000.00 |
3,660.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
57,700.00 |
57,700.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
60,000.00 |
60,000.00 |
|
|
| S-001 |
tree and stump removal
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-002 |
saw cutting (9" deep)
|
2,332   |
LNFT |
8.00 |
18,656.00 |
7.00 |
16,324.00 |
10.00 |
23,320.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,315,441.02 |
|
2,423,198.30 |
|
2,587,491.03 |
|
|
|