Lead Project: 254-02-0050
Parish: E BATON ROUGE
Routes: LA 37
Description: MONTERREY BLVD. - SULLIVAN RD.
Type Const: pcc patching on la 37
Estimated Construction Cost: $346,571.00
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $434,625.00
2 24901 HARD ROCK CONSTRUCTION CO. $792,150.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
HARD ROCK CONSTRUCTION CO.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
800.0    SQYD 155.00 124,000.00 205.00 164,000.00        
602-05-G-02 full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds)
750.0    SQYD 147.50 110,625.00 205.00 153,750.00        
602-05-G-03 full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over)
1,000.0    SQYD 140.00 140,000.00 205.00 205,000.00        
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 75,000.00 75,000.00        
727-01 mobilization lump      LUMP 20,000.00 20,000.00 170,000.00 170,000.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
S-001 dynamic message sign unit 2      EACH 5,000.00 10,000.00 7,200.00 14,400.00        
                       
 CONTRACTOR TOTAL       434,625.00   792,150.00        