| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - SOIL STABILIZERS, INC. |
- 3 - AMETHYST CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
140,000.00 |
140,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 140+30.00, 4'x
3'x 45') |
1   |
EACH |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 169+94.00, 5'x
5'x 42') |
1   |
EACH |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
|
|
| 203-01-A |
general excavation (plan quantity)
|
64,908   |
CUYD |
7.50 |
486,810.00 |
6.00 |
389,448.00 |
15.00 |
973,620.00 |
|
|
| 203-02 |
drainage excavation
|
155   |
CUYD |
20.00 |
3,100.00 |
17.00 |
2,635.00 |
25.00 |
3,875.00 |
|
|
| 203-03 |
muck excavation
|
1,243   |
CUYD |
20.00 |
24,860.00 |
18.00 |
22,374.00 |
25.00 |
31,075.00 |
|
|
| 203-04-A |
embankment (plan quantity)
|
19,520   |
CUYD |
10.00 |
195,200.00 |
12.00 |
234,240.00 |
18.00 |
351,360.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
10.00 |
1,000.00 |
12.00 |
1,200.00 |
20.00 |
2,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
30   |
EACH |
85.00 |
2,550.00 |
300.00 |
9,000.00 |
250.00 |
7,500.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
10   |
EACH |
1,600.00 |
16,000.00 |
1,800.00 |
18,000.00 |
750.00 |
7,500.00 |
|
|
| 204-06 |
temporary silt fencing
|
10,331   |
LNFT |
2.00 |
20,662.00 |
5.00 |
51,655.00 |
3.00 |
30,993.00 |
|
|
| 302-02-D-01 |
class ii base course (12" thick)(soil cement)
|
24,013.2 |
SQYD |
18.00 |
432,237.60 |
15.00 |
360,198.00 |
9.50 |
228,125.40 |
|
|
| 304-01 |
lime
|
336.78 |
TON |
140.00 |
47,149.20 |
145.00 |
48,833.10 |
125.00 |
42,097.50 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
23,758   |
SQYD |
2.75 |
65,334.50 |
3.00 |
71,274.00 |
3.00 |
71,274.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
874.3 |
CUYD |
35.00 |
30,600.50 |
80.00 |
69,944.00 |
45.00 |
39,343.50 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,200.0 |
CUYD |
20.00 |
44,000.00 |
70.00 |
154,000.00 |
50.00 |
110,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,172.0 |
TON |
95.00 |
396,340.00 |
100.00 |
417,200.00 |
120.00 |
500,640.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
169.9 |
TON |
200.00 |
33,980.00 |
275.00 |
46,722.50 |
140.00 |
23,786.00 |
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
104   |
LNFT |
300.00 |
31,200.00 |
235.00 |
24,440.00 |
350.00 |
36,400.00 |
|
|
| 701-02-L |
cross drain pipe arch (72" equiv. rcpa)
|
344   |
LNFT |
500.00 |
172,000.00 |
475.00 |
163,400.00 |
1,200.00 |
412,800.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
448   |
LNFT |
100.00 |
44,800.00 |
75.00 |
33,600.00 |
50.00 |
22,400.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
244   |
LNFT |
60.00 |
14,640.00 |
100.00 |
24,400.00 |
60.00 |
14,640.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,250.00 |
2,500.00 |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
4,500.00 |
27,000.00 |
4,000.00 |
24,000.00 |
4,500.00 |
27,000.00 |
|
|
| 705-01 |
barbed wire fence
|
5,367   |
LNFT |
7.00 |
37,569.00 |
10.00 |
53,670.00 |
5.00 |
26,835.00 |
|
|
| 705-04 |
single swinging driveway gates
|
3   |
EACH |
500.00 |
1,500.00 |
500.00 |
1,500.00 |
350.00 |
1,050.00 |
|
|
| 705-06-C |
chain link fence (6-foot height)
|
450   |
LNFT |
20.00 |
9,000.00 |
26.00 |
11,700.00 |
20.00 |
9,000.00 |
|
|
| 708-01 |
right-of-way monument
|
45   |
EACH |
150.00 |
6,750.00 |
300.00 |
13,500.00 |
200.00 |
9,000.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
45   |
EACH |
125.00 |
5,625.00 |
275.00 |
12,375.00 |
200.00 |
9,000.00 |
|
|
| 711-01-C |
riprap (30 lb, 14" thickness)
|
2,319   |
SQYD |
75.00 |
173,925.00 |
80.00 |
185,520.00 |
40.00 |
92,760.00 |
|
|
| 711-04 |
geotextile fabric
|
2,319   |
SQYD |
5.00 |
11,595.00 |
4.00 |
9,276.00 |
3.00 |
6,957.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
175,000.00 |
175,000.00 |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.800 |
MILE |
350.00 |
980.00 |
400.00 |
1,120.00 |
2,500.00 |
7,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
5.300 |
MILE |
500.00 |
2,650.00 |
400.00 |
2,120.00 |
3,500.00 |
18,550.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
4.74 |
ACRE |
750.00 |
3,555.00 |
1,000.00 |
4,740.00 |
1,000.00 |
4,740.00 |
|
|
| 717-01 |
seeding
|
190   |
LB |
9.00 |
1,710.00 |
10.00 |
1,900.00 |
20.00 |
3,800.00 |
|
|
| 718-01 |
fertilizer
|
4,740   |
LB |
0.50 |
2,370.00 |
0.75 |
3,555.00 |
3.00 |
14,220.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
10,000.00 |
10,000.00 |
|
|
| 726-01 |
bedding material
|
200.0 |
CUYD |
85.00 |
17,000.00 |
85.00 |
17,000.00 |
50.00 |
10,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
250,000.00 |
250,000.00 |
200,000.00 |
200,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
6   |
EACH |
100.00 |
600.00 |
125.00 |
750.00 |
150.00 |
900.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
211   |
EACH |
9.00 |
1,899.00 |
9.00 |
1,899.00 |
6.00 |
1,266.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
135   |
LNFT |
7.00 |
945.00 |
10.00 |
1,350.00 |
5.00 |
675.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.836 |
MILE |
3,600.00 |
10,209.60 |
4,000.00 |
11,344.00 |
3,500.00 |
9,926.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.000 |
MILE |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
30.00 |
30.00 |
50.00 |
50.00 |
30.00 |
30.00 |
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
175.00 |
175.00 |
300.00 |
300.00 |
150.00 |
150.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
70,000.00 |
70,000.00 |
125,000.00 |
125,000.00 |
100,000.00 |
100,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
25.46 |
CUYD |
1,800.00 |
45,828.00 |
1,200.00 |
30,552.00 |
1,200.00 |
30,552.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,417   |
LB |
2.75 |
3,896.75 |
3.00 |
4,251.00 |
2.00 |
2,834.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,260,976.15 |
|
3,558,935.60 |
|
4,046,174.40 |
|
|
|