Lead Project: 023-10-0039
Parish: LINCOLN
Routes: US 167
Description: JCT. LA 822 - DUBACH
Type Const: grading, drainage structures, lime trmt, class ii base course, superpave acp (alt.
a-1), pccp (alt. a-2), concrete girder span bridges and approaches and related work
Estimated Construction Cost: $16,799,098.18
Maximum Number of Days Allowed for Construction: 700
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $16,575,517.80 700 $17,275,517.80
2 39462 DENTON-JAMES LLC $16,836,630.48 700 $17,536,630.48
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
DENTON-JAMES LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      lump 750,000.00 750,000.00 900,000.00 900,000.00        
202-01 removal of structures & obstructions lump      lump 78,000.00 78,000.00 200,000.00 200,000.00        
202-02-A removal of bridges (sta. 56+241.685 to sta. 56+236.756) 1      each 5,000.00 5,000.00 10,000.00 10,000.00        
202-02-B-01 removal of concrete box culverts (sta. 54+532.23;
2-1600 mm x 930 mm x 22 m)
1      each 1,500.00 1,500.00 20,000.00 20,000.00        
202-02-B-02 removal of concrete box culverts (sta. 55+620.69;
1219 mm x 610 mm x 31 m)
1      each 1,000.00 1,000.00 10,000.00 10,000.00        
202-02-B-03 removal of concrete box culverts (sta. 55+799.92;
610 mm x 610 mm x 25.5 m)
1      each 800.00 800.00 6,000.00 6,000.00        
202-02-B-04 removal of concrete box culverts (sta. 55+949.70;
610 mm x 610 mm x 35.6 m)
1      each 1,100.00 1,100.00 6,000.00 6,000.00        
202-02-B-05 removal of concrete box culverts (sta. 56+230.60;
1820 mm x 1820 mm x 45.7 m)
1      each 1,400.00 1,400.00 23,000.00 23,000.00        
202-02-C removal of portland cement concrete pavement 19,705      sq m 12.00 236,460.00 9.00 177,345.00        
202-02-D removal of concrete walks & drives 526      sq m 10.00 5,260.00 12.00 6,312.00        
202-02-G removal of surfacing & stabilized base 21,587.5    sq m 7.00 151,112.50 5.00 107,937.50        
202-02-H removal of guard rail 553      ln m 20.00 11,060.00 12.00 6,636.00        
202-02-I removal of paved ditch 1,263      sq m 10.00 12,630.00 9.00 11,367.00        
202-02-01 removal of 11 m x 8.6 m wood frame residence on piers
(rt. of sta. 54+155.26)
1      each 2,500.00 2,500.00 1.00 1.00        
202-02-02 removal of 12 m x 11.7 m wood frame residence on slab
(lt. of sta. 54+163.36)
1      each 3,500.00 3,500.00 1.00 1.00        
202-02-03 removal of 15.9 m x 9.3 m brick residence on slab (lt.
of sta. 54+201.68)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-04 removal of 17 m x 8.2 m brick residence on slab (lt.
of sta. 54+239.92)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-05 removal of 33.5 m x 9.1 m brick residence on slab (rt.
of sta. 54+243.12)
1      each 5,000.00 5,000.00 1.00 1.00        
202-02-06 removal of 25 m x 9.0 m brick residence on slab (rt.
of sta. 54+641.81)
1      each 4,000.00 4,000.00 1.00 1.00        
202-02-07 removal of 24.4 m x 10.7 m brick residence on slab
(rt. of sta. 54+928.09)
1      each 4,500.00 4,500.00 1.00 1.00        
202-02-08 removal of 20.6 m x 8.7 m wood frame residence on
piers (lt. of sta. 54+989.54)
1      each 3,500.00 3,500.00 1.00 1.00        
202-02-09 removal of 15.7 m x 7.3 m house trailer (rt. of sta.
55+341.12)
1      each 1.00 1.00 1.00 1.00        
202-02-10 removal of 19.2 m x 15.6 m brick residence on slab
(lt. of sta. 55+467.18)
1      each 5,000.00 5,000.00 1.00 1.00        
203-01 general excavation 210,107      cu m 5.00 1,050,535.00 3.70 777,395.90        
203-02 drainage excavation 10,000      cu m 15.00 150,000.00 10.00 100,000.00        
203-03 muck excavation 72      cu m 25.00 1,800.00 40.00 2,880.00        
203-04 embankment 296,734      cu m 7.00 2,077,138.00 7.00 2,077,138.00        
204-02 temporary hay or straw bales 35      ea 10.00 350.00 8.00 280.00        
204-05-A temporary sediment check dams (hay) 129      ea 120.00 15,480.00 100.00 12,900.00        
204-05-B temporary sediment check dams (stone) 234      ea 350.00 81,900.00 600.00 140,400.00        
204-06 temporary silt fencing 1,990      ln m 8.00 15,920.00 6.00 11,940.00        
204-07 temporary stone construction entrance 2      ea 2,000.00 4,000.00 1,600.00 3,200.00        
304-01 lime 355.30   Mg 145.00 51,518.50 120.00 42,636.00        
304-04-D lime treatment (type d) (300 mm thick) 23,499      sq m 2.10 49,347.90 2.00 46,998.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
200      cu m 65.00 13,000.00 100.00 20,000.00        
402-01 traffic maintenance aggregate (vehicular measurement) 1,000      cu m 75.00 75,000.00 85.00 85,000.00        
701-01-S cross drain pipe (1800 mm rcp) 344.0    ln m 1,100.00 378,400.00 1,100.00 378,400.00        
701-03-G storm drain pipe (450 mm rcp) 175.0    ln m 160.00 28,000.00 160.00 28,000.00        
701-05-G side drain pipe (450 mm) 127.0    ln m 135.00 17,145.00 160.00 20,320.00        
701-05-I side drain pipe (600 mm) 198.0    ln m 195.00 38,610.00 180.00 35,640.00        
701-05-K side drain pipe (750 mm) 61.0    ln m 375.00 22,875.00 210.00 12,810.00        
701-05-M side drain pipe (900 mm) 98.0    ln m 500.00 49,000.00 270.00 26,460.00        
701-05-N side drain pipe (1050 mm) 70.0    ln m 650.00 45,500.00 350.00 24,500.00        
702-03-A catch basins (cb-01) 5      ea 3,200.00 16,000.00 2,800.00 14,000.00        
704-03 blocked out guard rail 425.68   ln m 50.00 21,284.00 51.00 21,709.68        
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 160.00 9,753.60 160.00 9,753.60        
704-11-A guard rail end treatment (flared) 8      ea 1,850.00 14,800.00 1,900.00 15,200.00        
705-01 barbed wire fence 644      ln m 20.00 12,880.00 20.00 12,880.00        
705-02 combination mesh & barbed wire fence 770      ln m 24.00 18,480.00 24.00 18,480.00        
705-04 single swinging driveway gates 3      each 500.00 1,500.00 500.00 1,500.00        
706-02-C concrete drive (150 mm thick) 1,183.3    sq m 45.00 53,248.50 60.00 70,998.00        
708-01 right-of-way monument 60      ea 125.00 7,500.00 120.00 7,200.00        
708-02 right-of-way monument witness post 60      ea 125.00 7,500.00 120.00 7,200.00        
711-01-B-01 riprap (5 kg, 300 mm thick) 983      sq m 70.00 68,810.00 62.00 60,946.00        
711-01-B-02 riprap (5 kg, 450 mm thick) 2,500      sq m 85.00 212,500.00 68.00 170,000.00        
711-04 geotextile fabric 3,483      sq m 2.50 8,707.50 2.00 6,966.00        
712-01-A concrete cast-in-place revetment (100 mm thick) 5,372      sq m 50.00 268,600.00 52.00 279,344.00        
713-01 temporary signs & barricades lump      lump 100,000.00 100,000.00 200,000.00 200,000.00        
713-04-A-01 temporary pavement markings (broken line)(100 mm width)
(1.2 m length) (type i removable)
6.000  km 1,800.00 10,800.00 800.00 4,800.00        
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type i removable)
12      km 6,000.00 72,000.00 5,900.00 70,800.00        
716-01-A mulch (vegetative) 39.6    hctr 1,300.00 51,480.00 1,300.00 51,480.00        
717-01 seeding 1,350      kg 15.00 20,250.00 14.00 18,900.00        
718-01 fertilizer 44,352      kg 0.50 22,176.00 0.50 22,176.00        
720-01-B erosion control system, slope protection (type b) 17,554      sq m 1.25 21,942.50 1.30 22,820.20        
720-01-C erosion control system, flexible channel liner (type c) 3,009      sq m 1.50 4,513.50 1.50 4,513.50        
720-01-D erosion control system, flexible channel liner (type d) 13,680      sq m 3.00 41,040.00 3.00 41,040.00        
722-02 project site laboratory (equipped) 1      ea 20,000.00 20,000.00 40,000.00 40,000.00        
725-01 temporary detour roads 1,205.6    ln m 300.00 361,680.00 280.00 337,568.00        
726-01 bedding material 115.9    cu m 90.00 10,431.00 85.00 9,851.50        
727-01 mobilization lump      lump 1,600,000.00 1,600,000.00 1,600,000.00 1,600,000.00        
729-16-C object marker assembly (type 3) 8      ea 70.00 560.00 70.00 560.00        
731-01 nonreflectorized raised pavement markers 792      ea 12.00 9,504.00 12.00 9,504.00        
731-02 reflectorized raised pavement markers 1,099      ea 5.50 6,044.50 5.50 6,044.50        
732-01-C plastic pavement striping (200 mm width) 64      ln m 3.00 192.00 20.00 1,280.00        
732-01-D plastic pavement striping (300 mm width) 174      ln m 5.00 870.00 20.00 3,480.00        
732-02-A plastic pavement striping (solid line)(100 mm width) 12.401  km 1,600.00 19,841.60 1,900.00 23,561.90        
732-04-A plastic pavement legends & symbols (arrow) 4      ea 175.00 700.00 300.00 1,200.00        
732-04-C plastic pavement legends & symbols (only) 2      ea 195.00 390.00 300.00 600.00        
735-01 mailboxes 30      ea 10.00 300.00 1.00 30.00        
735-02 mailbox supports (single) 30      ea 150.00 4,500.00 160.00 4,800.00        
740-01 construction layout lump      lump 150,000.00 150,000.00 250,000.00 250,000.00        
744-01 traffic control management lump      lump 35,000.00 35,000.00 40,000.00 40,000.00        
804-01-C precast concrete piles (400 mm) 384.0    ln m 250.00 96,000.00 230.00 88,320.00        
804-01-F precast concrete piles (600 mm) 875.0    ln m 435.00 380,625.00 430.00 376,250.00        
804-01-G precast concrete piles (750 mm) 1,344.0    ln m 600.00 806,400.00 480.00 645,120.00        
804-05 precast concrete test piles 1      ea 50,000.00 50,000.00 25,000.00 25,000.00        
804-09 loading test piles 1      ea 4,000.00 4,000.00 10,000.00 10,000.00        
804-10 reloading test piles 1      ea 1,000.00 1,000.00 500.00 500.00        
804-11 redriving test piles 1      ea 1,000.00 1,000.00 500.00 500.00        
804-17 dynamic monitoring 1      ea 1,000.00 1,000.00 1,000.00 1,000.00        
805-01-F class a concrete (bents) 370.98   cu m 750.00 278,235.00 1,000.00 370,980.00        
805-03 class aa concrete 907.54   cu m 650.00 589,901.00 750.00 680,655.00        
805-08-B precast-prestressed concrete girders (type ii) 1,559.25   ln m 325.00 506,756.25 300.00 467,775.00        
805-11 strip seal joints 51.72   ln m 420.00 21,722.40 420.00 21,722.40        
806-01 deformed reinforcing steel 37,561      kg 1.70 63,853.70 2.00 75,122.00        
806-02 deformed reinforcing steel (epoxy coated) 131,978      kg 2.10 277,153.80 2.30 303,549.40        
807-06 structural metalwork lump      lump 10,000.00 10,000.00 10,000.00 10,000.00        
810-01 concrete railing (barrier) 668.40   ln m 150.00 100,260.00 170.00 113,628.00        
813-01 concrete approach slabs 575.52   sq m 175.00 100,716.00 190.00 109,348.80        
S-001 rumble strips (ground-in) 9.6    km 1,000.00 9,600.00 520.00 4,992.00        
S-002 adjusting water house connections 15.0    each 1,000.00 15,000.00 800.00 12,000.00        
S-003 removal of s. p. 023-10-0035 transition road lump      lump 15,000.00 15,000.00 15,000.00 15,000.00        
S-004 removal of s. p. 023-10-0038 transition road lump      lump 18,500.00 18,500.00 15,000.00 15,000.00        
S-101 dynamic analysis 1      each 750.00 750.00 1,000.00 1,000.00        
S-102 retroreflective sheeting panels lump      lump 1,000.00 1,000.00 3,000.00 3,000.00        
 SUBTOTAL GENERAL       12,089,094.75   12,143,154.88        
                       
ALTERNATE A pavement options                    
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
203-05-A nonplastic embankment (stone) 3,222      cu m 0.00 0.00 0.00 0.00        
302-02-A-01 class ii base course (150 mm thick)(soil cement) 51,897.1    sq m 0.00 0.00 0.00 0.00        
302-02-C-01 class ii base course (250 mm thick)(stone or recycled
pccp)
18,210.8    sq m 0.00 0.00 0.00 0.00        
302-02-E-01 class ii base course (200 mm thick)(stone or recycled
pccp)
136.0    sq m 0.00 0.00 0.00 0.00        
302-02-F-01 class ii base course (100 mm thick)(stone or recycled
pccp)
51,897.1    sq m 0.00 0.00 0.00 0.00        
502-01 superpave asphaltic concrete 17,166.2    Mg 0.00 0.00 0.00 0.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,361.1    Mg 0.00 0.00 0.00 0.00        
732-03-A plastic pavement striping (broken line)(100 mm width) 7.561  km 0.00 0.00 0.00 0.00        
                       
ALTERNATE A2 portland cement concrete pavement                    
203-05-A nonplastic embankment (stone) 3,222      cu m 0.01 32.22 0.01 32.22        
302-02-A-01 class ii base course (150 mm thick)(soil cement) 51,897.1    sq m 8.75 454,099.63 9.80 508,591.58        
302-02-C-01 class ii base course (250 mm thick)(stone or recycled
pccp)
18,210.8    sq m 31.00 564,534.80 32.00 582,745.60        
302-02-E-01 class ii base course (200 mm thick)(stone or recycled
pccp)
136.0    sq m 35.00 4,760.00 60.00 8,160.00        
302-02-F-01 class ii base course (100 mm thick)(stone or recycled
pccp)
51,897.1    sq m 15.00 778,456.50 14.00 726,559.40        
502-01 superpave asphaltic concrete 1,707.2    Mg 200.00 341,440.00 180.00 307,296.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
640.6    Mg 260.00 166,556.00 250.00 160,150.00        
601-01-G portland cement concrete pavement (200 mm thick) 43,796.7    sq m 42.00 1,839,461.40 48.00 2,102,241.60        
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers and turnouts)
4,877.0    sq m 65.00 317,005.00 56.00 273,112.00        
601-04 portland cement concrete pavement coring 50      each 100.00 5,000.00 100.00 5,000.00        
732-03-A plastic pavement striping (broken line)(100 mm width) 1.800  km 500.00 900.00 800.00 1,440.00        
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
(preformed marking tape, type v)
5.671  km 2,500.00 14,177.50 3,200.00 18,147.20        
 SUBTOTAL ALT A2       4,486,423.05   4,693,475.60        
                       
 ITEM TOTAL (CONSTRUCTION BID)       16,575,517.80   16,836,630.48        
 Number of Days Bid at $1,000 per day.     700 700,000.00 700 700,000.00 0   0  
 TOTAL BID       17,275,517.80   17,536,630.48        