| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
3,092   |
LNFT |
3.50 |
10,822.00 |
6.00 |
18,552.00 |
5.00 |
15,460.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,426   |
CUYD |
5.00 |
12,130.00 |
15.00 |
36,390.00 |
14.00 |
33,964.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
12,745   |
CUYD |
7.00 |
89,215.00 |
30.00 |
382,350.00 |
48.00 |
611,760.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
22,531.8 |
TON |
77.00 |
1,734,948.60 |
80.00 |
1,802,544.00 |
84.00 |
1,892,671.20 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,436.9 |
TON |
120.00 |
292,428.00 |
10.00 |
24,369.00 |
143.00 |
348,476.70 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
182,713   |
SQYD |
1.50 |
274,069.50 |
1.60 |
292,340.80 |
1.50 |
274,069.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,807   |
CUYD |
10.00 |
- 38,070.00 |
9.00 |
- 34,263.00 |
0.10 |
- 380.70 |
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
8,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,850.0 |
LNFT |
19.00 |
35,150.00 |
20.00 |
37,000.00 |
20.00 |
37,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
60.00 |
24,000.00 |
60.00 |
24,000.00 |
60.00 |
24,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
2,200.00 |
35,200.00 |
3,000.00 |
48,000.00 |
2,300.00 |
36,800.00 |
|
|
| 707-04 |
asphaltic curb
|
160.0 |
LNFT |
20.00 |
3,200.00 |
40.00 |
6,400.00 |
30.00 |
4,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
120,000.00 |
120,000.00 |
86,000.00 |
86,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,659   |
LNFT |
0.10 |
165.90 |
0.40 |
663.60 |
0.43 |
713.37 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
3,771   |
LNFT |
0.30 |
1,131.30 |
1.00 |
3,771.00 |
1.36 |
5,128.56 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
41.175 |
MILE |
10.00 |
411.75 |
15.00 |
617.63 |
136.00 |
5,599.80 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
30.330 |
MILE |
15.00 |
454.95 |
10.00 |
303.30 |
325.00 |
9,857.25 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
103.200 |
MILE |
30.00 |
3,096.00 |
20.00 |
2,064.00 |
650.00 |
67,080.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
15   |
EACH |
10.00 |
150.00 |
54.00 |
810.00 |
59.00 |
885.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
10.00 |
120.00 |
54.00 |
648.00 |
59.00 |
708.00 |
|
|
| 713-06-F |
temporary pavement legends and symbols (school)
|
6   |
EACH |
20.00 |
120.00 |
210.00 |
1,260.00 |
225.00 |
1,350.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
3,969   |
SQYD |
110.00 |
436,590.00 |
70.00 |
277,830.00 |
125.00 |
496,125.00 |
|
|
| 724-03 |
pavement joint repair
|
1,063.5 |
TON |
40.00 |
42,540.00 |
110.00 |
116,985.00 |
280.00 |
297,780.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
365,000.00 |
365,000.00 |
398,000.00 |
398,000.00 |
400,000.00 |
400,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
35   |
EACH |
80.00 |
2,800.00 |
80.00 |
2,800.00 |
80.00 |
2,800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,721   |
EACH |
5.50 |
9,465.50 |
6.00 |
10,326.00 |
5.00 |
8,605.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
553   |
LNFT |
1.25 |
691.25 |
2.00 |
1,106.00 |
1.27 |
702.31 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,257   |
LNFT |
3.70 |
4,650.90 |
5.00 |
6,285.00 |
3.80 |
4,776.60 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
34.400 |
MILE |
2,250.00 |
77,400.00 |
3,000.00 |
103,200.00 |
2,300.00 |
79,120.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
10.110 |
MILE |
730.00 |
7,380.30 |
1,000.00 |
10,110.00 |
750.00 |
7,582.50 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
185.00 |
925.00 |
300.00 |
1,500.00 |
190.00 |
950.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
200.00 |
800.00 |
300.00 |
1,200.00 |
200.00 |
800.00 |
|
|
| 732-04-F |
plastic pavement legends & symbols (school)
|
2   |
EACH |
450.00 |
900.00 |
600.00 |
1,200.00 |
450.00 |
900.00 |
|
|
| 735-01 |
mailboxes
|
181   |
EACH |
5.50 |
995.50 |
1.00 |
181.00 |
25.00 |
4,525.00 |
|
|
| 735-02 |
mailbox supports (single)
|
181   |
EACH |
110.00 |
19,910.00 |
100.00 |
18,100.00 |
200.00 |
36,200.00 |
|
|
| 736-09 |
loop detector
|
300   |
LNFT |
13.00 |
3,900.00 |
20.00 |
6,000.00 |
13.00 |
3,900.00 |
|
|
| 736-10 |
underground junction box
|
2   |
EACH |
275.00 |
550.00 |
500.00 |
1,000.00 |
300.00 |
600.00 |
|
|
| 739-01 |
hydro-seeding
|
3.16 |
ACRE |
1,000.00 |
3,160.00 |
2,000.00 |
6,320.00 |
1,800.00 |
5,688.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
|
|
| S-001 |
u-channel post installation
|
127   |
EACH |
60.00 |
7,620.00 |
70.00 |
8,890.00 |
64.00 |
8,128.00 |
|
|
| S-002 |
saw cutting of portland cement concrete pavement and/
or asphaltic concrete pavement (full depth) |
2,600   |
LNFT |
25.00 |
65,000.00 |
30.00 |
78,000.00 |
24.00 |
62,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,673,021.45 |
|
3,986,853.33 |
|
4,989,525.09 |
|
|
|