Lead Project: 013-12-0050
Parish: ST TAMMANY
Routes: US 190
Description: LITTLE BAYOU CASTINE - JCT. LA 433
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching & joint repair, and related work.
Estimated Construction Cost: $2,832,418.55
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $3,673,021.45
2 06276 BARRIERE CONSTRUCTION CO., LLC. $3,986,853.33
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $4,989,525.09
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 3,092      LNFT 3.50 10,822.00 6.00 18,552.00 5.00 15,460.00    
203-08 borrow (vehicular measurement) 2,426      CUYD 5.00 12,130.00 15.00 36,390.00 14.00 33,964.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
12,745      CUYD 7.00 89,215.00 30.00 382,350.00 48.00 611,760.00    
502-01 superpave asphaltic concrete 22,531.8    TON 77.00 1,734,948.60 80.00 1,802,544.00 84.00 1,892,671.20    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,436.9    TON 120.00 292,428.00 10.00 24,369.00 143.00 348,476.70    
509-01 cold planing asphaltic pavement 182,713      SQYD 1.50 274,069.50 1.60 292,340.80 1.50 274,069.50    
509-02 contractor retained reclaimed asphaltic pavement - 3,807      CUYD 10.00 - 38,070.00 9.00 - 34,263.00 0.10 - 380.70    
702-04-B adjusting catch basins 2      EACH 2,000.00 4,000.00 2,000.00 4,000.00 4,000.00 8,000.00    
704-03 blocked out guard rail 1,850.0    LNFT 19.00 35,150.00 20.00 37,000.00 20.00 37,000.00    
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 60.00 24,000.00 60.00 24,000.00 60.00 24,000.00    
704-11-A guard rail end treatment (flared) 16      EACH 2,200.00 35,200.00 3,000.00 48,000.00 2,300.00 36,800.00    
707-04 asphaltic curb 160.0    LNFT 20.00 3,200.00 40.00 6,400.00 30.00 4,800.00    
713-01 temporary signs & barricades lump      LUMP 120,000.00 120,000.00 86,000.00 86,000.00 100,000.00 100,000.00    
713-03-C temporary pavement markings (8" width) 1,659      LNFT 0.10 165.90 0.40 663.60 0.43 713.37    
713-03-E temporary pavement markings (24" width) 3,771      LNFT 0.30 1,131.30 1.00 3,771.00 1.36 5,128.56    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
41.175  MILE 10.00 411.75 15.00 617.63 136.00 5,599.80    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
30.330  MILE 15.00 454.95 10.00 303.30 325.00 9,857.25    
713-05-A temporary pavement markings (solid line)(4" width) 103.200  MILE 30.00 3,096.00 20.00 2,064.00 650.00 67,080.00    
713-06-A temporary pavement legends and symbols (arrow) 15      EACH 10.00 150.00 54.00 810.00 59.00 885.00    
713-06-C temporary pavement legends and symbols (only) 12      EACH 10.00 120.00 54.00 648.00 59.00 708.00    
713-06-F temporary pavement legends and symbols (school) 6      EACH 20.00 120.00 210.00 1,260.00 225.00 1,350.00    
724-01-B pavement patching (12" minimum thickness) 3,969      SQYD 110.00 436,590.00 70.00 277,830.00 125.00 496,125.00    
724-03 pavement joint repair 1,063.5    TON 40.00 42,540.00 110.00 116,985.00 280.00 297,780.00    
727-01 mobilization lump      LUMP 365,000.00 365,000.00 398,000.00 398,000.00 400,000.00 400,000.00    
729-16-C object marker assembly (type 3) 35      EACH 80.00 2,800.00 80.00 2,800.00 80.00 2,800.00    
731-02 reflectorized raised pavement markers 1,721      EACH 5.50 9,465.50 6.00 10,326.00 5.00 8,605.00    
732-01-C plastic pavement striping (8" width) 553      LNFT 1.25 691.25 2.00 1,106.00 1.27 702.31    
732-01-E plastic pavement striping (24" width) 1,257      LNFT 3.70 4,650.90 5.00 6,285.00 3.80 4,776.60    
732-02-A plastic pavement striping (solid line) (4" width) 34.400  MILE 2,250.00 77,400.00 3,000.00 103,200.00 2,300.00 79,120.00    
732-03-A plastic pavement striping (broken line)(4" width) 10.110  MILE 730.00 7,380.30 1,000.00 10,110.00 750.00 7,582.50    
732-04-A plastic pavement legends & symbols (arrow) 5      EACH 185.00 925.00 300.00 1,500.00 190.00 950.00    
732-04-C plastic pavement legends & symbols (only) 4      EACH 200.00 800.00 300.00 1,200.00 200.00 800.00    
732-04-F plastic pavement legends & symbols (school) 2      EACH 450.00 900.00 600.00 1,200.00 450.00 900.00    
735-01 mailboxes 181      EACH 5.50 995.50 1.00 181.00 25.00 4,525.00    
735-02 mailbox supports (single) 181      EACH 110.00 19,910.00 100.00 18,100.00 200.00 36,200.00    
736-09 loop detector 300      LNFT 13.00 3,900.00 20.00 6,000.00 13.00 3,900.00    
736-10 underground junction box 2      EACH 275.00 550.00 500.00 1,000.00 300.00 600.00    
739-01 hydro-seeding 3.16   ACRE 1,000.00 3,160.00 2,000.00 6,320.00 1,800.00 5,688.00    
740-01 construction layout lump      LUMP 10,000.00 10,000.00 100,000.00 100,000.00 30,000.00 30,000.00    
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 100,000.00 100,000.00 60,000.00 60,000.00    
S-001 u-channel post installation 127      EACH 60.00 7,620.00 70.00 8,890.00 64.00 8,128.00    
S-002 saw cutting of portland cement concrete pavement and/
or asphaltic concrete pavement (full depth)
2,600      LNFT 25.00 65,000.00 30.00 78,000.00 24.00 62,400.00    
                       
 CONTRACTOR TOTAL       3,673,021.45   3,986,853.33   4,989,525.09    