Letting of 7/26/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-26-0064
Parish: JEFFERSON
Routes:
Description: POWER BOULEVARD OVERLAY WEST ESPLANADE AVE. TO VINTAGE DR.
Type Const: grading, drainage structures, cold planing asphaltic pavement, superpave asphaltic
concrete overlay and related work.
Estimated Construction Cost: $924,448.78
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,147,041.60
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,363,392.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 365      SQYD 7.00 2,555.00 20.00 7,300.00        
202-02-E removal of concrete curbs 2,052.0    LNFT 2.00 4,104.00 9.00 18,468.00        
203-08 borrow (vehicular measurement) 400      CUYD 20.00 8,000.00 50.00 20,000.00        
502-01 superpave asphaltic concrete 4,937.2    TON 78.00 385,101.60 95.00 469,034.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,200.0    TON 78.00 93,600.00 75.00 90,000.00        
509-01 cold planing asphaltic pavement 27,895      SQYD 4.00 111,580.00 5.00 139,475.00        
701-14 cleaning existing pipes 12,000      LNFT 8.00 96,000.00 9.00 108,000.00        
702-04-A adjusting manholes 3      EACH 600.00 1,800.00 200.00 600.00        
702-04-B adjusting catch basins 20      EACH 5,000.00 100,000.00 2,750.00 55,000.00        
702-04-D adjusting drain inlets 10      EACH 1,000.00 10,000.00 2,750.00 27,500.00        
706-01-A concrete walk (4" thick) 30.0    SQYD 70.00 2,100.00 110.00 3,300.00        
706-02-C concrete drive (6" thick) 350.0    SQYD 70.00 24,500.00 80.00 28,000.00        
707-03 combination concrete curb & gutter 2,052.0    LNFT 35.00 71,820.00 40.00 82,080.00        
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 111,000.00 111,000.00        
713-03-E temporary pavement markings (24" width) 200      LNFT 1.00 200.00 1.00 200.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.500  MILE 10.00 35.00 100.00 350.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.500  MILE 20.00 70.00 420.00 1,470.00        
713-05-A temporary pavement markings (solid line)(4" width) 4.000  MILE 30.00 120.00 100.00 400.00        
714-01 slab sodding 300      SQYD 10.00 3,000.00 10.00 3,000.00        
717-01 seeding 15      LB 20.00 300.00 55.00 825.00        
718-01 fertilizer 500      LB 1.00 500.00 3.00 1,500.00        
727-01 mobilization lump      LUMP 100,000.00 100,000.00 110,000.00 110,000.00        
731-02 reflectorized raised pavement markers 390      EACH 6.00 2,340.00 6.00 2,340.00        
732-01-C plastic pavement striping (8" width) 1,330      LNFT 1.30 1,729.00 1.00 1,330.00        
732-01-E plastic pavement striping (24" width) 620      LNFT 3.85 2,387.00 4.00 2,480.00        
732-02-A plastic pavement striping (solid line) (4" width) 3.500  MILE 2,600.00 9,100.00 2,600.00 9,100.00        
732-03-A plastic pavement striping (broken line)(4" width) 2.000  MILE 1,100.00 2,200.00 1,000.00 2,000.00        
732-04-A plastic pavement legends & symbols (arrow) 14      EACH 200.00 2,800.00 190.00 2,660.00        
732-04-C plastic pavement legends & symbols (only) 12      EACH 215.00 2,580.00 185.00 2,220.00        
736-09 loop detector 110      LNFT 17.00 1,870.00 16.00 1,760.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 12,500.00 12,500.00        
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 25,000.00 25,000.00        
S-001 cleaning and resealing random cracks in asphaltic
concrete pavement
2,000      LNFT 3.00 6,000.00 2.00 4,000.00        
S-002 cleaning existing catch basins 46      EACH 150.00 6,900.00 250.00 11,500.00        
S-003 cleaning existing drain inlets 33      EACH 100.00 3,300.00 250.00 8,250.00        
S-004 cleaning existing drain manholes 3      EACH 150.00 450.00 250.00 750.00        
                       
 CONTRACTOR TOTAL       1,147,041.60   1,363,392.00        