| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
365   |
SQYD |
7.00 |
2,555.00 |
20.00 |
7,300.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
2,052.0 |
LNFT |
2.00 |
4,104.00 |
9.00 |
18,468.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
400   |
CUYD |
20.00 |
8,000.00 |
50.00 |
20,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,937.2 |
TON |
78.00 |
385,101.60 |
95.00 |
469,034.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,200.0 |
TON |
78.00 |
93,600.00 |
75.00 |
90,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
27,895   |
SQYD |
4.00 |
111,580.00 |
5.00 |
139,475.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
12,000   |
LNFT |
8.00 |
96,000.00 |
9.00 |
108,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
600.00 |
1,800.00 |
200.00 |
600.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
20   |
EACH |
5,000.00 |
100,000.00 |
2,750.00 |
55,000.00 |
|
|
|
|
| 702-04-D |
adjusting drain inlets
|
10   |
EACH |
1,000.00 |
10,000.00 |
2,750.00 |
27,500.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
30.0 |
SQYD |
70.00 |
2,100.00 |
110.00 |
3,300.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
350.0 |
SQYD |
70.00 |
24,500.00 |
80.00 |
28,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
2,052.0 |
LNFT |
35.00 |
71,820.00 |
40.00 |
82,080.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
111,000.00 |
111,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
200   |
LNFT |
1.00 |
200.00 |
1.00 |
200.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.500 |
MILE |
10.00 |
35.00 |
100.00 |
350.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.500 |
MILE |
20.00 |
70.00 |
420.00 |
1,470.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.000 |
MILE |
30.00 |
120.00 |
100.00 |
400.00 |
|
|
|
|
| 714-01 |
slab sodding
|
300   |
SQYD |
10.00 |
3,000.00 |
10.00 |
3,000.00 |
|
|
|
|
| 717-01 |
seeding
|
15   |
LB |
20.00 |
300.00 |
55.00 |
825.00 |
|
|
|
|
| 718-01 |
fertilizer
|
500   |
LB |
1.00 |
500.00 |
3.00 |
1,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
390   |
EACH |
6.00 |
2,340.00 |
6.00 |
2,340.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,330   |
LNFT |
1.30 |
1,729.00 |
1.00 |
1,330.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
620   |
LNFT |
3.85 |
2,387.00 |
4.00 |
2,480.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.500 |
MILE |
2,600.00 |
9,100.00 |
2,600.00 |
9,100.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.000 |
MILE |
1,100.00 |
2,200.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
14   |
EACH |
200.00 |
2,800.00 |
190.00 |
2,660.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
12   |
EACH |
215.00 |
2,580.00 |
185.00 |
2,220.00 |
|
|
|
|
| 736-09 |
loop detector
|
110   |
LNFT |
17.00 |
1,870.00 |
16.00 |
1,760.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
12,500.00 |
12,500.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-001 |
cleaning and resealing random cracks in asphaltic
concrete pavement |
2,000   |
LNFT |
3.00 |
6,000.00 |
2.00 |
4,000.00 |
|
|
|
|
| S-002 |
cleaning existing catch basins
|
46   |
EACH |
150.00 |
6,900.00 |
250.00 |
11,500.00 |
|
|
|
|
| S-003 |
cleaning existing drain inlets
|
33   |
EACH |
100.00 |
3,300.00 |
250.00 |
8,250.00 |
|
|
|
|
| S-004 |
cleaning existing drain manholes
|
3   |
EACH |
150.00 |
450.00 |
250.00 |
750.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,147,041.60 |
|
1,363,392.00 |
|
|
|
|
|