| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
846   |
SQYD |
14.00 |
11,844.00 |
15.00 |
12,690.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
908.0 |
LNFT |
14.00 |
12,712.00 |
18.00 |
16,344.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
370   |
LNFT |
5.00 |
1,850.00 |
10.00 |
3,700.00 |
|
|
|
|
| 202-02-01 |
removal of asphaltic concrete curb and gutter
|
105   |
LNFT |
14.00 |
1,470.00 |
20.00 |
2,100.00 |
|
|
|
|
| 202-02-02 |
removal of approach slabs
|
1,111.1 |
SQYD |
30.00 |
33,333.00 |
40.00 |
44,444.00 |
|
|
|
|
| 202-02-03 |
removal of concrete
|
6   |
SQYD |
14.00 |
84.00 |
50.00 |
300.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
75.00 |
22,500.00 |
30.00 |
9,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
20.00 |
400.00 |
30.00 |
600.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
400   |
LNFT |
3.00 |
1,200.00 |
6.00 |
2,400.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,587.4 |
TON |
80.00 |
526,992.00 |
90.00 |
592,866.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
763.7 |
TON |
80.00 |
61,096.00 |
120.00 |
91,644.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
25,282   |
SQYD |
5.00 |
126,410.00 |
4.00 |
101,128.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
920   |
LNFT |
1.50 |
1,380.00 |
2.00 |
1,840.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
2,510   |
LNFT |
1.50 |
3,765.00 |
2.00 |
5,020.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
200   |
LNFT |
40.00 |
8,000.00 |
70.00 |
14,000.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
5,011   |
LNFT |
6.00 |
30,066.00 |
9.00 |
45,099.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
4   |
EACH |
3,500.00 |
14,000.00 |
7,000.00 |
28,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
3,500.00 |
14,000.00 |
9,000.00 |
36,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
5   |
EACH |
200.00 |
1,000.00 |
1,500.00 |
7,500.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
51   |
EACH |
400.00 |
20,400.00 |
700.00 |
35,700.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
337.5 |
LNFT |
110.00 |
37,125.00 |
50.00 |
16,875.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
431.3 |
LNFT |
50.00 |
21,565.00 |
90.00 |
38,817.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
37.5 |
LNFT |
85.00 |
3,187.50 |
90.00 |
3,375.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
6   |
EACH |
2,800.00 |
16,800.00 |
3,000.00 |
18,000.00 |
|
|
|
|
| 705-06-D |
chain link fence (7-foot height)
|
64   |
LNFT |
30.00 |
1,920.00 |
50.00 |
3,200.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
118.3 |
SQYD |
66.00 |
7,807.80 |
75.00 |
8,872.50 |
|
|
|
|
| 706-02-E |
concrete drive(8" thick)
|
76.0 |
SQYD |
90.00 |
6,840.00 |
110.00 |
8,360.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
223.8 |
SQYD |
70.00 |
15,666.00 |
75.00 |
16,785.00 |
|
|
|
|
| 707-01-A |
concrete curb (doweled barrier extension)
|
5,000.0 |
LNFT |
30.00 |
150,000.00 |
32.00 |
160,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
846.0 |
LNFT |
40.00 |
33,840.00 |
45.00 |
38,070.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
160,000.00 |
160,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.033 |
MILE |
100.00 |
403.30 |
400.00 |
1,613.20 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
51   |
EACH |
900.00 |
45,900.00 |
800.00 |
40,800.00 |
|
|
|
|
| 717-01 |
seeding
|
20   |
LB |
60.00 |
1,200.00 |
100.00 |
2,000.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
10   |
SQYD |
20.00 |
200.00 |
50.00 |
500.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
90   |
SQYD |
140.00 |
12,600.00 |
120.00 |
10,800.00 |
|
|
|
|
| 726-01 |
bedding material
|
25.0 |
CUYD |
50.00 |
1,250.00 |
80.00 |
2,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
210,000.00 |
210,000.00 |
240,000.00 |
240,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
613   |
EACH |
6.00 |
3,678.00 |
6.00 |
3,678.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,420   |
LNFT |
1.20 |
2,904.00 |
1.50 |
3,630.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
582   |
LNFT |
4.00 |
2,328.00 |
4.00 |
2,328.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.063 |
MILE |
3,000.00 |
6,189.00 |
3,000.00 |
6,189.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.970 |
MILE |
800.00 |
1,576.00 |
900.00 |
1,773.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
1.016 |
MILE |
600.00 |
609.60 |
6,000.00 |
6,096.00 |
|
|
|
|
| 736-09 |
loop detector
|
960   |
LNFT |
12.00 |
11,520.00 |
14.00 |
13,440.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
roadway reinforcing mesh (complete road system)
|
25,282   |
SQYD |
5.00 |
126,410.00 |
5.75 |
145,371.50 |
|
|
|
|
| S-002 |
cleaning and resealing random cracks in asphaltic
concrete pavement |
10,898   |
LNFT |
1.00 |
10,898.00 |
2.00 |
21,796.00 |
|
|
|
|
| S-003 |
impact attenuators (construction zone)
|
1   |
EACH |
27,000.00 |
27,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-004 |
approach slab bedding material (vehicular measure)
|
600   |
CUYD |
100.00 |
60,000.00 |
70.00 |
42,000.00 |
|
|
|
|
| S-005 |
saw cutting portland cement concrete
|
1,200   |
INFT |
10.00 |
12,000.00 |
5.00 |
6,000.00 |
|
|
|
|
| S-006 |
concrete approach slab
|
1,111.12 |
SQYD |
220.00 |
244,446.40 |
250.00 |
277,780.00 |
|
|
|
|
| S-007 |
saw cutting asphaltic concrete pavement
|
6,880   |
INFT |
1.50 |
10,320.00 |
1.50 |
10,320.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,108,685.60 |
|
2,425,844.20 |
|
|
|
|
|