Letting of 7/26/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 713-49-0118
Parish: ST LANDRY
Routes:
Description: JACK FOX ROAD BRIDGE
Type Const: grading, drainage structures, bridge superstructure and substructure and related
work.
Estimated Construction Cost: $248,248.00
 
RankLicenseBidderConstruction Bid
1 12136 SHILOH CONTRACTORS, INC. $273,061.00
2 08815 W. E. MCDONALD & SON, LLC. $304,511.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
SHILOH CONTRACTORS, INC.
- 2 -
W. E. MCDONALD & SON, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00        
202-01 removal of structures & obstructions lump      LUMP 1,000.00 1,000.00 7,000.00 7,000.00        
202-02-A-01 removal of bridge(sta.100+00,23.4' wide x 39.0'long
timber bridge with wing walls)
1      EACH 10,000.00 10,000.00 7,500.00 7,500.00        
202-03-A relocate metal gate lump      LUMP 500.00 500.00 1,000.00 1,000.00        
203-06 excavation & embankment lump      LUMP 15,000.00 15,000.00 20,000.00 20,000.00        
204-02 temporary hay or straw bales 10      EACH 1.00 10.00 50.00 500.00        
204-03 temporary slope drains 120      LNFT 1.00 120.00 12.00 1,440.00        
204-05-A temporary sediment check dams (hay) 4      EACH 1.00 4.00 200.00 800.00        
204-06 temporary silt fencing 165      LNFT 3.00 495.00 3.00 495.00        
403-01 aggregate roadway surfacing (vehicular measurement) 76.4    CUYD 90.00 6,876.00 100.00 7,640.00        
701-05-G-01 side drain pipe (18")(erosion) 180      LNFT 30.00 5,400.00 55.00 9,900.00        
701-05-I-01 side drain pipe (24")(erosion) 84      LNFT 45.00 3,780.00 75.00 6,300.00        
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 55.00 4,125.00 52.50 3,937.50        
704-09 guard rail anchor sections (turndown) 75.0    LNFT 35.00 2,625.00 23.50 1,762.50        
704-11-A guard rail end treatment (flared) 1      EACH 2,000.00 2,000.00 2,000.00 2,000.00        
705-01 barbed wire fence 346      LNFT 10.00 3,460.00 8.00 2,768.00        
705-04 single swinging driveway gates 1      EACH 450.00 450.00 500.00 500.00        
711-01-C riprap (30 lb,14" thick) 594      SQYD 55.00 32,670.00 75.00 44,550.00        
711-04 geotextile fabric 594      SQYD 2.50 1,485.00 3.00 1,782.00        
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
716-01-A mulch (vegetative) 0.15   ACRE 2,000.00 300.00 10,000.00 1,500.00        
717-01 seeding 7      LB 20.00 140.00 50.00 350.00        
718-01 fertilizer 146      LB 1.00 146.00 10.00 1,460.00        
720-01-A erosion control system, slope protection (type a) 117      SQYD 5.00 585.00 5.00 585.00        
727-01 mobilization lump      LUMP 35,000.00 35,000.00 12,000.00 12,000.00        
729-16-C object marker assembly (type 3) 7      EACH 70.00 490.00 70.00 490.00        
740-01 construction layout lump      LUMP 4,500.00 4,500.00 7,500.00 7,500.00        
804-01-B precast concrete piles (14") 765      LNFT 50.00 38,250.00 50.00 38,250.00        
804-12 loading permanent piles 1      EACH FREE FREE 1.00 1.00        
805-10-A bridge superstructure & substructure(24' clear rdwy;
90 degree crossing)
4      SPAN 22,000.00 88,000.00 24,000.00 96,000.00        
S-001 water gate 1      ea 650.00 650.00 1,500.00 1,500.00        
                       
 CONTRACTOR TOTAL       273,061.00   304,511.00        