Lead Project: 201-03-0004
Parish: ACADIA
Routes: LA 97
Description: LA 368 - US 190
Type Const: cold planing asphaltic concrete, in-place cement stabilized base course, superpave
asphaltic concrete pavement, and related work.
Estimated Construction Cost: $2,401,318.90
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $2,354,583.20
2 08815 W. E. MCDONALD & SON, LLC. $2,437,616.99
3 34356 PRAIRIE CONTRACTORS INC. $2,643,341.45
4 04089 H & S CONSTRUCTION CO., INC. $2,819,279.87
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
PRAIRIE CONTRACTORS INC.
- 4 -
H & S CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 434      CUYD 20.00 8,680.00 1.00 434.00 10.00 4,340.00 12.00 5,208.00
203-08-A borrow (vehicular meas.)(selected soils) 870      CUYD 20.00 17,400.00 1.00 870.00 10.00 8,700.00 14.00 12,180.00
204-02 temporary hay or straw bales 250      EACH 15.00 3,750.00 9.00 2,250.00 12.00 3,000.00 10.00 2,500.00
204-05-A temporary sediment check dams (hay) 15      EACH 135.00 2,025.00 300.00 4,500.00 40.00 600.00 175.00 2,625.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 74,340      SQYD 5.30 394,002.00 7.36 547,142.40 7.30 542,682.00 8.40 624,456.00
303-02 removal of existing patches 2,000      SQYD 1.00 2,000.00 1.00 2,000.00 0.50 1,000.00 30.00 60,000.00
305-01-C subgrade layer (10" thick) 48,692      SQYD 6.75 328,671.00 8.12 395,379.04 8.25 401,709.00 8.62 419,725.04
401-02 aggregate surface course (adjusted vehicular
measurement)
2,215      CUYD 30.00 66,450.00 14.00 31,010.00 31.00 68,665.00 45.00 99,675.00
502-01 superpave asphaltic concrete 15,550.2    TON 70.00 1,088,514.00 74.00 1,150,714.80 75.00 1,166,265.00 83.75 1,302,329.25
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
526.0    TON 120.00 63,120.00 90.00 47,340.00 25.00 13,150.00 100.00 52,600.00
509-01 cold planing asphaltic pavement 60,034      SQYD 2.45 147,083.30 0.10 6,003.40 1.90 114,064.60 1.20 72,040.80
509-02 contractor retained reclaimed asphaltic pavement - 2,815      CUYD 1.00 - 2,815.00 0.01 - 28.15 0.01 - 28.15 0.01 - 28.15
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 30,000.00 30,000.00 20,000.00 20,000.00 20,000.00 20,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.184  MILE 350.00 3,564.40 250.00 2,546.00 400.00 4,073.60 300.00 3,055.20
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.270  MILE 1.00 3.27 300.00 981.00 300.00 981.00 372.00 1,216.44
713-05-A temporary pavement markings (solid line)(4" width) 4.234  MILE 1.00 4.23 600.00 2,540.40 600.00 2,540.40 747.00 3,162.80
722-02 project site laboratory (equipped) 1      EACH 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 7,000.00 7,000.00
727-01 mobilization lump      LUMP 100,000.00 100,000.00 148,000.00 148,000.00 240,000.00 240,000.00 30,000.00 30,000.00
731-02 reflectorized raised pavement markers 674      EACH 5.00 3,370.00 4.50 3,033.00 5.00 3,370.00 6.13 4,131.62
732-02-A plastic pavement striping (solid line) (4" width) 14.274  MILE 2,500.00 35,685.00 2,150.00 30,689.10 2,500.00 35,685.00 2,795.00 39,895.83
732-03-A plastic pavement striping (broken line)(4" width) 3.270  MILE 800.00 2,616.00 700.00 2,289.00 800.00 2,616.00 1,152.00 3,767.04
735-01 mailboxes 28      EACH 5.00 140.00 1.00 28.00 1.00 28.00 10.00 280.00
735-02 mailbox supports (single) 18      EACH 140.00 2,520.00 145.00 2,610.00 200.00 3,600.00 140.00 2,520.00
735-03 mailbox supports (double) 2      EACH 200.00 400.00 195.00 390.00 300.00 600.00 270.00 540.00
735-04 mailbox supports (multiple) 1      EACH 400.00 400.00 395.00 395.00 500.00 500.00 400.00 400.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 9,500.00 9,500.00 100.00 100.00 20,000.00 20,000.00
744-01 traffic control management lump      LUMP 50,000.00 50,000.00 12,000.00 12,000.00 100.00 100.00 30,000.00 30,000.00
                       
 CONTRACTOR TOTAL       2,354,583.20   2,437,616.99   2,643,341.45   2,819,279.87