Lead Project: 194-02-0055
Parish: CAMERON
Routes: LA 82
Description: NORTH ISLAND RD. - SUPERIOR CANAL BRIDGE
Type Const: grading, superpave asphaltic concrete overlay, pavement patching, pavement widening
and related work.
Estimated Construction Cost: $1,117,284.18
 
RankLicenseBidderConstruction Bid
1 00183 R. E. HEIDT CONSTRUCTION CO., INC. $1,632,809.55
2 14096 BESSETTE DEVELOPMENT CORP. $2,194,341.35
3 34356 PRAIRIE CONTRACTORS INC. $2,426,554.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
BESSETTE DEVELOPMENT CORP.
- 3 -
PRAIRIE CONTRACTORS INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 347      CUYD 15.25 5,291.75 25.00 8,675.00 75.00 26,025.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
496      CUYD 72.00 35,712.00 95.50 47,368.00 150.00 74,400.00    
502-01 superpave asphaltic concrete 13,545.4    TON 82.00 1,110,722.80 89.00 1,205,540.60 95.00 1,286,813.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
13.5    TON 574.57 7,756.70 135.00 1,822.50 300.00 4,050.00    
701-15 concrete collar 11      EACH 1,880.00 20,680.00 1,800.00 19,800.00 1,500.00 16,500.00    
713-01 temporary signs & barricades lump      LUMP 3,150.00 3,150.00 9,000.00 9,000.00 200,000.00 200,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.164  MILE 227.40 1,629.09 350.00 2,507.40 500.00 3,582.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.516  MILE 315.00 2,052.54 350.00 2,280.60 600.00 3,909.60    
713-05-A temporary pavement markings (solid line)(4" width) 18.340  MILE 604.00 11,077.36 650.00 11,921.00 600.00 11,004.00    
724-01-B pavement patching (12" minimum thickness) 1,050      SQYD 64.00 67,200.00 105.00 110,250.00 100.00 105,000.00    
724-02 pavement widening 6,091.2    SQYD 47.00 286,286.40 108.00 657,849.60 65.00 395,928.00    
726-01 bedding material 13.4    CUYD 105.00 1,407.00 120.00 1,608.00 150.00 2,010.00    
727-01 mobilization lump      LUMP 41,000.00 41,000.00 52,000.00 52,000.00 200,000.00 200,000.00    
729-16-B object marker assembly (type 2) 28      EACH 58.00 1,624.00 65.00 1,820.00 100.00 2,800.00    
729-16-C object marker assembly (type 3) 14      EACH 79.00 1,106.00 85.00 1,190.00 100.00 1,400.00    
731-02 reflectorized raised pavement markers 473      EACH 5.00 2,365.00 5.00 2,365.00 5.00 2,365.00    
732-02-A plastic pavement striping (solid line) (4" width) 9.170  MILE 2,257.50 20,701.28 2,425.00 22,237.25 3,000.00 27,510.00    
732-03-A plastic pavement striping (broken line)(4" width) 3.258  MILE 735.00 2,394.63 800.00 2,606.40 1,000.00 3,258.00    
740-01 construction layout lump      LUMP 3,123.00 3,123.00 8,500.00 8,500.00 10,000.00 10,000.00    
744-01 traffic control management lump      LUMP 7,530.00 7,530.00 25,000.00 25,000.00 50,000.00 50,000.00    
                       
 CONTRACTOR TOTAL       1,632,809.55   2,194,341.35   2,426,554.60    