| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
1,041   |
SQYD |
14.00 |
14,574.00 |
30.00 |
31,230.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
4,710.0 |
LNFT |
6.00 |
28,260.00 |
4.50 |
21,195.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
650   |
CUYD |
20.00 |
13,000.00 |
20.00 |
13,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,434.4 |
TON |
89.00 |
1,195,661.60 |
81.00 |
1,088,186.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
642.8 |
TON |
89.00 |
57,209.20 |
250.00 |
160,700.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
122,491   |
SQYD |
2.50 |
306,227.50 |
6.00 |
734,946.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6,805   |
CUYD |
10.00 |
- 68,050.00 |
10.00 |
- 68,050.00 |
|
|
|
|
| 601-02-C |
portland cement concrete pavement (6" thick)
(crossovers & turnouts) |
66.0 |
SQYD |
120.00 |
7,920.00 |
100.00 |
6,600.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
80   |
LNFT |
100.00 |
8,000.00 |
50.00 |
4,000.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
138   |
EACH |
200.00 |
27,600.00 |
350.00 |
48,300.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
154   |
EACH |
200.00 |
30,800.00 |
1,200.00 |
184,800.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
975.0 |
SQYD |
55.00 |
53,625.00 |
130.00 |
126,750.00 |
|
|
|
|
| 707-01 |
concrete curb
|
4,710.0 |
LNFT |
30.00 |
141,300.00 |
8.00 |
37,680.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
330,000.00 |
330,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,837   |
LNFT |
0.10 |
183.70 |
0.40 |
734.80 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
963   |
LNFT |
1.00 |
963.00 |
1.40 |
1,348.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.060 |
MILE |
130.00 |
1,567.80 |
500.00 |
6,030.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
29.280 |
MILE |
1.00 |
29.28 |
100.00 |
2,928.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
46.440 |
MILE |
1.00 |
46.44 |
100.00 |
4,644.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
51   |
EACH |
1.00 |
51.00 |
55.00 |
2,805.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
25   |
EACH |
1.00 |
25.00 |
55.00 |
1,375.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
4   |
EACH |
1.00 |
4.00 |
300.00 |
1,200.00 |
|
|
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
5,528   |
EACH |
1.00 |
5,528.00 |
1.50 |
8,292.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
25.00 |
50,000.00 |
100.00 |
200,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
860.0 |
TON |
50.00 |
43,000.00 |
130.00 |
111,800.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
280,000.00 |
280,000.00 |
430,000.00 |
430,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,012   |
EACH |
6.00 |
24,072.00 |
5.20 |
20,862.40 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,837   |
LNFT |
1.00 |
1,837.00 |
1.20 |
2,204.40 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
963   |
LNFT |
4.00 |
3,852.00 |
3.60 |
3,466.80 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.480 |
MILE |
2,700.00 |
41,796.00 |
2,400.00 |
37,152.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.760 |
MILE |
1,100.00 |
10,736.00 |
1,000.00 |
9,760.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
51   |
EACH |
200.00 |
10,200.00 |
180.00 |
9,180.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
25   |
EACH |
200.00 |
5,000.00 |
200.00 |
5,000.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
4   |
EACH |
450.00 |
1,800.00 |
500.00 |
2,000.00 |
|
|
|
|
| 735-01 |
mailboxes
|
180   |
EACH |
1.00 |
180.00 |
5.00 |
900.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
150   |
EACH |
150.00 |
22,500.00 |
130.00 |
19,500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
15   |
EACH |
200.00 |
3,000.00 |
250.00 |
3,750.00 |
|
|
|
|
| 736-09 |
loop detector
|
1,047   |
LNFT |
13.00 |
13,611.00 |
13.00 |
13,611.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
80,000.00 |
80,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
60   |
EACH |
35.00 |
2,100.00 |
350.00 |
21,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
30,000.00 |
60,000.00 |
22,000.00 |
44,000.00 |
|
|
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
97,200   |
LNFT |
2.00 |
194,400.00 |
2.30 |
223,560.00 |
|
|
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
57,800   |
LNFT |
2.00 |
115,600.00 |
2.30 |
132,940.00 |
|
|
|
|
| S-004 |
sawcuts in asphaltic concrete lifts
|
155,100   |
LNFT |
0.50 |
77,550.00 |
0.55 |
85,305.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,909,759.52 |
|
4,218,686.00 |
|
|
|
|
|