Letting of 7/26/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 065-91-0026
Parish: TERREBONNE
Routes: LA 24, LA 57
Description: LA 3087 - LA 57 & LA 24 - C.S.L.M. 2.40
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching, and related work.
Estimated Construction Cost: $2,642,324.05
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $2,909,759.52
2 06487 HUEY STOCKSTILL, INC. $4,218,686.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 1,041      SQYD 14.00 14,574.00 30.00 31,230.00        
202-02-E removal of concrete curbs 4,710.0    LNFT 6.00 28,260.00 4.50 21,195.00        
203-08 borrow (vehicular measurement) 650      CUYD 20.00 13,000.00 20.00 13,000.00        
502-01 superpave asphaltic concrete 13,434.4    TON 89.00 1,195,661.60 81.00 1,088,186.40        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
642.8    TON 89.00 57,209.20 250.00 160,700.00        
509-01 cold planing asphaltic pavement 122,491      SQYD 2.50 306,227.50 6.00 734,946.00        
509-02 contractor retained reclaimed asphaltic pavement - 6,805      CUYD 10.00 - 68,050.00 10.00 - 68,050.00        
601-02-C portland cement concrete pavement (6" thick)
(crossovers & turnouts)
66.0    SQYD 120.00 7,920.00 100.00 6,600.00        
701-03-I storm drain pipe (24" rcp/pcp) 80      LNFT 100.00 8,000.00 50.00 4,000.00        
702-02-B manholes (r-cb-11) 1      EACH 3,000.00 3,000.00 4,000.00 4,000.00        
702-04-A adjusting manholes 138      EACH 200.00 27,600.00 350.00 48,300.00        
702-04-B adjusting catch basins 154      EACH 200.00 30,800.00 1,200.00 184,800.00        
706-01-C concrete walk (6" thick) 975.0    SQYD 55.00 53,625.00 130.00 126,750.00        
707-01 concrete curb 4,710.0    LNFT 30.00 141,300.00 8.00 37,680.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 330,000.00 330,000.00        
713-03-C temporary pavement markings (8" width) 1,837      LNFT 0.10 183.70 0.40 734.80        
713-03-E temporary pavement markings (24" width) 963      LNFT 1.00 963.00 1.40 1,348.20        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.060  MILE 130.00 1,567.80 500.00 6,030.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
29.280  MILE 1.00 29.28 100.00 2,928.00        
713-05-A temporary pavement markings (solid line)(4" width) 46.440  MILE 1.00 46.44 100.00 4,644.00        
713-06-A temporary pavement legends and symbols (arrow) 51      EACH 1.00 51.00 55.00 2,805.00        
713-06-C temporary pavement legends and symbols (only) 25      EACH 1.00 25.00 55.00 1,375.00        
713-06-E temporary pavement legends and symbols (school
crossing)
4      EACH 1.00 4.00 300.00 1,200.00        
713-07-A temporary reflectorized raised pavement markers (tabs) 5,528      EACH 1.00 5,528.00 1.50 8,292.00        
724-01-B pavement patching (12" minimum thickness) 2,000      SQYD 25.00 50,000.00 100.00 200,000.00        
724-03 pavement joint repair 860.0    TON 50.00 43,000.00 130.00 111,800.00        
727-01 mobilization lump      LUMP 280,000.00 280,000.00 430,000.00 430,000.00        
731-02 reflectorized raised pavement markers 4,012      EACH 6.00 24,072.00 5.20 20,862.40        
732-01-C plastic pavement striping (8" width) 1,837      LNFT 1.00 1,837.00 1.20 2,204.40        
732-01-E plastic pavement striping (24" width) 963      LNFT 4.00 3,852.00 3.60 3,466.80        
732-02-A plastic pavement striping (solid line) (4" width) 15.480  MILE 2,700.00 41,796.00 2,400.00 37,152.00        
732-03-A plastic pavement striping (broken line)(4" width) 9.760  MILE 1,100.00 10,736.00 1,000.00 9,760.00        
732-04-A plastic pavement legends & symbols (arrow) 51      EACH 200.00 10,200.00 180.00 9,180.00        
732-04-C plastic pavement legends & symbols (only) 25      EACH 200.00 5,000.00 200.00 5,000.00        
732-04-E plastic pavement legends & symbols (school crossing) 4      EACH 450.00 1,800.00 500.00 2,000.00        
735-01 mailboxes 180      EACH 1.00 180.00 5.00 900.00        
735-02 mailbox supports (single) 150      EACH 150.00 22,500.00 130.00 19,500.00        
735-03 mailbox supports (double) 15      EACH 200.00 3,000.00 250.00 3,750.00        
736-09 loop detector 1,047      LNFT 13.00 13,611.00 13.00 13,611.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 80,000.00 80,000.00        
741-11 adjusting water valve and meter box 60      EACH 35.00 2,100.00 350.00 21,000.00        
744-01 traffic control management lump      LUMP 1,000.00 1,000.00 10,000.00 10,000.00        
S-001 dynamic message sign unit 2      EACH 30,000.00 60,000.00 22,000.00 44,000.00        
S-002 sawing and sealing longitudinal joints in asphaltic
concrete overlay
97,200      LNFT 2.00 194,400.00 2.30 223,560.00        
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
57,800      LNFT 2.00 115,600.00 2.30 132,940.00        
S-004 sawcuts in asphaltic concrete lifts 155,100      LNFT 0.50 77,550.00 0.55 85,305.00        
                       
 CONTRACTOR TOTAL       2,909,759.52   4,218,686.00        