| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COVINGTON PAVING CO. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,694   |
LNFT |
5.00 |
8,470.00 |
8.00 |
13,552.00 |
5.50 |
9,317.00 |
6.00 |
10,164.00 |
| 203-08 |
borrow (vehicular measurement)
|
2,090   |
CUYD |
6.50 |
13,585.00 |
10.00 |
20,900.00 |
23.00 |
48,070.00 |
20.00 |
41,800.00 |
| 204-06 |
temporary silt fencing
|
1,555   |
LNFT |
1.60 |
2,488.00 |
1.00 |
1,555.00 |
2.00 |
3,110.00 |
3.00 |
4,665.00 |
| 502-01 |
superpave asphaltic concrete
|
45,005.8 |
TON |
68.53 |
3,084,247.47 |
74.00 |
3,330,429.20 |
74.00 |
3,330,429.20 |
70.00 |
3,150,406.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
885.8 |
TON |
70.00 |
62,006.00 |
110.00 |
97,438.00 |
74.00 |
65,549.20 |
100.00 |
88,580.00 |
| 507-01-B |
asphaltic surface treatment (2 applications)
|
60,052   |
SQYD |
3.15 |
189,163.80 |
3.50 |
210,182.00 |
4.00 |
240,208.00 |
4.00 |
240,208.00 |
| 509-01 |
cold planing asphaltic pavement
|
129,297   |
SQYD |
0.85 |
109,902.45 |
1.20 |
155,156.40 |
1.50 |
193,945.50 |
2.00 |
258,594.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,836   |
CUYD |
1.00 |
- 2,836.00 |
10.00 |
- 28,360.00 |
8.00 |
- 22,688.00 |
0.10 |
- 283.60 |
| 702-04-A |
adjusting manholes
|
4   |
each |
300.00 |
1,200.00 |
400.00 |
1,600.00 |
400.00 |
1,600.00 |
1,800.00 |
7,200.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
406.3 |
LNFT |
49.00 |
19,908.70 |
47.00 |
19,096.10 |
54.00 |
21,940.20 |
58.00 |
23,565.40 |
| 704-03 |
blocked out guard rail
|
868.8 |
LNFT |
16.00 |
13,900.80 |
19.00 |
16,507.20 |
17.00 |
14,769.60 |
19.00 |
16,507.20 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
31.3 |
LNFT |
84.00 |
2,629.20 |
78.00 |
2,441.40 |
90.00 |
2,817.00 |
98.00 |
3,067.40 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
62.5 |
LNFT |
34.00 |
2,125.00 |
36.00 |
2,250.00 |
36.00 |
2,250.00 |
40.00 |
2,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
49.00 |
4,900.00 |
50.00 |
5,000.00 |
54.00 |
5,400.00 |
58.00 |
5,800.00 |
| 704-11-A |
guard rail end treatment (flared)
|
9   |
EACH |
1,850.00 |
16,650.00 |
1,900.00 |
17,100.00 |
2,000.00 |
18,000.00 |
2,000.00 |
18,000.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
50.00 |
2,000.00 |
40.00 |
1,600.00 |
40.00 |
1,600.00 |
47.00 |
1,880.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
75,000.00 |
75,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
1,130   |
LNFT |
0.30 |
339.00 |
0.10 |
113.00 |
0.50 |
565.00 |
0.35 |
395.50 |
| 713-03-E |
temporary pavement markings (24" width)
|
842   |
LNFT |
0.90 |
757.80 |
0.20 |
168.40 |
1.00 |
842.00 |
1.00 |
842.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
25.304 |
MILE |
1,800.00 |
45,547.20 |
10.00 |
253.04 |
150.00 |
3,795.60 |
150.00 |
3,795.60 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
34.474 |
MILE |
300.00 |
10,342.20 |
20.00 |
689.48 |
20.00 |
689.48 |
350.00 |
12,065.90 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
68.948 |
MILE |
600.00 |
41,368.80 |
30.00 |
2,068.44 |
40.00 |
2,757.92 |
700.00 |
48,263.60 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
60.00 |
720.00 |
10.00 |
120.00 |
60.00 |
720.00 |
70.00 |
840.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
60.00 |
360.00 |
10.00 |
60.00 |
60.00 |
360.00 |
70.00 |
420.00 |
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
2,256   |
EACH |
2.00 |
4,512.00 |
1.00 |
2,256.00 |
2.00 |
4,512.00 |
2.00 |
4,512.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
6,000   |
SQYD |
68.00 |
408,000.00 |
72.00 |
432,000.00 |
62.00 |
372,000.00 |
75.00 |
450,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
250,000.00 |
250,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
14   |
EACH |
68.00 |
952.00 |
65.00 |
910.00 |
100.00 |
1,400.00 |
80.00 |
1,120.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,524   |
EACH |
4.50 |
11,358.00 |
5.50 |
13,882.00 |
5.50 |
13,882.00 |
6.00 |
15,144.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
565   |
LNFT |
1.00 |
565.00 |
1.20 |
678.00 |
2.00 |
1,130.00 |
1.00 |
565.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
421   |
LNFT |
3.00 |
1,263.00 |
3.70 |
1,557.70 |
5.00 |
2,105.00 |
3.50 |
1,473.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
34.474 |
MILE |
2,150.00 |
74,119.10 |
2,400.00 |
82,737.60 |
2,400.00 |
82,737.60 |
2,500.00 |
86,185.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
17.237 |
MILE |
700.00 |
12,065.90 |
950.00 |
16,375.15 |
1,000.00 |
17,237.00 |
820.00 |
14,134.34 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
150.00 |
900.00 |
180.00 |
1,080.00 |
200.00 |
1,200.00 |
175.00 |
1,050.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
150.00 |
450.00 |
195.00 |
585.00 |
200.00 |
600.00 |
175.00 |
525.00 |
| 735-01 |
mailboxes
|
97   |
EACH |
1.00 |
97.00 |
1.00 |
97.00 |
1.00 |
97.00 |
20.00 |
1,940.00 |
| 735-02 |
mailbox supports (single)
|
97   |
EACH |
145.00 |
14,065.00 |
140.00 |
13,580.00 |
150.00 |
14,550.00 |
180.00 |
17,460.00 |
| 739-01 |
hydro-seeding
|
20.78 |
ACRE |
1,000.00 |
20,780.00 |
1,100.00 |
22,858.00 |
1,200.00 |
24,936.00 |
1,400.00 |
29,092.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
22,000.00 |
22,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
28,500.00 |
28,500.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
70,000.00 |
70,000.00 |
100,000.00 |
100,000.00 |
| S-001 |
u-channel post installation
|
123   |
each |
50.00 |
6,150.00 |
90.00 |
11,070.00 |
60.00 |
7,380.00 |
60.00 |
7,380.00 |
| S-002 |
rumble strips (ground-in)
|
32.9 |
MILE |
600.00 |
19,740.00 |
450.00 |
14,805.00 |
1,000.00 |
32,900.00 |
800.00 |
26,320.00 |
| S-003 |
surface preparation
|
lump |
LUMP |
95,000.00 |
95,000.00 |
75,000.00 |
75,000.00 |
130,000.00 |
130,000.00 |
100,000.00 |
100,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,696,792.42 |
|
4,789,391.11 |
|
4,882,714.30 |
|
5,149,676.84 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - HUEY STOCKSTILL, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,694   |
LNFT |
6.00 |
10,164.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,090   |
CUYD |
24.00 |
50,160.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,555   |
LNFT |
6.00 |
9,330.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
45,005.8 |
TON |
80.00 |
3,600,464.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
885.8 |
TON |
160.00 |
141,728.00 |
|
|
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
60,052   |
SQYD |
4.00 |
240,208.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
129,297   |
SQYD |
2.00 |
258,594.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,836   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
4   |
each |
300.00 |
1,200.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
406.3 |
LNFT |
50.00 |
20,315.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
868.8 |
LNFT |
17.00 |
14,769.60 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
31.3 |
LNFT |
85.00 |
2,660.50 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
62.5 |
LNFT |
35.00 |
2,187.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
9   |
EACH |
2,000.00 |
18,000.00 |
|
|
|
|
|
|
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
100.00 |
4,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,130   |
LNFT |
0.45 |
508.50 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
842   |
LNFT |
0.90 |
757.80 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
25.304 |
MILE |
145.00 |
3,669.08 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
34.474 |
MILE |
325.00 |
11,204.05 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
68.948 |
MILE |
520.00 |
35,852.96 |
|
|
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
54.00 |
648.00 |
|
|
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
54.00 |
324.00 |
|
|
|
|
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
2,256   |
EACH |
1.50 |
3,384.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
6,000   |
SQYD |
50.00 |
300,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
590,000.00 |
590,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
14   |
EACH |
70.00 |
980.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,524   |
EACH |
6.00 |
15,144.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
565   |
LNFT |
1.20 |
678.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
421   |
LNFT |
4.00 |
1,684.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
34.474 |
MILE |
3,000.00 |
103,422.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
17.237 |
MILE |
1,100.00 |
18,960.70 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
200.00 |
1,200.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
200.00 |
600.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
97   |
EACH |
1.00 |
97.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
97   |
EACH |
150.00 |
14,550.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
20.78 |
ACRE |
1,200.00 |
24,936.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
132,000.00 |
132,000.00 |
|
|
|
|
|
|
| S-001 |
u-channel post installation
|
123   |
each |
72.00 |
8,856.00 |
|
|
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
32.9 |
MILE |
900.00 |
29,610.00 |
|
|
|
|
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|