| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
500,000.00 |
500,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
65,000.00 |
65,000.00 |
|
|
| 202-02-B |
removal of concrete box culverts
|
2   |
ea |
5,600.00 |
11,200.00 |
55,000.00 |
110,000.00 |
2,500.00 |
5,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
11,775   |
sq m |
7.00 |
82,425.00 |
10.00 |
117,750.00 |
14.00 |
164,850.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
5,877   |
sq m |
5.00 |
29,385.00 |
15.00 |
88,155.00 |
8.00 |
47,016.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
34,035.3 |
sq m |
5.00 |
170,176.50 |
18.00 |
612,635.40 |
5.50 |
187,194.15 |
|
|
| 202-02-H |
removal of guard rail
|
64   |
ln m |
10.00 |
640.00 |
9.00 |
576.00 |
15.00 |
960.00 |
|
|
| 202-02-I |
removal of traffic signal equipment
|
lump |
lump |
6,500.00 |
6,500.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-J |
removal of brick fence
|
7.6 |
lnm |
55.00 |
418.00 |
200.00 |
1,520.00 |
200.00 |
1,520.00 |
|
|
| 202-02-K |
removal of light poles
|
3   |
each |
850.00 |
2,550.00 |
900.00 |
2,700.00 |
850.00 |
2,550.00 |
|
|
| 203-01 |
general excavation (plan quantity)
|
56,534   |
cu m |
10.00 |
565,340.00 |
14.50 |
819,743.00 |
15.00 |
848,010.00 |
|
|
| 203-02 |
drainage excavation
|
392   |
cu m |
51.50 |
20,188.00 |
22.00 |
8,624.00 |
16.00 |
6,272.00 |
|
|
| 203-03 |
muck excavation
|
126   |
cu m |
45.00 |
5,670.00 |
35.00 |
4,410.00 |
20.00 |
2,520.00 |
|
|
| 203-04 |
embankment (plan quantity)
|
20,937   |
cu m |
10.00 |
209,370.00 |
25.00 |
523,425.00 |
25.00 |
523,425.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
100   |
ea |
100.00 |
10,000.00 |
100.00 |
10,000.00 |
95.00 |
9,500.00 |
|
|
| 204-06 |
temporary silt fencing
|
406   |
ln m |
10.00 |
4,060.00 |
15.00 |
6,090.00 |
13.00 |
5,278.00 |
|
|
| 302-02-C |
class ii base course (250 mm thick)
|
121,922.7 |
sq m |
22.00 |
2,682,299.40 |
32.00 |
3,901,526.40 |
35.00 |
4,267,294.50 |
|
|
| 304-01 |
lime
|
10,259.90 |
Mg |
0.10 |
1,025.99 |
0.01 |
102.60 |
145.00 |
1,487,685.50 |
|
|
| 304-04-D-01 |
lime treatment (type d) (300 mm thick)(granular or
slurry) |
60,962   |
sq m |
0.15 |
9,144.30 |
4.00 |
243,848.00 |
3.50 |
213,367.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,500.0 |
cu m |
60.00 |
90,000.00 |
120.00 |
180,000.00 |
85.00 |
127,500.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
35,918   |
sq m |
3.00 |
107,754.00 |
5.00 |
179,590.00 |
2.00 |
71,836.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 896   |
cu m |
10.00 |
- 8,960.00 |
7.00 |
- 6,272.00 |
1.00 |
- 896.00 |
|
|
| 701-02-F |
cross drain pipe arch (900 mm equiv. rcpa)
|
106.0 |
ln m |
800.00 |
84,800.00 |
700.00 |
74,200.00 |
650.00 |
68,900.00 |
|
|
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
3,297.8 |
ln m |
180.00 |
593,604.00 |
200.00 |
659,560.00 |
330.00 |
1,088,274.00 |
|
|
| 701-03-F-01 |
storm drain pipe (375 mm rcp/pcp)(outfall)
|
63.0 |
ln m |
190.00 |
11,970.00 |
170.00 |
10,710.00 |
370.00 |
23,310.00 |
|
|
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
917.6 |
ln m |
230.00 |
211,048.00 |
250.00 |
229,400.00 |
350.00 |
321,160.00 |
|
|
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
1,235.5 |
ln m |
340.00 |
420,070.00 |
330.00 |
407,715.00 |
410.00 |
506,555.00 |
|
|
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
826.8 |
ln m |
440.00 |
363,792.00 |
430.00 |
355,524.00 |
500.00 |
413,400.00 |
|
|
| 701-03-M |
storm drain pipe (900 mm rcp/pcp)
|
1,075.5 |
ln m |
520.00 |
559,260.00 |
580.00 |
623,790.00 |
700.00 |
752,850.00 |
|
|
| 701-03-N |
storm drain pipe (1050 mm rcp/pcp)
|
893.9 |
ln m |
630.00 |
563,157.00 |
720.00 |
643,608.00 |
700.00 |
625,730.00 |
|
|
| 701-03-O |
storm drain pipe (1200 mm rcp/pcp)
|
171.3 |
ln m |
760.00 |
130,188.00 |
730.00 |
125,049.00 |
870.00 |
149,031.00 |
|
|
| 701-03-Q |
storm drain pipe (1500 mm rcp/pcp)
|
594.4 |
ln m |
1,100.00 |
653,840.00 |
1,200.00 |
713,280.00 |
1,100.00 |
653,840.00 |
|
|
| 701-03-S |
storm drain pipe (1800 mm rcp/pcp)
|
130.4 |
ln m |
1,270.00 |
165,608.00 |
1,300.00 |
169,520.00 |
1,500.00 |
195,600.00 |
|
|
| 701-04-F-01 |
storm drain pipe arch (900 mm equiv. cmpa)(outfall)
|
162.9 |
ln m |
630.00 |
102,627.00 |
700.00 |
114,030.00 |
350.00 |
57,015.00 |
|
|
| 701-04-G |
storm drain pipe arch (1050 mm equiv. rcpa)
|
43.3 |
ln m |
730.00 |
31,609.00 |
900.00 |
38,970.00 |
770.00 |
33,341.00 |
|
|
| 701-04-G-01 |
storm drain pipe arch (1050 mm equiv. cmpa)(outfall)
|
62.1 |
ln m |
1,100.00 |
68,310.00 |
700.00 |
43,470.00 |
600.00 |
37,260.00 |
|
|
| 701-04-L |
storm drain pipe arch (1800 mm equiv. rcpa)
|
94.7 |
ln m |
1,500.00 |
142,050.00 |
1,400.00 |
132,580.00 |
1,500.00 |
142,050.00 |
|
|
| 701-04-L-01 |
storm drain pipe arch (1800 mm equiv. cmpa)(outfall)
|
24.9 |
ln m |
4,100.00 |
102,090.00 |
1,200.00 |
29,880.00 |
1,000.00 |
24,900.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
12.2 |
ln m |
200.00 |
2,440.00 |
200.00 |
2,440.00 |
420.00 |
5,124.00 |
|
|
| 701-06-F |
side drain pipe arch (900 mm equiv.)
|
25.2 |
ln m |
780.00 |
19,656.00 |
500.00 |
12,600.00 |
630.00 |
15,876.00 |
|
|
| 701-06-G |
side drain pipe arch (1050 mm equiv.)
|
107.6 |
ln m |
950.00 |
102,220.00 |
600.00 |
64,560.00 |
790.00 |
85,004.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
39   |
ea |
1,000.00 |
39,000.00 |
1,100.00 |
42,900.00 |
3,000.00 |
117,000.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
5   |
ea |
8,000.00 |
40,000.00 |
9,000.00 |
45,000.00 |
14,000.00 |
70,000.00 |
|
|
| 702-02-F |
manholes (mh-01)
|
49   |
ea |
5,300.00 |
259,700.00 |
10,000.00 |
490,000.00 |
6,000.00 |
294,000.00 |
|
|
| 702-02-G |
manholes (r-cb-46)
|
9   |
ea |
4,300.00 |
38,700.00 |
3,000.00 |
27,000.00 |
8,000.00 |
72,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
124   |
ea |
4,900.00 |
607,600.00 |
3,000.00 |
372,000.00 |
3,000.00 |
372,000.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
3   |
ea |
7,400.00 |
22,200.00 |
6,000.00 |
18,000.00 |
6,500.00 |
19,500.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
201   |
ea |
5,300.00 |
1,065,300.00 |
7,000.00 |
1,407,000.00 |
5,000.00 |
1,005,000.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
29   |
ea |
10,900.00 |
316,100.00 |
12,000.00 |
348,000.00 |
9,000.00 |
261,000.00 |
|
|
| 702-03-I |
catch basins (r-cb-22a)
|
11   |
ea |
9,600.00 |
105,600.00 |
10,000.00 |
110,000.00 |
9,000.00 |
99,000.00 |
|
|
| 702-04-A |
adjusting manholes
|
4   |
ea |
500.00 |
2,000.00 |
700.00 |
2,800.00 |
2,000.00 |
8,000.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
8,907   |
ln m |
30.00 |
267,210.00 |
23.00 |
204,861.00 |
40.00 |
356,280.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(1905 mm post spacing)
|
13.35 |
ln m |
150.00 |
2,002.50 |
175.00 |
2,336.25 |
145.00 |
1,935.75 |
|
|
| 704-01-C |
guard rail (double thrie beam)(950 mm post spacing)
|
15.24 |
ln m |
170.00 |
2,590.80 |
180.00 |
2,743.20 |
165.00 |
2,514.60 |
|
|
| 704-03 |
blocked out guard rail
|
136.73 |
ln m |
60.00 |
8,203.80 |
65.00 |
8,887.45 |
60.00 |
8,203.80 |
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
7.64 |
ln m |
200.00 |
1,528.00 |
200.00 |
1,528.00 |
195.00 |
1,489.80 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
64.78 |
ln m |
165.00 |
10,688.70 |
180.00 |
11,660.40 |
160.00 |
10,364.80 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
2,100.00 |
16,800.00 |
2,100.00 |
16,800.00 |
2,000.00 |
16,000.00 |
|
|
| 705-06-B |
chain link fence (1500 mm height)
|
437   |
ln m |
60.00 |
26,220.00 |
60.00 |
26,220.00 |
60.00 |
26,220.00 |
|
|
| 706-01-A |
concrete walk (100 mm thick)
|
10,057.3 |
sq m |
58.00 |
583,323.40 |
60.00 |
603,438.00 |
60.00 |
603,438.00 |
|
|
| 706-02-A |
concrete drive (100 mm thick)
|
4,376.6 |
sq m |
64.00 |
280,102.40 |
60.00 |
262,596.00 |
62.00 |
271,349.20 |
|
|
| 706-03-A |
incidental concrete paving (100 mm thick)
|
257.0 |
sq m |
58.00 |
14,906.00 |
60.00 |
15,420.00 |
65.00 |
16,705.00 |
|
|
| 708-01 |
right-of-way monument
|
257   |
ea |
170.00 |
43,690.00 |
100.00 |
25,700.00 |
140.00 |
35,980.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
153,000.00 |
153,000.00 |
500,000.00 |
500,000.00 |
375,000.00 |
375,000.00 |
|
|
| 713-03-C |
temporary pavement markings (200 mm width)
|
775   |
ln m |
1.00 |
775.00 |
1.00 |
775.00 |
1.33 |
1,030.75 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
12.029 |
km |
180.00 |
2,165.22 |
100.00 |
1,202.90 |
610.00 |
7,337.69 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
2.989 |
km |
1,000.00 |
2,989.00 |
1,000.00 |
2,989.00 |
936.00 |
2,797.70 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
24   |
ea |
58.00 |
1,392.00 |
60.00 |
1,440.00 |
54.00 |
1,296.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
24   |
ea |
58.00 |
1,392.00 |
60.00 |
1,440.00 |
54.00 |
1,296.00 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
3,261   |
ea |
5.50 |
17,935.50 |
6.00 |
19,566.00 |
5.20 |
16,957.20 |
|
|
| 716-01-A |
mulch (vegetative)
|
1.0 |
hctr |
2,100.00 |
2,100.00 |
2,400.00 |
2,400.00 |
2,000.00 |
2,000.00 |
|
|
| 717-01 |
seeding
|
168   |
kg |
18.00 |
3,024.00 |
20.00 |
3,360.00 |
18.00 |
3,024.00 |
|
|
| 718-01 |
fertilizer
|
5,609   |
kg |
0.60 |
3,365.40 |
0.60 |
3,365.40 |
0.50 |
2,804.50 |
|
|
| 719-01-A |
plants (magnolia grandiflora 'brackens brown beauty'
246 liter container only) |
73   |
ea |
850.00 |
62,050.00 |
1,000.00 |
73,000.00 |
840.00 |
61,320.00 |
|
|
| 719-01-B |
plants (elaeagnus (elaeagnus pungens 'rotundifolia'))
(27 liter container only) |
15   |
ea |
52.00 |
780.00 |
60.00 |
900.00 |
50.00 |
750.00 |
|
|
| 719-02 |
top dressing mulch (152mm depth)
|
179   |
sq m |
12.00 |
2,148.00 |
14.00 |
2,506.00 |
12.00 |
2,148.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
365   |
sq m |
1.50 |
547.50 |
1.80 |
657.00 |
1.50 |
547.50 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
98   |
sq m |
2.50 |
245.00 |
3.00 |
294.00 |
2.50 |
245.00 |
|
|
| 721-01 |
asphalt mulch
|
606   |
l |
0.65 |
393.90 |
0.70 |
424.20 |
0.60 |
363.60 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
25,000.00 |
25,000.00 |
70,000.00 |
70,000.00 |
10,000.00 |
10,000.00 |
|
|
| 725-02 |
temporary detour roads
|
3,710.6 |
sq m |
100.00 |
371,060.00 |
93.00 |
345,085.80 |
130.00 |
482,378.00 |
|
|
| 726-01 |
bedding material
|
14,448.2 |
cu m |
94.00 |
1,358,130.80 |
90.00 |
1,300,338.00 |
80.00 |
1,155,856.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
2,350,000.00 |
2,350,000.00 |
1,200,000.00 |
1,200,000.00 |
3,100,000.00 |
3,100,000.00 |
|
|
| 729-01 |
sign (type a)
|
26.29 |
sq m |
300.00 |
7,887.00 |
220.00 |
5,783.80 |
278.00 |
7,308.62 |
|
|
| 729-21 |
u-channel post
|
2   |
ea |
60.00 |
120.00 |
90.00 |
180.00 |
55.00 |
110.00 |
|
|
| 730-01 |
trenching and backfilling
|
390   |
ln m |
10.00 |
3,900.00 |
10.00 |
3,900.00 |
10.00 |
3,900.00 |
|
|
| 730-02-A |
conduit with conductors (2-#8, 1-#8gd in 32mm rgs
conduit) |
20   |
linm |
55.00 |
1,100.00 |
60.00 |
1,200.00 |
52.00 |
1,040.00 |
|
|
| 730-02-B |
conduit with conductors (2-#8, 1-#8gd in 25mm rgs
conduit) |
330   |
linm |
21.00 |
6,930.00 |
22.00 |
7,260.00 |
20.00 |
6,600.00 |
|
|
| 730-02-C |
conduit with conductors (2-#8, 1-#8gd in 25mm pvc
conduit) |
60   |
linm |
20.00 |
1,200.00 |
20.00 |
1,200.00 |
20.00 |
1,200.00 |
|
|
| 730-08 |
electrical service point
|
1   |
ea |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
|
|
| 730-11 |
removal and disposal of electrical equipment
|
lump |
lump |
700.00 |
700.00 |
700.00 |
700.00 |
650.00 |
650.00 |
|
|
| 730-15 |
relocate light poles (size and type)
|
8   |
ea |
2,400.00 |
19,200.00 |
2,500.00 |
20,000.00 |
2,300.00 |
18,400.00 |
|
|
| 730-18 |
service pole
|
1   |
ea |
800.00 |
800.00 |
900.00 |
900.00 |
750.00 |
750.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,181   |
each |
5.50 |
11,995.50 |
6.00 |
13,086.00 |
5.30 |
11,559.30 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
32.803 |
km |
1,500.00 |
49,204.50 |
1,500.00 |
49,204.50 |
1,550.00 |
50,844.65 |
|
|
| 732-02-C |
plastic pavement striping (solid line)(200 mm width)
|
0.467 |
km |
3,000.00 |
1,401.00 |
3,000.00 |
1,401.00 |
2,937.00 |
1,371.58 |
|
|
| 732-02-E |
plastic pavement striping (solid line)(600 mm width)
|
0.312 |
km |
6,000.00 |
1,872.00 |
7,000.00 |
2,184.00 |
10,000.00 |
3,120.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
17.117 |
km |
1,500.00 |
25,675.50 |
1,500.00 |
25,675.50 |
1,469.00 |
25,144.87 |
|
|
| 732-03-C |
plastic pavement striping (broken line)(200 mm width)
|
0.204 |
km |
3,000.00 |
612.00 |
3,000.00 |
612.00 |
2,939.02 |
599.56 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
30   |
ea |
160.00 |
4,800.00 |
200.00 |
6,000.00 |
155.00 |
4,650.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
24   |
ea |
175.00 |
4,200.00 |
200.00 |
4,800.00 |
165.00 |
3,960.00 |
|
|
| 736-01 |
trenching and backfilling
|
1,160   |
ln m |
10.00 |
11,600.00 |
10.00 |
11,600.00 |
9.50 |
11,020.00 |
|
|
| 736-03-A |
jacking or boring conduit (75mm pec)
|
294   |
ln m |
55.00 |
16,170.00 |
60.00 |
17,640.00 |
55.00 |
16,170.00 |
|
|
| 736-04-A |
signal support (12.2m mast arm)
|
1   |
each |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
7,800.00 |
7,800.00 |
|
|
| 736-04-B |
signal support (13.7m mast arm)
|
3   |
each |
9,000.00 |
27,000.00 |
9,000.00 |
27,000.00 |
8,500.00 |
25,500.00 |
|
|
| 736-04-C |
signal support (16.8m mast arm)
|
3   |
each |
10,500.00 |
31,500.00 |
12,000.00 |
36,000.00 |
10,000.00 |
30,000.00 |
|
|
| 736-04-D |
signal support (8.5m strain pole)
|
2   |
each |
6,400.00 |
12,800.00 |
7,000.00 |
14,000.00 |
6,200.00 |
12,400.00 |
|
|
| 736-04-E |
signal support (8.8m strain pole)
|
2   |
each |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
6,228.00 |
12,456.00 |
|
|
| 736-04-G |
signal support (3.0m pedestal pole)
|
1   |
each |
1,200.00 |
1,200.00 |
1,400.00 |
1,400.00 |
1,200.00 |
1,200.00 |
|
|
| 736-05-B |
signal heads (3-section, 305mm lens)
|
38   |
each |
850.00 |
32,300.00 |
900.00 |
34,200.00 |
850.00 |
32,300.00 |
|
|
| 736-05-C |
signal heads (4-section, 305mm lens)
|
1   |
each |
1,100.00 |
1,100.00 |
1,200.00 |
1,200.00 |
1,000.00 |
1,000.00 |
|
|
| 736-06 |
signal service
|
3   |
each |
1,100.00 |
3,300.00 |
1,200.00 |
3,600.00 |
1,000.00 |
3,000.00 |
|
|
| 736-08 |
signal controller
|
3   |
each |
20,000.00 |
60,000.00 |
20,000.00 |
60,000.00 |
18,500.00 |
55,500.00 |
|
|
| 736-09-A |
loop detector
|
1,287   |
ln m |
42.00 |
54,054.00 |
44.00 |
56,628.00 |
40.00 |
51,480.00 |
|
|
| 736-10-A |
underground junction box (type d)
|
9   |
each |
300.00 |
2,700.00 |
300.00 |
2,700.00 |
275.00 |
2,475.00 |
|
|
| 736-10-B |
underground junction box (type e)
|
10   |
each |
325.00 |
3,250.00 |
350.00 |
3,500.00 |
315.00 |
3,150.00 |
|
|
| 736-10-C |
underground junction box (type f)
|
14   |
each |
400.00 |
5,600.00 |
400.00 |
5,600.00 |
375.00 |
5,250.00 |
|
|
| 736-10-D |
underground junction box (type g)
|
23   |
each |
750.00 |
17,250.00 |
800.00 |
18,400.00 |
700.00 |
16,100.00 |
|
|
| 736-10-E |
underground junction box (type h)
|
3   |
each |
800.00 |
2,400.00 |
800.00 |
2,400.00 |
745.00 |
2,235.00 |
|
|
| 736-11-A |
conduit (25mm pec)
|
412   |
ln m |
10.00 |
4,120.00 |
10.00 |
4,120.00 |
10.00 |
4,120.00 |
|
|
| 736-11-B |
conduit (50mm pec, sch 80)
|
707   |
ln m |
10.00 |
7,070.00 |
10.00 |
7,070.00 |
9.00 |
6,363.00 |
|
|
| 736-11-C |
conduit (76mm pec, sch 80)
|
41   |
ln m |
18.00 |
738.00 |
18.00 |
738.00 |
16.00 |
656.00 |
|
|
| 736-12-A |
conductor (3c #6 awg, concentric, service)
|
33   |
ln m |
16.00 |
528.00 |
16.00 |
528.00 |
15.00 |
495.00 |
|
|
| 736-12-B |
conductor (2c #14 awg, stranded and shielded)
|
1,314   |
ln m |
6.00 |
7,884.00 |
6.00 |
7,884.00 |
6.00 |
7,884.00 |
|
|
| 736-12-D |
conductor (10c #14 awg, stranded)
|
849   |
ln m |
7.00 |
5,943.00 |
7.00 |
5,943.00 |
6.50 |
5,518.50 |
|
|
| 736-12-E |
conductor (6 pair #19 awg, imsa 20-6, interconnect)
|
728   |
ln m |
9.00 |
6,552.00 |
9.00 |
6,552.00 |
8.00 |
5,824.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
200,000.00 |
200,000.00 |
500,000.00 |
500,000.00 |
400,000.00 |
400,000.00 |
|
|
| 742-01-A |
sanitary sewer pipe (100mm)
|
42   |
ln m |
100.00 |
4,200.00 |
270.00 |
11,340.00 |
350.00 |
14,700.00 |
|
|
| 742-01-B |
sanitary sewer pipe (200mm)
|
176   |
ln m |
120.00 |
21,120.00 |
280.00 |
49,280.00 |
400.00 |
70,400.00 |
|
|
| 742-01-C |
sanitary sewer pipe (cast iron)(200mm)
|
6   |
ln m |
400.00 |
2,400.00 |
500.00 |
3,000.00 |
500.00 |
3,000.00 |
|
|
| 742-04-A |
casing(200mm concrete)
|
13   |
ln m |
300.00 |
3,900.00 |
500.00 |
6,500.00 |
250.00 |
3,250.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
17,000.00 |
17,000.00 |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
|
|
| 805-01 |
class a concrete
|
169.47 |
cu m |
2,610.00 |
442,316.70 |
2,500.00 |
423,675.00 |
2,000.00 |
338,940.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
14,114   |
kg |
2.75 |
38,813.50 |
3.00 |
42,342.00 |
2.00 |
28,228.00 |
|
|
| S-001 |
pedestrian push button detector
|
14   |
each |
160.00 |
2,240.00 |
180.00 |
2,520.00 |
150.00 |
2,100.00 |
|
|
| S-002 |
dynamic message sign unit
|
2   |
each |
20,000.00 |
40,000.00 |
25,000.00 |
50,000.00 |
30,000.00 |
60,000.00 |
|
|
| S-003 |
tree trimming
|
8   |
each |
3,000.00 |
24,000.00 |
4,000.00 |
32,000.00 |
2,800.00 |
22,400.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
17,865,630.81 |
|
20,736,889.80 |
|
24,056,858.12 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement type
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
pcc
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
20,288.1 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
80.00 |
1,623,048.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
400.5 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
120.00 |
48,060.00 |
|
|
| 601-01-I |
portland cement concrete pavement (225 mm thick)
|
95,242.8 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
60.00 |
5,714,568.00 |
|
|
| 707-01 |
concrete curb
|
11,973.7 |
ln m |
0.00 |
0.00 |
0.00 |
0.00 |
7.00 |
83,815.90 |
|
|
| | SUBTOTAL ALT A1 |
|
|
|
|
|
|
|
7,469,491.90 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
asphalt
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
66,738.6 |
Mg |
68.00 |
4,538,224.80 |
91.00 |
6,073,212.60 |
0.00 |
0.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,447.8 |
Mg |
120.00 |
173,736.00 |
147.00 |
212,826.60 |
0.00 |
0.00 |
|
|
| 601-01-I |
portland cement concrete pavement (225 mm thick)
|
2,803.6 |
sq m |
75.00 |
210,270.00 |
69.00 |
193,448.40 |
0.00 |
0.00 |
|
|
| 707-03 |
combination concrete curb and gutter
|
11,973.7 |
ln m |
70.00 |
838,159.00 |
89.00 |
1,065,659.30 |
0.00 |
0.00 |
|
|
| | SUBTOTAL ALT A2 |
|
|
|
5,760,389.80 |
|
7,545,146.90 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
23,626,020.61 |
|
28,282,036.70 |
|
31,526,350.02 |
|
|
| | Number of Days Bid at $5,000 per day. |
|
|
550 |
2,750,000.00 |
600 |
3,000,000.00 |
677 |
3,385,000.00 |
0 |
|
| | Life Cycle Cost |
|
|
|
2,366,200.00 |
|
2,366,200.00 |
|
1,625,500.00 |
|
|
| | TOTAL BID |
|
|
|
28,742,220.61 |
|
33,648,236.70 |
|
36,536,850.02 |
|
|
|