| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - SHAVERS-WHITTLE CONSTRUCTION INC |
- 3 - JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
40,000.00 |
40,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
17,500.00 |
17,500.00 |
11,000.00 |
11,000.00 |
|
|
| 203-02 |
drainage excavation
|
209   |
CUYD |
25.00 |
5,225.00 |
25.50 |
5,329.50 |
30.00 |
6,270.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
88,000.00 |
88,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
200.00 |
1,200.00 |
85.00 |
510.00 |
150.00 |
900.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,700   |
LNFT |
3.00 |
5,100.00 |
1.50 |
2,550.00 |
3.00 |
5,100.00 |
|
|
| 302-01 |
class ii base course
|
404.5 |
CUYD |
85.00 |
34,382.50 |
100.00 |
40,450.00 |
100.00 |
40,450.00 |
|
|
| 304-01 |
lime
|
17.19 |
TON |
200.00 |
3,438.00 |
200.00 |
3,438.00 |
135.00 |
2,320.65 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,212   |
SQYD |
2.00 |
2,424.00 |
5.00 |
6,060.00 |
4.00 |
4,848.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
8   |
CUYD |
100.00 |
800.00 |
67.00 |
536.00 |
90.00 |
720.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
10.00 |
1,000.00 |
25.00 |
2,500.00 |
80.00 |
8,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
468.9 |
TON |
120.00 |
56,268.00 |
150.00 |
70,335.00 |
125.00 |
58,612.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
84.8 |
TON |
150.00 |
12,720.00 |
150.00 |
12,720.00 |
125.00 |
10,600.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
680   |
LNFT |
45.00 |
30,600.00 |
39.50 |
26,860.00 |
45.00 |
30,600.00 |
|
|
| 704-03 |
blocked out guard rail
|
12.5 |
LNFT |
25.00 |
312.50 |
30.00 |
375.00 |
20.00 |
250.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
65.00 |
6,500.00 |
65.00 |
6,500.00 |
53.00 |
5,300.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,100.00 |
8,400.00 |
2,800.00 |
11,200.00 |
2,000.00 |
8,000.00 |
|
|
| 705-01 |
barbed wire fence
|
1,020   |
LNFT |
10.00 |
10,200.00 |
8.00 |
8,160.00 |
6.00 |
6,120.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
603   |
LNFT |
15.00 |
9,045.00 |
12.00 |
7,236.00 |
10.00 |
6,030.00 |
|
|
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
350.00 |
350.00 |
350.00 |
350.00 |
800.00 |
800.00 |
|
|
| 708-01 |
right-of-way monument
|
19   |
EACH |
200.00 |
3,800.00 |
100.00 |
1,900.00 |
150.00 |
2,850.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
19   |
EACH |
200.00 |
3,800.00 |
140.00 |
2,660.00 |
50.00 |
950.00 |
|
|
| 711-01-E |
riprap (130 lb, 24" thick)
|
1,147   |
SQYD |
75.00 |
86,025.00 |
60.00 |
68,820.00 |
75.00 |
86,025.00 |
|
|
| 711-04 |
geotextile fabric
|
1,649   |
SQYD |
2.50 |
4,122.50 |
1.75 |
2,885.75 |
2.50 |
4,122.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
23,000.00 |
23,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
|
|
| 717-01 |
seeding
|
34   |
LB |
20.00 |
680.00 |
12.00 |
408.00 |
25.00 |
850.00 |
|
|
| 718-01 |
fertilizer
|
1,128   |
LB |
1.00 |
1,128.00 |
0.35 |
394.80 |
0.50 |
564.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
45,000.00 |
45,000.00 |
5,000.00 |
5,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
165,000.00 |
165,000.00 |
190,000.00 |
190,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
75.00 |
300.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
30   |
EACH |
20.00 |
600.00 |
18.00 |
540.00 |
15.00 |
450.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
63   |
EACH |
10.00 |
630.00 |
8.00 |
504.00 |
10.00 |
630.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.429 |
MILE |
3,000.00 |
1,287.00 |
4,500.00 |
1,930.50 |
6,000.00 |
2,574.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.189 |
MILE |
1,000.00 |
189.00 |
1,500.00 |
283.50 |
2,000.00 |
378.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
91.81 |
CUYD |
800.00 |
73,448.00 |
1,000.00 |
91,810.00 |
2,000.00 |
183,620.00 |
|
|
| 805-03 |
class aa concrete
|
254.08 |
CUYD |
730.00 |
185,478.40 |
750.00 |
190,560.00 |
1,150.00 |
292,192.00 |
|
|
| 805-08-D |
precast-prestressed concrete girder (type iv)
|
1,074.0 |
LNFT |
175.00 |
187,950.00 |
175.00 |
187,950.00 |
250.00 |
268,500.00 |
|
|
| 805-11 |
strip seal joints
|
60.00 |
LNFT |
150.00 |
9,000.00 |
145.00 |
8,700.00 |
180.00 |
10,800.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
88,520   |
LB |
0.80 |
70,816.00 |
0.85 |
75,242.00 |
1.25 |
110,650.00 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
7,500.00 |
7,500.00 |
3,500.00 |
3,500.00 |
15,000.00 |
15,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
620.00 |
LNFT |
55.00 |
34,100.00 |
65.00 |
40,300.00 |
75.00 |
46,500.00 |
|
|
| 813-01 |
concrete approach slabs
|
266.46 |
SQYD |
195.00 |
51,959.70 |
165.00 |
43,965.90 |
200.00 |
53,292.00 |
|
|
| S-101 |
dotd furnished 14" piles
|
200.00 |
LNFT |
35.00 |
7,000.00 |
40.00 |
8,000.00 |
120.00 |
24,000.00 |
|
|
| S-102 |
dotd furnished 30" piles
|
1,296.00 |
LNFT |
105.00 |
136,080.00 |
240.00 |
311,040.00 |
200.00 |
259,200.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,414,058.60 |
|
1,675,403.95 |
|
1,982,368.65 |
|
|
|