Letting of 5/31/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 829-15-0025
Parish: LAFOURCHE
Routes: LA 307
Description: LA 307 (BAYOU BOEUF - LA 182)
Type Const: grading, cold planing asphaltic concrete pavement, pavement patching, superpave
asphaltic concrete overlay, and related work
Estimated Construction Cost: $2,119,895.95
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $2,081,308.05
2 06487 HUEY STOCKSTILL, INC. $2,227,729.80
3 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,464,952.53
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 800      CUYD 10.00 8,000.00 14.00 11,200.00 30.00 24,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
1,949      CUYD 40.00 77,960.00 45.00 87,705.00 30.00 58,470.00    
502-01 superpave asphaltic concrete 28,357.7    TON 58.00 1,644,746.60 58.00 1,644,746.60 55.00 1,559,673.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
75.0    TON 58.00 4,350.00 125.00 9,375.00 115.00 8,625.00    
509-01 cold planing asphaltic pavement 118,741      SQYD 1.00 118,741.00 2.00 237,482.00 2.00 237,482.00    
509-02 contractor retained reclaimed asphaltic pavement - 6,597      CUYD 10.00 - 65,970.00 13.00 - 85,761.00 0.01 - 65.97    
701-01-G cross drain pipe (18" rcp/pcp) 48      LNFT 60.00 2,880.00 75.00 3,600.00 180.00 8,640.00    
701-01-I cross drain pipe (24" rcp/pcp) 104      LNFT 90.00 9,360.00 85.00 8,840.00 200.00 20,800.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 21,000.00 21,000.00 70,000.00 70,000.00    
713-03-E temporary pavement markings (24" width) 198      LNFT 1.50 297.00 1.00 198.00 0.50 99.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
20.340  MILE 200.00 4,068.00 500.00 10,170.00 500.00 10,170.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.310  MILE 2.00 22.62 10.00 113.10 100.00 1,131.00    
713-05-A temporary pavement markings (solid line)(4" width) 98.610  MILE 3.00 295.83 10.00 986.10 100.00 9,861.00    
724-01-B pavement patching (12" minimum thickness) 1,500      SQYD 20.00 30,000.00 20.00 30,000.00 85.00 127,500.00    
726-01 bedding material 55.0    CUYD 50.00 2,750.00 80.00 4,400.00 60.00 3,300.00    
727-01 mobilization lump      LUMP 130,000.00 130,000.00 140,000.00 140,000.00 90,000.00 90,000.00    
729-16-B object marker assembly (type 2) 6      EACH 65.00 390.00 70.00 420.00 45.00 270.00    
731-02 reflectorized raised pavement markers 1,250      EACH 5.50 6,875.00 6.00 7,500.00 7.00 8,750.00    
732-01-E plastic pavement striping (24" width) 110      LNFT 3.00 330.00 3.00 330.00 4.00 440.00    
732-02-A plastic pavement striping (solid line) (4" width) 32.870  MILE 2,400.00 78,888.00 2,300.00 75,601.00 2,700.00 88,749.00    
732-03-A plastic pavement striping (broken line)(4" width) 3.770  MILE 900.00 3,393.00 900.00 3,393.00 1,100.00 4,147.00    
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 500.00 1,000.00 500.00 1,000.00 500.00 1,000.00    
732-04-E plastic pavement legends & symbols (school crossing) 2      EACH 550.00 1,100.00 500.00 1,000.00 500.00 1,000.00    
735-01 mailboxes 11      EACH 1.00 11.00 1.00 11.00 1.00 11.00    
735-02 mailbox supports (single) 11      EACH 120.00 1,320.00 220.00 2,420.00 200.00 2,200.00    
740-01 construction layout lump      LUMP 10,000.00 10,000.00 7,000.00 7,000.00 50,000.00 50,000.00    
744-01 traffic control management lump      LUMP 500.00 500.00 5,000.00 5,000.00 78,700.00 78,700.00    
                       
 CONTRACTOR TOTAL       2,081,308.05   2,227,729.80   2,464,952.53    