Lead Project: 713-09-0017
Parish: CADDO
Routes:
Description: GUARD RAIL REPLACEMENT
Type Const: guard rail replacement and related work.
Estimated Construction Cost: $130,504.50
 
RankLicenseBidderConstruction Bid
1 34068 ALPHA SERVICE AND PRODUCTS, INC. $96,485.65
2 41747 ODUM SERVICES, L.P. $130,914.40
3 38764 ATWOOD FENCE COMPANY INC. $176,023.50
4 27043 JACK B. HARPER CONTRACTOR, INC. $243,699.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
ALPHA SERVICE AND PRODUCTS, INC.
- 2 -
ODUM SERVICES, L.P.
- 3 -
ATWOOD FENCE COMPANY INC.
- 4 -
JACK B. HARPER CONTRACTOR, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 629      LNFT 4.25 2,673.25 6.00 3,774.00 5.50 3,459.50 5.50 3,459.50
203-08 borrow (vehicular measurement) 300      CUYD 1.00 300.00 28.00 8,400.00 36.00 10,800.00 25.00 7,500.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 600.0    LNFT 30.00 18,000.00 45.00 27,000.00 55.00 33,000.00 150.00 90,000.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 569.4    LNFT 46.00 26,192.40 66.00 37,580.40 60.00 34,164.00 100.00 56,940.00
704-09 guard rail anchor sections (turndown) 200.0    LNFT 23.00 4,600.00 30.00 6,000.00 45.00 9,000.00 200.00 40,000.00
704-11-A guard rail end treatment (flared) 16      EACH 1,850.00 29,600.00 2,100.00 33,600.00 2,000.00 32,000.00 1,800.00 28,800.00
713-01 temporary signs & barricades lump      LUMP 2,000.00 2,000.00 2,500.00 2,500.00 22,500.00 22,500.00 4,000.00 4,000.00
727-01 mobilization lump      LUMP 8,000.00 8,000.00 5,000.00 5,000.00 7,500.00 7,500.00 4,000.00 4,000.00
729-16-C object marker assembly (type 3) 48      EACH 65.00 3,120.00 95.00 4,560.00 75.00 3,600.00 125.00 6,000.00
740-01 construction layout lump      LUMP 2,000.00 2,000.00 2,500.00 2,500.00 20,000.00 20,000.00 3,000.00 3,000.00
                       
 CONTRACTOR TOTAL       96,485.65   130,914.40   176,023.50   243,699.50