| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. MILLER & SONS, LLC |
- 2 - GUINN BROTHERS, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
24,600.00 |
24,600.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 15+00.28, 20.30' wide x 39.72'
long; timber bridge) |
1   |
EACH |
15,100.00 |
15,100.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 15+47.90, 19.10' wide x 52.25'
long; timber bridge) |
1   |
EACH |
22,700.00 |
22,700.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
223.4 |
SQYD |
9.00 |
2,010.60 |
6.00 |
1,340.40 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
42,100.00 |
42,100.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
9.00 |
144.00 |
10.00 |
160.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
80   |
LNFT |
13.00 |
1,040.00 |
10.00 |
800.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
162.00 |
1,296.00 |
100.00 |
800.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
980   |
LNFT |
3.00 |
2,940.00 |
3.00 |
2,940.00 |
|
|
|
|
| 302-01-A |
class ii base course(stone or recycled pccp)
|
133.3 |
CUYD |
81.00 |
10,797.30 |
125.00 |
16,662.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5   |
CUYD |
95.00 |
475.00 |
125.00 |
625.00 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
66.0 |
CUYD |
70.00 |
4,620.00 |
FREE |
FREE |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
103.9 |
TON |
390.00 |
40,521.00 |
340.00 |
35,326.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
57.00 |
11,400.00 |
60.00 |
12,000.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
26.00 |
5,200.00 |
32.00 |
6,400.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
271   |
SQYD |
58.00 |
15,718.00 |
90.00 |
24,390.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,100.00 |
30,100.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
71.00 |
1,136.00 |
100.00 |
1,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,536   |
LNFT |
47.00 |
72,192.00 |
55.00 |
84,480.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
100.00 |
200.00 |
1.00 |
2.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24' clear
roadway;90 degree crossing; precast) |
5   |
SPAN |
18,200.00 |
91,000.00 |
23,000.00 |
115,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs(24'clear roadway;90 degree
crossing)(w/out asphalt) |
4   |
EACH |
8,080.00 |
32,320.00 |
8,500.00 |
34,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
481,609.90 |
|
493,525.90 |
|
|
|
|
|