Letting of 5/31/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-06-0121
Parish: BEAUREGARD
Routes:
Description: MAUL RD. BRIDGE AND KING ROAD BRIDGE
Type Const: grading, class ii base course, aggregate surface course, superpave asphaltic concrete
pavement, precast concrete span bridges, and related work
Estimated Construction Cost: $365,294.80
 
RankLicenseBidderConstruction Bid
1 00060 F. MILLER & SONS, LLC $481,609.90
2 09090 GUINN BROTHERS, LLC. $493,525.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
F. MILLER & SONS, LLC
- 2 -
GUINN BROTHERS, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 24,600.00 24,600.00 22,000.00 22,000.00        
202-02-A-01 removal of bridge (sta. 15+00.28, 20.30' wide x 39.72'
long; timber bridge)
1      EACH 15,100.00 15,100.00 6,000.00 6,000.00        
202-02-A-02 removal of bridge (sta. 15+47.90, 19.10' wide x 52.25'
long; timber bridge)
1      EACH 22,700.00 22,700.00 8,000.00 8,000.00        
202-02-G removal of surfacing & stabilized base 223.4    SQYD 9.00 2,010.60 6.00 1,340.40        
203-06 excavation & embankment lump      LUMP 42,100.00 42,100.00 30,000.00 30,000.00        
204-02 temporary hay or straw bales 16      EACH 9.00 144.00 10.00 160.00        
204-03 temporary slope drains 80      LNFT 13.00 1,040.00 10.00 800.00        
204-05-A temporary sediment check dams (hay) 8      EACH 162.00 1,296.00 100.00 800.00        
204-06 temporary silt fencing 980      LNFT 3.00 2,940.00 3.00 2,940.00        
302-01-A class ii base course(stone or recycled pccp) 133.3    CUYD 81.00 10,797.30 125.00 16,662.50        
401-02 aggregate surface course (adjusted vehicular
measurement)
5      CUYD 95.00 475.00 125.00 625.00        
403-01 aggregate roadway surfacing (vehicular measurement) 66.0    CUYD 70.00 4,620.00 FREE FREE        
502-01 superpave asphaltic concrete 103.9    TON 390.00 40,521.00 340.00 35,326.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 57.00 11,400.00 60.00 12,000.00        
704-09 guard rail anchor sections (turndown) 200.0    LNFT 26.00 5,200.00 32.00 6,400.00        
712-04 flexible revetment 271      SQYD 58.00 15,718.00 90.00 24,390.00        
713-01 temporary signs & barricades lump      LUMP 30,100.00 30,100.00 25,000.00 25,000.00        
727-01 mobilization lump      LUMP 45,000.00 45,000.00 60,000.00 60,000.00        
729-16-C object marker assembly (type 3) 16      EACH 71.00 1,136.00 100.00 1,600.00        
740-01 construction layout lump      LUMP 9,000.00 9,000.00 6,000.00 6,000.00        
804-01-B precast concrete piles (14") 1,536      LNFT 47.00 72,192.00 55.00 84,480.00        
804-12 loading permanent piles 2      EACH 100.00 200.00 1.00 2.00        
805-10-A bridge superstructure & substructure (24' clear
roadway;90 degree crossing; precast)
5      SPAN 18,200.00 91,000.00 23,000.00 115,000.00        
S-101 concrete approach slabs(24'clear roadway;90 degree
crossing)(w/out asphalt)
4      EACH 8,080.00 32,320.00 8,500.00 34,000.00        
                       
 CONTRACTOR TOTAL       481,609.90   493,525.90        