| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - STRANCO, INC. |
- 2 - MACK'S TRUCKING OF INDEPENDENCE LLC |
- 3 - THE THREE C'S PROPERTIES INC |
- 4 - CERES CARIBE INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
78   |
CUYD |
20.00 |
1,560.00 |
10.00 |
780.00 |
49.00 |
3,822.00 |
22.00 |
1,716.00 |
| 204-02 |
temporary hay or straw bales
|
60   |
EACH |
10.00 |
600.00 |
6.00 |
360.00 |
13.39 |
803.40 |
13.00 |
780.00 |
| 204-06 |
temporary silt fencing
|
600   |
LNFT |
1.60 |
960.00 |
1.50 |
900.00 |
1.20 |
720.00 |
5.00 |
3,000.00 |
| 502-01 |
superpave asphaltic concrete
|
26.5 |
TON |
120.00 |
3,180.00 |
409.25 |
10,845.13 |
222.97 |
5,908.71 |
480.00 |
12,720.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
80   |
LNFT |
165.00 |
13,200.00 |
179.22 |
14,337.60 |
254.43 |
20,354.40 |
220.00 |
17,600.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
120   |
LNFT |
205.00 |
24,600.00 |
181.08 |
21,729.60 |
275.17 |
33,020.40 |
275.00 |
33,000.00 |
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
132   |
LNFT |
255.00 |
33,660.00 |
285.16 |
37,641.12 |
297.95 |
39,329.40 |
315.00 |
41,580.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
4,969.25 |
4,969.25 |
2,900.00 |
2,900.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
251   |
SQYD |
100.00 |
25,100.00 |
132.00 |
33,132.00 |
86.60 |
21,736.60 |
150.00 |
37,650.00 |
| 726-01 |
bedding material
|
78.4 |
CUYD |
50.00 |
3,920.00 |
40.00 |
3,136.00 |
95.77 |
7,508.37 |
65.00 |
5,096.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
14,859.10 |
14,859.10 |
15,000.00 |
15,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
100.00 |
600.00 |
100.00 |
600.00 |
368.23 |
2,209.38 |
100.00 |
600.00 |
| 739-01 |
hydro-seeding
|
0.05 |
ACRE |
25,000.00 |
1,250.00 |
25,000.00 |
1,250.00 |
1,997.25 |
99.86 |
1,550.00 |
77.50 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
5,857.00 |
5,857.00 |
3,600.00 |
3,600.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
7,000.00 |
7,000.00 |
6,000.00 |
6,000.00 |
11,257.13 |
11,257.13 |
12,400.00 |
12,400.00 |
| S-001 |
cleaning existing ditches
|
600   |
LNFT |
4.00 |
2,400.00 |
5.00 |
3,000.00 |
21.65 |
12,990.00 |
8.00 |
4,800.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
133,530.00 |
|
150,711.45 |
|
185,445.00 |
|
192,519.50 |
|