| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - BEST-YET BUILDERS, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks and drives
|
109   |
SQYD |
20.00 |
2,180.00 |
10.00 |
1,090.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
51.9 |
SQYD |
125.00 |
6,487.50 |
7.00 |
363.30 |
|
|
|
|
| 202-02-I |
removal of fence
|
42   |
LNFT |
5.00 |
210.00 |
5.00 |
210.00 |
|
|
|
|
| 202-02-J |
removal of aggregrate turnout
|
85.4 |
SQYD |
10.00 |
854.00 |
5.00 |
427.00 |
|
|
|
|
| 202-02-K |
removal of pipe
|
57   |
LNFT |
10.00 |
570.00 |
10.00 |
570.00 |
|
|
|
|
| 202-02-L |
removal of drop inlet\catch basin
|
2   |
EACH |
1,500.00 |
3,000.00 |
2,000.00 |
4,000.00 |
|
|
|
|
| 202-02-M |
removal of sanitary sewer line
|
145   |
LNFT |
20.00 |
2,900.00 |
8.00 |
1,160.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,500   |
LNFT |
3.00 |
4,500.00 |
2.50 |
3,750.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate
|
54.0 |
CUYD |
85.00 |
4,590.00 |
2.00 |
108.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
72.0 |
TON |
200.00 |
14,400.00 |
220.00 |
15,840.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete,drives, turnouts and
miscellaneous |
37.3 |
TON |
200.00 |
7,460.00 |
200.00 |
7,460.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
654   |
SQYD |
12.00 |
7,848.00 |
5.00 |
3,270.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 21   |
CUYD |
5.00 |
- 105.00 |
0.01 |
- 0.21 |
|
|
|
|
| 701-03-E |
storm drain pipe (12" rcp/pp)
|
46   |
LNFT |
40.00 |
1,840.00 |
90.00 |
4,140.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pp)
|
1,408   |
LNFT |
45.00 |
63,360.00 |
150.00 |
211,200.00 |
|
|
|
|
| 701-04-B |
storm drain pipe arch (18" eq. rcpa)
|
37   |
LNFT |
80.00 |
2,960.00 |
150.00 |
5,550.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
611   |
LNFT |
5.00 |
3,055.00 |
15.00 |
9,165.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
9   |
EACH |
2,500.00 |
22,500.00 |
3,000.00 |
27,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
2   |
EACH |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
1   |
EACH |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 705-06-A |
chain link fence (4-foot height)
|
42   |
LNFT |
30.00 |
1,260.00 |
12.00 |
504.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
46.6 |
SQYD |
50.00 |
2,330.00 |
50.00 |
2,330.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
62.2 |
SQYD |
55.00 |
3,421.00 |
65.00 |
4,043.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (4" thick)
|
15.2 |
SQYD |
150.00 |
2,280.00 |
65.00 |
988.00 |
|
|
|
|
| 710-01 |
flowable fill
|
3   |
CUYD |
500.00 |
1,500.00 |
250.00 |
750.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 724-01-C |
pavement patching (8" minimum thickness)
|
134   |
SQYD |
200.00 |
26,800.00 |
150.00 |
20,100.00 |
|
|
|
|
| 726-01 |
bedding material
|
98.1 |
CUYD |
100.00 |
9,810.00 |
45.00 |
4,414.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
28,500.00 |
28,500.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
50   |
LNFT |
88.00 |
4,400.00 |
24.00 |
1,200.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
0.30 |
ACRE |
3,000.00 |
900.00 |
1,900.00 |
570.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 742-01-A |
sanitary sewer pipe (8")
|
274   |
LNFT |
60.00 |
16,440.00 |
25.00 |
6,850.00 |
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
9   |
EACH |
500.00 |
4,500.00 |
700.00 |
6,300.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
22,000.00 |
22,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
308,750.50 |
|
471,352.59 |
|
|
|
|
|