Letting of 5/31/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 082-03-0026
Parish: BOSSIER
Routes: LA 157
Description: OAKLAND - HAUGHTON HIGHWAY
Type Const: grading, drainage structures, cold planing asphaltic pvmt, superpave asphaltic concrete
overlay, pavement patching, and related work.
Estimated Construction Cost: $1,047,844.98
 
RankLicenseBidderConstruction Bid
1 36374 BEST-YET BUILDERS, LLC $1,187,713.79
2 17464 BENTON & BROWN, LLC. $1,239,656.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEST-YET BUILDERS, LLC
- 2 -
BENTON & BROWN, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 8      SQYD 9.00 72.00 65.00 520.00        
203-08 borrow (vehicular measurement) 1,000      CUYD 12.00 12,000.00 12.00 12,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
250      CUYD 35.00 8,750.00 29.00 7,250.00        
502-01 superpave asphaltic concrete 10,346.3    TON 75.00 775,972.50 70.00 724,241.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,132.5    TON 80.00 170,600.00 70.00 149,275.00        
509-01 cold planing asphaltic pavement 1,466      SQYD 1.30 1,905.80 6.00 8,796.00        
509-02 contractor retained reclaimed asphaltic pavement - 50      CUYD 0.01 - 0.50 1.00 - 50.00        
701-08 relaying pipe 8      LNFT 135.00 1,080.00 250.00 2,000.00        
701-10-K reinforced concrete pipe (extension)(30") 8      LNFT 120.00 960.00 200.00 1,600.00        
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 145.00 1,160.00 250.00 2,000.00        
701-15 concrete collars 4      EACH 690.00 2,760.00 700.00 2,800.00        
712-04 flexible revetment 615      SQYD 40.00 24,600.00 44.00 27,060.00        
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 90,000.00 90,000.00        
713-03-E temporary pavement markings (24" width) 49      LNFT 1.00 49.00 1.00 49.00        
713-04-A temporary pavement markings (broken line)(4" width)
(4'length)
4.465  MILE 1.00 4.47 360.00 1,607.40        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.178  MILE 1.00 3.18 1.00 3.18        
713-05-A temporary pavement markings (solid line)(4" width) 12.117  MILE 1.00 12.12 1.00 12.12        
713-06-A temporary pavement legends and symbols (arrow) 4      EACH 1.00 4.00 65.00 260.00        
713-06-C temporary pavement legends and symbols (only) 4      EACH 1.00 4.00 65.00 260.00        
713-06-D temporary pavement legends and symbols (rr crossing) 2      EACH 1.00 2.00 370.00 740.00        
716-01-A mulch (vegetative) 1.50   ACRE 1,500.00 2,250.00 1,900.00 2,850.00        
724-01-B pavement patching (12" minimum thickness) 300      SQYD 90.00 27,000.00 71.00 21,300.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 90,000.00 90,000.00        
729-16-B object marker assembly (type 2) 4      EACH 58.00 232.00 90.00 360.00        
729-16-C object marker assembly (type 3) 10      EACH 70.00 700.00 90.00 900.00        
731-02 reflectorized raised pavement markers 1,464      EACH 5.30 7,759.20 6.00 8,784.00        
732-01-C plastic pavement striping (8" width) 650      LNFT 0.90 585.00 1.00 650.00        
732-01-E plastic pavement striping (24" width) 303      LNFT 2.70 818.10 3.00 909.00        
732-02-A plastic pavement striping (solid line)(4" width) 12.117  MILE 2,294.00 27,796.40 2,600.00 31,504.20        
732-03-A plastic pavement striping (broken line)(4" width) 3.178  MILE 722.00 2,294.52 1,100.00 3,495.80        
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 165.00 660.00 175.00 700.00        
732-04-C plastic pavement legends & symbols (only) 4      EACH 175.00 700.00 175.00 700.00        
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 460.00 920.00 530.00 1,060.00        
735-01 mailboxes 70      EACH 5.00 350.00 1.00 70.00        
735-02 mailbox supports (single) 54      EACH 130.00 7,020.00 150.00 8,100.00        
735-03 mailbox supports (double) 8      EACH 180.00 1,440.00 210.00 1,680.00        
739-01 hydro-seeding 1.50   ACRE 1,500.00 2,250.00 780.00 1,170.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 20,000.00 20,000.00        
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 15,000.00 15,000.00        
                       
 CONTRACTOR TOTAL       1,187,713.79   1,239,656.70        