Lead Project: 077-04-0022
Parish: E BATON ROUGE
Routes: LA 73
Description: C.S.LM.M 3.306 - TIGER BEND ROAD
Type Const: cold planing asph concrete, superpave asph concrete, temp pavement markings, pavement
patching, refl raised pavement markers, plastic pavement striping, constr layout
Estimated Construction Cost: $282,850.51
 
RankLicenseBidderConstruction Bid
1 00046 BARBER BROS. CONTRACTING CO., L.L.C $450,296.50
2 00481 COASTAL BRIDGE CO., L.L.C. $483,779.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARBER BROS. CONTRACTING CO., L.L.C
- 2 -
COASTAL BRIDGE CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
421      CUYD 50.00 21,050.00 50.00 21,050.00        
502-01 superpave asphaltic concrete 2,419.6    TON 75.00 181,470.00 90.00 217,764.00        
502-01-A superpave asphaltic concrete drives, turnouts, and
miscellaneous
224.0    TON 100.00 22,400.00 150.00 33,600.00        
509-01-A cold planing asphaltic pavement (1" deep) 17,531      SQYD 2.00 35,062.00 3.00 52,593.00        
509-01-B cold planing asphaltic pavement (1 1/2" average depth) 266      SQYD 2.50 665.00 8.00 2,128.00        
509-01-C cold planing asphaltic pavement (2" deep) 547      SQYD 3.00 1,641.00 10.00 5,470.00        
509-02 contractor retained reclaimed asphaltic pavement - 244      CUYD 0.00 0.00 1.00 - 244.00        
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 20,000.00 20,000.00        
713-03-C temporary pavement markings (8" width) 243      LNFT 1.00 243.00 0.50 121.50        
713-03-E temporary pavement markings (24" width) 120      LNFT 3.00 360.00 1.50 180.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.728  MILE 400.00 1,091.20 400.00 1,091.20        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.252  MILE 400.00 500.80 375.00 469.50        
713-05-A temporary pavement markings (solid line)(4" width) 6.864  MILE 750.00 5,148.00 700.00 4,804.80        
724-01-B pavement patching (12" minimum thickness) 100      SQYD 100.00 10,000.00 80.00 8,000.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 60,000.00 60,000.00        
731-02 reflectorized raised pavement markers 216      EACH 6.00 1,296.00 6.00 1,296.00        
732-01-C plastic pavement striping (8" width) 243      LNFT 1.50 364.50 1.00 243.00        
732-01-E plastic pavement striping (24" width) 120      LNFT 4.00 480.00 3.00 360.00        
732-02-A plastic pavement striping (solid line) (4" width) 4.834  MILE 2,500.00 12,085.00 2,500.00 12,085.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.650  MILE 1,200.00 780.00 1,100.00 715.00        
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 160.00 480.00 150.00 450.00        
732-04-B plastic pavement legends & symbols (double arrow) 3      EACH 220.00 660.00 200.00 600.00        
732-04-C plastic pavement legends & symbols (only) 3      EACH 200.00 600.00 150.00 450.00        
732-05 removal of existing markings 0.092  MILE 10,000.00 920.00 6,000.00 552.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00        
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 20,000.00 20,000.00        
S-001 dynamic message sign unit 2      each 24,000.00 48,000.00 5,000.00 10,000.00        
                       
 CONTRACTOR TOTAL       450,296.50   483,779.00        