Lead Project: 026-10-0024
Parish: OUACHITA
Routes: LA 15
Description: RICHLAND P/L TO US 165
Type Const: asphalt surface treatment and striping
Estimated Construction Cost: $1,624,182.20
 
RankLicenseBidderConstruction Bid
1 05635 DREHER CONTRACTING, INC. $1,211,961.03
2 30339 MISSOURI PETROLEUM PRODUCTS CO. LLC $1,241,754.86
3 14422 T. L. WALLACE CONSTRUCTION, INC. $1,315,125.84
 
Item Number Item Description Quantity Unit of Measure - 1 -
DREHER CONTRACTING, INC.
- 2 -
MISSOURI PETROLEUM PRODUCTS CO. LLC
- 3 -
T. L. WALLACE CONSTRUCTION, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01-A asphaltic surface treatment (1 application) 688,892      SQYD 1.39 957,559.88 1.43 985,115.56 1.52 1,047,115.84    
713-01 temporary signs & barricades lump      LUMP 31,000.00 31,000.00 29,500.00 29,500.00 40,000.00 40,000.00    
713-07-A temporary reflectorized raised pavement markers (tabs) 7,212      EACH 1.25 9,015.00 0.50 3,606.00 1.00 7,212.00    
727-01 mobilization lump      LUMP 25,000.00 25,000.00 45,000.00 45,000.00 20,000.00 20,000.00    
731-02 reflectorized raised pavement markers 7,212      EACH 4.25 30,651.00 3.85 27,766.20 4.50 32,454.00    
732-01-C plastic pavement striping (8" width) 900      LNFT 3.00 2,700.00 2.50 2,250.00 0.80 720.00    
732-01-E plastic pavement striping (24" width) 116      LNFT 5.00 580.00 4.50 522.00 2.40 278.40    
732-02-A-03 plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness)
119.670  MILE 1,100.00 131,637.00 1,050.00 125,653.50 1,200.00 143,604.00    
732-03-A-03 plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick)
34.354  MILE 475.00 16,318.15 400.00 13,741.60 400.00 13,741.60    
732-04-A plastic pavement legends & symbols (arrow) 8      EACH 250.00 2,000.00 200.00 1,600.00 150.00 1,200.00    
732-04-C plastic pavement legends & symbols (only) 4      EACH 250.00 1,000.00 200.00 800.00 150.00 600.00    
732-04-D plastic pavement legends & symbols (rr crossing) 3      EACH 500.00 1,500.00 400.00 1,200.00 400.00 1,200.00    
744-01 traffic control management lump      LUMP 3,000.00 3,000.00 5,000.00 5,000.00 7,000.00 7,000.00    
                       
 CONTRACTOR TOTAL       1,211,961.03   1,241,754.86   1,315,125.84    